I feel a bit noob asking this but been scratching my head trying to figure out a solution for this problem. (ADHD hitting hard as well)
I have a list of people that are schedule to work in various time segments, some of them with shifts that crosses midnight, and after comparing it with a different data set know if the person if the person is working or not.
Column A contains the list of people,
Column B and C contains the days off, combined with + =Today()
Column D contains the time when the shift begins, (As it time only, added =Today)
Column E contains the time when the shift ends,
Column F will indicate if that specific person is in their day off or they need to work, used the following code for it
=IF(OR(B3=(TEXT(TODAY(),"ddd")),C3=(TEXT(TODAY(),"ddd"))),"Week-Off","Workday")
In column G I want to know if the person is working or they are absent after matching it with another table using this formula
=IF(F2="Workday",IF(AND(Now()>=$E2,(Now()<=$F2),"Scheduled","Off-Shift")," ")
So far the code has worked for everyone who has schedules that ends at 11:59 pm, but when the shift ends at midnight or it crosses midnight it provides incorrect results (Shows Offshift instead of Scheduled)
In Short I want to know if =Now() is between 2 times, when is in the same day or the shift crosses midnight.
Code (Asume Now() is 1:30 am)
=IF(F4="Workday",IF(AND(Now()>=$D4,(Now()<=$E4),"Scheduled","Off-Shift")," ")
Expected Result
Schedule
Actual Result
Off-Shift
As on now i feel is a pretty easy solution but unable to wrap around a solution, and somehow my brain is focus on using IF. As an extra bonus if it can be done by Excel-VBA it will be a plus
After looking a bit further found the solution in the following post: Determine if a given time is between start and end time
Related
here's my problem:
We have an Excel sheet at work in order to manage various tasks all set on individually specified timelines - we're talking hundreds of tasks per month with dates that are currently all being maintained manually.
Let's say we have Task A and that task has a Due Date. That Task is split into several subtasks, all with their individual due dates. Date 1 would then always be Due Date - 10 days, Date 2 would be Due Date - 20 days, Date 3 would be Due Date - 17 days and so on. This then creates a neat timeline of when everything needs to be done.
That in itself would be easy enough, problem is that all of these subtasks have to be done on a specific workday as well. Meaning that subtask 1 would not only have to be done Due Date - 10 days, but it would also have to fall on a Monday - if for whatever reason Due Date - 10 would happen to fall on like a Wednesday, it would have to subtract another 2 days. And then the real problem is that Date 2 and 3 each have to fall on different workdays and Task B has an entirely different schedule again.
Now, the first thing that came to my mind was attempting to just nest a couple IFs - and I've even managed to come up with a working formula for that. Problem here is that it's so stupidly long and (thanks Excel) utterly unreadable - if for some reason someone else had to change something about it or troubleshoot the entire file 1-2 years from now, they'd probably have to spend at least an hour reconstruct how the hell any of it actually worked. Which doesn't sound particularly appealing to us.
Here's a screenshot to help illustrating the situation:
And here's a draft of the current formula that I'm really not happy with, despite it somewhat doing the job:
=IF(AND(WEEKDAY(K2-VLOOKUP(B2,Table1,3,FALSE),11)>5,VLOOKUP(B2,Table1,5,FALSE)=0),(K2-VLOOKUP(B2,Table1,3,FALSE))-(WEEKDAY(K2-VLOOKUP(B2,Table1,3,FALSE),11)-5), IF(VLOOKUP(B2,Table1,5,FALSE)=0,K2-VLOOKUP(B2,Table1,3,FALSE), IF(WEEKDAY((K2-VLOOKUP(B2,Table1,3,FALSE)),11)=0,K2-VLOOKUP(B2,Table1,3,FALSE), (VLOOKUP(B2,Table1,5,FALSE)-WEEKDAY(K2-VLOOKUP(B2,Table1,3,FALSE),11))+K2-VLOOKUP(B2,Table1,3,FALSE))))
My question is now: Does anyone have an idea how to solve this in a less confusing and unclear manner? I was trying to get something done using =CHOOSE() but ultimately ended up with the same problem of eventually having to resort to 7 IFs and dozens of LOOKUPs, making the final formula just as long. I wouldn't be disinclined towards some kind of helper table that asigns the last 7 days and their workdays to every single day of the year... but I don't think tossing another 20,000 calculated cells into a file that already has tens of thousands other calculated cells would really be a serviceable alternative... or make the situation any less obscure at all tbh.
