How should QA and Devs work together within an Scrum Agile sprint? [closed] - agile

Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 21 days ago.
Improve this question
On my team we have about 5 developers and 3 QA testers.
Our sprints are 10 day sprints but our work as developers is due on the 6th day so that the QA testers can have 3 days to test our completed work before our biweekly release.
I feel like the system is very inefficient and really limits the work we can do as developers since we only have 6 days of development followed by a few days of thumb twiddling since there aren't any more user stories groomed yet.
How does everyone else do it?

Please keep in mind that what works in one team will not necessarily work in another.
(1) It's a valid question: there are so many companies with a separate QA department (to be integrated more or less quickly) or the role of sole testers within an agile team. And most of the time, the roles are brought closer together (check!) but the core idea of agility is not pursued further. How then is collaboration supposed to succeed efficiently?
(2) Most answers are valid, too: there is no golden road. You should do what increases the performance of the team. If it helps the team to split tasks into 4-hour units, then do that. If it helps to have the QA people write tests in advance: do it!
In my opinion, transparency and good communication are key. Get people together. Ask the team (within the retrospective if you like):
What is holding them back to continuously integrate code junks? (Is it the waterfall-like progress within the sprint?)
How can they deal with it?
As long as you have dependencies that only individuals (testers, writers, etc.) can do, you won't get out of the situation where someone always has to wait. So maybe it's an option for QA to define and maybe even write tests in advance. Furthermore, the developers can be authorized to perform releases independently based on these rules defined by QA. Of course, the suggested option is not feasible in all areas. It is the people who know the constraints and find solutions to solve them.

Some of the things you might try:
Break stories down as small as possible
Use stubbs and mocks to make features available to start test preparation sooner
Use a test-first approach and write automated tests before the development work starts (both the QAs and the developers can write the automated tests)

The developers' tasks should be granular enough to be completed by the developers in around 4 hours, if possible. This helps the developers complete around 2 tasks every day, and starting on day 1, the QAs will be able to start testing.
You can change the numbers according to your dynamics, but generally, granular tasks help async work and utilization.

The way you describe the dev/qa split is 'waterfall' in 2 week spurts!
One of the Agile Frameworks (DSDM) has a 'Testing Practice' of 'Testing is integrated throughout the lifecycle'.
This means Stories/PBI are tested as they have been developed not all 'saved-up' until the end of the Sprint!
Nezih TINAS answer about PBI size can be used for tasks within a Story IMHO, but I prefer end-to-end PBI that take 3 to 4 days by the developers with comprehensive Acceptance Tests; more than 4 or 5 AC usually means splitting the PBI, still end-to-end, not by front-end/back-end.
While your devs are working for 6 days, what are your 3 QA guys doing?

Related

How can Scrum work when the development team is the support team as well? [closed]

Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 5 years ago.
Improve this question
What happens in Scrum when the development team is the support team as well? How can this be improved using Jira?
We can't have a fire fighter because not all developers can solve both front-end and back-end issues.
But the support issues make team velocity difficult to obtain.
Mike Cohn wrote a good article on sprint planning for teams with a lot of interruptions.
He suggests having a rolling estimate of the average time spent on interruptions. Then allow for that when you do sprint planning.
For example, say the team averages 30% of their time spent on fixing issues. When you do the planning you plan for a capacity of 70% for development work.
As you mention in your question, nominating a person to handle issue fixes is a common approach. This is beneficial as it allows the other members of the team to focus on new development work without unexpected interruptions. In your situation where developers are specialists this is more difficult to achieve. You may want to consider doing some cross-skilling so that developers can handle a broader range of issues. They may not fix some issues as well as a specialist, but the loss in efficiency is gained back by the rest of the team avoiding interruptions.
Other things worth considering:
Triage bugs and only do the critical ones immediately. Schedule the other bug fixes as a part of your next sprint planning session. This may be easier to achieve if you have short sprints (say 1 week long) as the users will have less time to wait for a fix.
Analyse the bugs and see if some development work could potentially prevent future issues. For example, you may find that a lot of bugs occur due to bad data. Spending time making the code more tolerant to bad data can help.
Consider investing more time in automating your regression tests. This up-front investment of time can reduce the number of future bugs. It may seem like a lot of time and effort to do this, but making your workload more predictable can be valuable enough to offset this cost.
Production bugs have a bigger impact than the time spent fixing them due to the unpredictable way in which the work arises. That is why focusing on quality makes sense, even if it does seem like a lot of extra effort.
So the SCRUM is really for planned work, and if there is a lot of interruptions it may not be the best approach, maybe you should look at kanban or combination of both?
#Banarby Golden's answer very much answers the core question already, but since you've also asked about how to implement this in your JIRA project management:
I'd suggest using different projects or different epics for development and support tasks. Using a default Scrum project for development and a dedicated Kanban project for support issues seem's like a reasonable aproach to me (we are using this technique as well).
You can also create boards which span multiple projects, if you want to visualize the whole workload.
You could adapt the process based on the type of work coming in to sprints. It doesn't have to be set in stone as things can change over time.
Kanban gives teams just enough work so that they are consistently working at capacity.
Scrum divides work into sprints (fix-length iterations) allowing teams to work on top priority stories.
Scrumban is a hybrid of Kanban and Scrum. It's based on having a continuous flow of work and follows a pull-system. Stories exist in a backlog and teams still operate in sprints but WIP (Work in progress) is limited through each stage of the workflow and productivity measurements are in place using Cycle and Lead time metrics.
Note: Cycle time is the time a story takes from start to finish in the teams workflow. Lead Time is the total time the story appears on the Scrumban board.