So, anyone any idea how to go about this? Or is there really no realistic alternative than to use a bunch of IFs?
Edit: Forgot to mention that 1 special case:
There's also the situation when a date doesn't have to fall on a specific workday - in which case it's simply due date - X days. The problem here is that in those cases the dates could fall on a weekend, so the formula would have to move these dates to the previous Friday as well.
Assume you have some date and you want to "back up" ten days and then to the preceding Monday, unless the resultant date is a Monday. The general formula would be something like:
=A2-10+1-WEEKDAY(A2-10-DOW)
Where DOW translates into
Sunday=0
Monday=1
Tuesday=2
...
You should be able to modify your formulas to use this algorithm for day of the week.
If the two tables are named thisTable and keyTable, the following 365 formula is one way of implementing:
If your tables are as below, you can enter the formula in B2 and fill down and across. The references should self-adjust and return the proper dates.
Note that in keyTable, I enter the day of the week DOW as defined above, and not the textual date.
=LET(dys,VLOOKUP(thisTable[#[Task]:[Task]],KeyTable,COLUMNS($A:A)*2,FALSE),
dow,VLOOKUP(thisTable[#[Task]:{Task]],KeyTable,COLUMNS($A:A)*2+1,FALSE),
due,thisTable[#[DueDate]:[DueDate]],
IF(dow="flexible",WORKDAY(due-dys+1,-1),due-dys+1-WEEKDAY(due-dys-dow)))
If you want to have the result be the closest workday, instead of the preceding workday, then you need to add two clauses to the LET function
Calculate the subsequent workday date
Then use an IF to return the closest one to the original target
eg:
=LET(dys,VLOOKUP(thisTable[#[Task]:[Task]],KeyTable,COLUMNS($A:A)*2,FALSE),
dow,VLOOKUP(thisTable[#[Task]:[Task]],KeyTable,COLUMNS($A:A)*2+1,FALSE),
due,thisTable[#[DueDate]:[DueDate]],
dayPrev,IF(dow="flexible",WORKDAY(due-dys+1,-1),due-dys+1-WEEKDAY(due-dys-dow)),
daySubseq,IF(dow="flexible",WORKDAY(due-dys+1,-1),due-dys+7-WEEKDAY(due-dys-1-dow)),
IF((daySubseq-due+dys)>3,dayPrev,daySubseq))
I have a column that needs split based on "morning" and "evening" although the morning and evening times move every day (it's based on sidereal day). Calling them morning and evening is a little deceiving though because eventually the time will creep into the next day and I want to keep the groups distinct. It is more accurate to call them group 1 and group 2. It just so happens that they are around 12 hours apart so it looks like you can just separate based on time of day but once the later group creeps into the AM hours, it would start to get counted as "morning" and the earlier group would roll into the afternoon and be counted as "afternoon" See screenshot below for example data.
I need them split so I can perform operations on the value column so I can distinguish the values in the first group from the values in the second group. I thought of doing some sort of flip flop algorithm based on the previous cell but there may be a more elegant way to do it. Also, it's not shown on the example data but sometimes the day may skip but the times more or less continue in the same pattern of increasing by 3-5 minutes each day.
A date with a time stamp is stored as a number in Excel. Days are stored as whole numbers, time is stored in decimals. So, disregarding the date part, look at the decimal of the number and determine if that is before or after the time you want.
0.5 for example is midday, or 12 noon. So if the decimal part of A1 is less than 0.5, the time stamp would be in the morning.