Agile - When does it work well, and when doesn't it? [closed]

Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 5 years ago.
Improve this question
Our team is debating whether we want to become Agile or not. None of us are really fluent in Agile. I'd like some thoughts on when Agile works well, and when it doesn't.
To give a little background, we are a small group of developers, six in total. We have far more work that we can handle. Our priorities change often. What is a high priority today, may not be tomorrow. We have many applications to create and maintain. We have started to dabble in Agile practices to the extent that we have daily scrums and two-week Sprint cycles.
If you need more information to answer this, please feel free to ask.
Thanks.
Ralph Stacey's complexity matrix is commonly used to illustrate the sweet spot for Agile:
(source: typepad.com)
For simple projects (where both the requirements and the technologies are well known), the predictability is high so a predictive methodology (waterfall) works well.
For complicated and complex projects (and the vast majority of IT projects are), predictability is low and a predictive methodology won't work, an adaptive approach should be preferred. This is where Agile works well.
When both the requirements and the technologies are unknown, you're close to the chaos and the odds of failure are very high, regardless of the methodology.
I'm speaking only from experience; YMMV.
My team was unsuccessful at making agile work. IMO, it was because:
The very first time the dev team
would hear about a project, it was in
the form of a requirements document
and a deadline.
Stakeholders were often reluctant
to take time to look at the result
of a sprint's work, thus they would not take action between sprints if they thought the project was headed in the wrong direction.
When we showed stakeholders our work,
they generally just OK'd it. They
would talk about what they would
like, to which we would reply "That
can be done in about X amount of
time," to which they would reply,
"Well no need to go over the deadline
for that."
The deployment process was long and
complicated, discouraging frequent
deployments. So in practice, we
often deployed things when a 2-month
project was done, not at the end of a
sprint.
Our sprint planning meetings were
long and inefficient.
It seems everyone was confused about what scrum is (and about what our process was), except for the scrum evangelists.
So I'm pretty sure we were doing it all wrong. Don't you do it wrong, too.
Some things that have sped us up, which we continue to use:
automated builds that work on
everyone's machine (HUGE help!)
a formal arrangement for our code
repository
learning how to apply apply
abstraction mechanisms to UI code
refactoring
unit and integration tests
continuous integration
I guess you could say that our code is more agile, though our methodology is less agile. Whereas before we could not keep pace with demands, now we can.
(I'm not saying agile is bad; I'm just reporting my experience. Also, please understand that I do not choose what methodology we use.)
Reposting a related answer of mine:
The discussion is usually agile vs. waterfall, right? I am linking an article, but it is in Portuguese, so I'll try to transmit some of its ideas:
Waterfall is like chess. You think and plan a lot, try to foresee every possible issue as soon as possible. There's a lot of planning, but makes sense only on stable and well-known domains, where change isn't much expected.
Agile is like soccer (or many collective sports): decisions are made in-game and should be done fast. There's no much time to analyze every consequence. It is "ideal" for dynamic and unstable domains, where change is always expected (web applications, for instance, tend to fall in this category). Another point to note is: even if you have the best players, if they don't do well as a team, you won't be the winner.
IMHO, Scrum would be useful, because:
Once every two weeks (or every month, depending on iteration time) you'll be able to see what's working or not. And this is very valuable, specially as an "amateur" team, which is expected to be learning and finding things out much more constantly.
As amateurs, you probably won't be able to foresee everything (and that's something agile embraces)
There's more space for sharing experience (stand-up meeting, retrospective, and even planning meeting). And you share REAL experience (you must write code every week rather than just plan)
It appears your priorities are changing far too frequently for either methodology Agile or Waterfall. With priorities changing frequently, you are likely churning in and out of projects leaving a lot of them partly done. The Agile alway be ready to release may help. It has been my experience that getting a methodology in place will improve productivity.
Your situation reminds me of a project I worked on. The developer on the project asked one question at the start, "Do you want me to be do it right or be responsive?" I was on the project when it was two years into a six month project. One week the same functionality was implemented Monday, Wednesday, and Friday. Tuesday and Thursday were spent removing the functionality.
I would suggest you start adopting practices from Agile. Scheduling a short sprint period could help with changing priorites. It may be easier to maintain priorities for a period of a week or two and may make it easier to stabilize priorities. You will also need a backlog (sounds like you have a large one already).
Management may be more willing to hold off new priorities if you can slot them into a sprint in a week or two. You will also be able to identify the priority tradeoffs. If you add something to the next sprint, what will be removed.
Consider having part of the team working Agile while the others maintain the status quo. Rotate one team member each sprint as you are gaining experience. Consider having the whole team participate in a daily stand up status meeting, and the post sprint review. Once you have demonstrated increased productivity and returns to the company you should be able to increase the amount of work being done using your methodology.
Agile is a adaptive methology. Expect to be making major changes to your methodoly for the new year or two. Eventually, you should reach a stage where you are fine tuning.
In my experience, you absolutely need the following for agile (XP or Scrum at least) to work. Without these prerequisites you are likely to fail. Hard.
Team must be stable and 100% dedicated to this.
Team must be colocated in one workspace.
Customer/product owner must be available on site at all times.
Support from management. This means providing funds and courage to ensure the points above.
Give these points, you can probably tackle anything as long as you keep to the values.

Successful projects using agile methods? [closed]

Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 5 years ago.
Improve this question
I have been interested in agile methods of late and have found a lot of prescriptions and minute descriptions of a lot of practices.
Still, I remember my best projects as run-to-completion spikes followed by some debugging and minimal testing before going live.
I have been asking myself, did Flickr use agile methods? Does Facebook practice TDD? Was Gmail made in 25 minute spans followed by 5 minutes of daydream?
In other words, before I listen further to all the preaching and jump into the manuals, what evidence do I get that this is the way to be successful in a successful project in a successful company?
Of course, I am asking this because I want to read the answers, not because I want to dismiss an argument.
A related question is, how many non-Agile (Waterfall, "Big Design Up Front", etc) projects are successful? In my experience, not many. In fact, I just rolled off a two-phase project in which the first phase was traditional Waterfall and failed pretty significantly, but the second phase was iterative in nature and yielded substantially better results (on time, far fewer defects, end result was closer to client's actual needs than the original spec).
I've been doing Agile development for a few years now and, overall, have found it to be superior to the alternative. A few things I've noticed:
Agile != "no process". Agile is about having only as much process as you need and continually refining that process.
Agile requires discipline. You not only have to have a process, you have to follow it.
Agile won't turn a failing project into a success. It can help you identify that the project is failing sooner rather than later, and help you figure out why it's failing. It's about shortening the feedback loop so that you have a chance to get back on course before it's too late.
Microsoft Research recently posted an article in which they empirically evaluate some Agile methods. It's well worth a read and might provide some of the information you're looking for.
Here's a successful project of mine: http://www.sky.com
Went live after a few months.
Delivered new functionality to the CMS and servers behind the site weekly - with deployments typically every week or so.
All done with all the extreme programming disciplines.
Weekly demos to the customer to go with the weekly iterations.
Here's another agile project (also done strictly with XP), also a big success: http://showbiz.sky.com/
I've also worked on two other successful XP projects:
Banking A system for cleaning up and distributing fixed income data across investment bank sites in NY, London, Paris and Tokyo. I believe the whole project only had one production incident over the course of a few years.
Mobile Data A system for configuring mobile phones and PDAs for mobile networks and handset manufacturers. We built the core product incrementally over a number of years and co-ordinated the work over three sites across the world. All done using extreme programming. Customers were some of the largest companies in the mobile business. Our apps provided global support for some of these clients.
I really wouldn't go back to the old way of doing things - and neither would the customers that sponsored the projects I've mentioned above.
In most of the big companies (IBM for instance), the methodology is not always the same, Agile or Rational or Waterfall. That depends in a lot of the history of the projects and the experience of the current People and Project Managers.
If you plan to develop on something is always good to check on all the sides before deciding what suits best for your plan.
So the short answer is: It depends.
My product (the Sophos Email Appliance) is developed using agile methods. Industrial Extreme Programming, as espoused by Joshua Kerievsky, was used for the first several years of development. Recently I have started to move the team more towards Kanban, visualizing work flow and using pull-based scheduling instead of time-boxed iterations.
In other words, before I listen further to all the preaching and jump into the manuals, what evidence do I get that this is the way to be successful in a successful project in a successful company?
There is empirical evidence that most IT projects are not successful (where success means on time, on budget and fully functional here). Given this evidence, it seems reasonable to wonder if a deterministic approach (the waterfall) is well suited for software projects.
"The definition of insanity is doing the same thing over and over and expecting different results." --Albert EinsteinRita Mae Brown1
If a deterministic process produces failures over and over, we are likely not applying the right process for software development projects and Agile methods are an alternative. The theory behind these methods is that most software projects are not deterministic, they are creative (like in art) and complex (as defined by Ralph Stacey) projects and we can't predict everything. So, instead of trying to predict everything and then fighting against change, we should use an adaptive process. And this is what Agile methods are about.
Now, using an Agile method will never guarantee systematic success (and someone claiming the inverse is a liar) but they'll give you better control over the risks. And, if your project has to fail, it will at least fail fast.
Update: 1 Actually, this quotation seems to be misattributed to Albert Einstein. The earliest known occurrence, and probable origin, cites to Rita Mae Brown.
I believe Doublefine just produced Brutal Legend using Scrum.
From what I understand StackOverflow is a successful website built with agile practices and TDD.