=if(A1-int(A1)<0.5,"before noon","after noon")
It is not clear from your question how sidereal relates to the data in your sample.
I have a problem where I am trying to calculate in Excel if any part of a provided work duty time period is contained within a user defined period which specifies the night working hours e.g. 2330-0559 or 0000-0630.
If I provide a work duty time I want and any part of the duty is within the specified period it needs to be identified. E.g. 2230-0630 duty time is within both examples above.
I can tried a few different solutions and still not got the right way solve it.
Maybe someone can help. I also know that 24:00 in excel is used for midnight at the end of the day and 00:00 is used for midnight starting the day as excel works from 0-1 as part of the day.
=OR(MOD(A5,1)>$E$2,MOD(A5,1)<$F$2)
I would work with the number of minutes as decimal and with it make a valid range from "Duty start time" and "Duty end time".
Check if you can make any sense out of this:
Here the example:
https://drive.google.com/file/d/1O1B76srlY8sYQHsV_TiZVzi-7B_18eSj/view?usp=sharing
Update: Sorry for the lack of explanation. Here I try my best to clarify how I did it.
Conversion
First of all I try to convert any time into minutes, so 00:00 is 0 minutes, 01:00 is 60 minutes, 24:00 (excel shows 00:00) is 1440 minutes, 25:00 (excel shows 01:00) is 1500 minutes.
That conversion I do with CONVERT(E2,"day", "mn"), which does convert from day to minutes.
Range Normalization and inclusion
Now every range has to be normalized, that means the "End" has to be always bigger than "Start". For 00:00 to 06:00 this works fine, but for 22:00 to 06:00 it needs to be tweaked. So if "Start" is bigger than "End" then I add 1440 mins (24 hours) to "End". That I do with IF(A6>B6, 1440,0).
You then need to see if any "Duty range" contains the "Night range". That normally is done with the formula if (DutyEnd > NightStart AND DuttyStart < NightEnd) then TRUE.
Challenge 1
That was the main concept. But then if you try to compare a range like 00:00-06:00 contained in 24:00-06-00 it does not work. And that is because the converted minutes are 0-360 and 1440-1830, they don't contain each other.
In E3 to fix this I cut down 1440 with modulo (MOD()), then MOD(1440, 1440) = 0. So even if you use values like 25:00 or 52:00, they will be cut down to the smallest amount of minutes. E.g. 25:00 (1500 mins) = 1:00 = 60 mins, 52:00 (3120 mins) = 4:00 = 240 mins
Challenge 2
We have yet another challenge, the possible comparisons are as follows:
00:00-06:00 contained in 00:00-06:00 which in minutes is 0-390 contained in 0-390
00:00-06:00 contained in 22:00-06:00 which in minutes is 0-390 contained in 1320-1830
22:00-06:00 contained in 00:00-06:00 which in minutes is 1320-1830 contained in 0-390
These last two will not match. So that is why in the "Contains" column (E.g.: E6) I compare against the "Night criteria" - 1400 and + 1400.
Hope it is a bit clear. Let me know otherwise..
UNDERSTANDING DATE AND TIME IN EXCEL
Dates in excel are stored as INTEGERS. They represent the days since 1900/01/1 with that date being 1.
Time is stored as a decimal which represents a fraction of a day. 24 hours is 1, 0.5 is 12 noon. etc.
In other words, everything to the left of the decimal is date and everything to the right is time.
JUST USING TIME AND CROSSING MIDNIGHT
This is problematic from the view point that early morning times are less than the late times of the previous day. The fact of the matter is that they are larger. In our heads we do the mental math of knowing the are the following day but we ignore the date aspect.
A quick way to rectify this is to add the date to your time. Life will become much easier with the math. You may however not want to add full dates to start and end times. WITH THE ASSUMPTION that start and end times are not more than 24 hours the simple work around is is to add 1 to the end time when the end time is less than the start time. This means its the next day.