Dual bandwidth agile team? [closed]

Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 5 years ago.
Improve this question
I'm trying to figure out how to solve some challenges that my team is facing while attempting to apply agile. The one that is causing the biggest headache at the moment is due to the dual role nature of projects that come into the business.
Basically, we have a number of software that we produce and deploy for various markets. This software is planned and scoped in quarterly release cycles. At the same time we have large contracts come through that take anywhere from 1-3 months to complete. The problem comes from the fact that management wants to work on the incoming contracts first and foremost and all normally scheduled release work is brushed aside to get the next contract out the door.
We're trying to scope the releases to shorter than 3 months so that a contract would have to wait that long for work to begin.
Has anyone dealt with a scenario like this while trying to apply agile? What are some ideas/approaches to working on release scoped/planned work and keeping management happy that high priority contracts are being delivered in a timely manner?
The only way I can see is an internal market.
Assign a $ value to the next release of your 'real' product and then you can fairly apportion effort to that vs the incoming contract.
Of course the value of the 'real' product depends on management but at least it pushes the problem onto them in a rational way.
Instead of looking at your situation as multiple shorter projects that are interleaved into one longer project, you might instead think of it as a single larger project. The small projects then become interrupts or the equivalent of scope changes, which are things that all large projects need learn to manage anyway.
As with interrupts and scope changes, you will need to address schedule impacts, the effect of "context switching" overhead on your staff, etc -- and possibly consider dropping features or cutting back in other ways in order to make your next scheduled delivery date.
If management wants the new work to be done first, while the mainline project is put on hold, then it seems to me that's what you should give them. Why drag your feet for 30 or 45 days before starting the new project? From the perspective of a single larger project, that's certainly not very agile. You could instead get a faster start, and then communicate the resulting impact.
Over the long term, you may find certain staff members are slowed down more by periodic course changes than others. In those cases, you might consider making semi-permanent assignments, so they can continue what they were working on, even in the event of interrupts. Similar arrangements are typical in larger, interrupt-driven shops.
Even in an agile workplace there is some kind of "resource planning" at management level. As long as there is some predictability on when the contracts come in, the allocation of people to teams and between teams can be decided before the start of each iteration.
If an unexpected event occurs and it is necessary to terminate a sprint, or re-plan it mid-iteration then that's what you have to do.
Agile methodologies are supposed to help you to "embrace change" and make sure that the highest value requirements are delivered first. They don't change the fact that there is always more work to do than people to do it, but they do provide a framework for managing the chaos that this will cause if people aren't realistic about priorities, actual staffing levels and work rates (or "velocity").
Agile doesn't mean that there won't be difficult conversations, but if it's done well then the conversations should mostly happen in time to take some kind of corrective action.
I'm assuming that there is some kind of officially sanctioned agile process in place. I don't believe that agile methodologies (e.g. Scrum) can be made to work under the radar, because:
Agile methodologies are about self-managing teams. If your management doesn't accept the teams' right to self-manage then there is going to be a power struggle.
Agile methodologies are about having high quality communication both within a team and between the team and it's stakeholders. It doesn't work if the process is hidden from the stakeholders.
From the comments above, your process seems to be in pretty good shape. You have identified a genuine business problem and you are having a constructive dialog with your management team.
If you haven't got management buy-in, doing Agile is very difficult.
By the sounds of it, the management don't have a problem at the moment. They drop a contract on you, you do it, the quarterly release slips but they get the nice contract money.
Is your team large enough that you could conceivably split it into two teams: one focused on the internal releases, one focused on contract work or perhaps two teams that swap over responsibilities after each release so they each get to spend some time on green field and some time on BAU projects.
On a general Agile methodology note, you'd be better off with Kanban than Scrum because it sounds like if you tried to plan iterations, you'd end up with 90% of the work in the unexpected 'contract came in' column.
Who is driving the quarterly releases on your product: customer requests or what you would like to do? Like mgb said, what profit is the business making from them?
I think it's first important to define by what you mean to "apply agile." There are a lot of different parts of agile and I would try and start small with the pieces that you can do. For example, do you have a continuous build running? Have you developed a product backlog?
Working on multiple projects is difficult to begin with but without management buy-in (as Wysawyg mentioned), it will be difficult to become more agile. You need to show the benefits of agile development in terms of cost savings to management. Have you determined why you want to become agile? How will it help? Once you have shown why, then just start doing some of the pieces that you can and after you start seeing some improvements, talk to management about the bigger pieces.

What can a single developer learn from Scrum? [closed]

Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 5 years ago.
Improve this question
Let's say that a developer is interested in learning Scrum, but nobody else on the team is interested. I realize that Scrum is made for teams, and the process would have to be modified to fit a single person.
Is there any benefit to be gained by the developer trying Scrum, even if the team doesn't? If so, how would the process be modified to suit the situation?
I think there's benefit to be gained by any method that helps you develop goals, tasks, keep on top of work and deliver something often.
Your individual work-products would gain the same advantages that teams gain with scrum:
You'd get something done every {Sprint Iteration Period Here}, something you can hand off and say "This is now ready".
Your estimation technique will start to improve with reflection and retrospectives
You'll start to plan your day and make commitments to yourself about getting things done, so again your estimation of your capacity will increase
Retrospectives will formalize improvement of your personal work process. You'll start actively improving, removing and adapting to suit you and your individual needs.
You wouldn't be able to rely on other team members to help out, which is a bit annoying, and you wouldn't have a product owner, Scrum master or a backlog to pick tasks from. You may not even be in a position to make decisions on what to work on next. But I think the formal discipline and reflection is helpful for all craft practitioners, at all levels, alone or in groups.
And who knows, you might even inspire your team to Scrum it up once they see what great results you're getting.
I would suggest that you use Extreme Programming instead, as that works better for one programming than a decidely team-based process.
Then you can get the benefits of being more agile, but if your team is not agile then you will have some issues due to the use of a different paradigm.
For me, the biggest key was getting buy-in from my supervisor. It can be tough to try and have some sort of Sprint only to have it interupted multiple times (Supposedly XP teams handle this better, but I don't think any developer does.). Also, don't forget to include either power users (they could be testers) or members of other departments that could be used as Product Owners. I like to sit with other users and do a type of paired programming (OK they don't code) where I can ask questions while coding and do quick demos to get feedback. This helps when I'm struggling to create specs because those requesting the app are having a hard time telling me what they want.
Even if it's just you in the daily stand-up, it can be scrum.
If you compare yesterday's planned with actual and define today's plans -- without talking to other people -- that's still a kind of daily stand-up.
I'd say that what you're doing probably is scrum if you're following the daily-sprint-release cycles; even if there aren't a any other people to talk to each morning.
G'day,
For the best thing to come out of learning Scrum is the concept of involving the customer early and often. That way there are no nasty "that's actually not what we wanted" moments when you deliver to the customer after six months hard work.
HTH
cheers,