It the example date you provided, column C was insert to CORRECT the end time. It did the check of end less than start if so add one using the following formula:
=B6+(B6<=A6)
The part in brackets is a logic check. It either evaluates to TRUE or FALSE. When excel runs a boolean (TRUE or FALSE) through a math operator (not a function like sum) it will convert TRUE to 1 and FALSE to 0.
LENGTH
Straight forward math of C minus A since C is always after you start and is the larger of the two numbers.
=C6-A6
CROSSING MIDNIGHT
Need to be a little careful in your definition of crossing midnight when a start time or end time is exactly midnight. Technically speaking you did not cross it if you start or stop on it. The difference is really < versus <= or > versus >=. I will leave that to you to sort out. For the math I used:
=AND(A6<1,C6>=1)
Though I did not use this column for anything else
START CHECK
=OR(A6>$F$2,A6<$G$2)
END CHECK
=OR(B6>$F$2,B6<$G$2)
ANY TIME CHECK
I broke this into three columns. It can be combined into one but wanted to show the working parts. The first check is to see if the start time is before the night start and that the shift end time was after the night start time. The second check was similar for the the fisrt except you want to know if the start time is before the night end time and the shift end time is after the night end time. For the OR case you want to check to see if ANY of columns F through I are true:
COLUMN H
=AND(A6<=$F$2,C6>$F$2)
COLUMN I
=AND(A6<$G$2+1,C6>$G$2+1)
Note the +1 for night end time. This is to reflect that the end time is actually on the following day.
COLUMN J
=OR(F6,G6,H6,I6)
or
=(F6+G6+H6+I6)>=1
Place the above formulas in row 6 and copy down as needed
Well, I think I'm missing something but let's see if this works for you. To make this work:
All hours must be typed in hh:mm format
Night Criteria End must be on a different day. This means it must be over 00:00 or formulas won't work. If you type something
like start criteria=22:00 and night criteria= 23:50, both times
would be in the same day, so formulas won't work
This formulas only work in periods less than 24 hours. If anytime the different between criterias is over 24 hours, formulas won't work
properly.
Now, I replied your data like this:
The trick here is dealing with times without dates. Dates in Excel are înteger numbers and decimal parts are the hours/minutes/seconds. So to compare properly hours like this, you need to add an integer part.
Let me explain. In Excel, 18:00 would be 0,75. And 06:00 would be 0,25. If you try to get the difference between both times, you will get -0,5. In decimal it makes sense, but when trying to convert to time, it makes no sense for Excel. So, as I said before, the trick here is adding integers (in this case, because 06:00 is lower than 18:00, we would add +1), so Excel would make 1,25 - 0,75 = 0,5. And Excel can convert 0,5 to hours, and it will return exactly 12 hours, the right result.
So knowing this, the trick in formulas for your data is comparing ends with starts and add 1 or 2 to compare then properly with your criteria. That way Excel can figure out if a time is later or sooner than a criteria.
All my formulas are these ones:
LENGHT: =IF(B5<A5;B5+1-A5;B5-A5)
CROSS MIDNIGHT: =IF(Y(B5<A5;B5<>0);TRUE;FALSE)
START BETWEEN CRITERIA: =IF(AND(IF(A5<$E$2;A5+2;1+A5)>=1+$E$2;IF(A5<$E$2;A5+2;1+A5)<=$F$2+2);TRUE;FALSE)
END BETWEEN CRITERIA: =IF(AND(IF(B5<$E$2;B5+2;1+B5)>=1+$E$2;SI(B5<$E$2;B5+2;1+B5)<=$F$2+2);TRUE;FALSE)
ANY PART:=IF(OR(E5=TRUE;F5=TRUE;AND(A5<$E$2;A5+C5>1+$F$2));TRUE;FALSE)
Anyways, I uploaded a file to my Gdrive, in case it may be helpful to download and check the formulas.
This is the best I got. Probably there is a better way, but I hope this can help you, or at least, you can adapt it to your needs.
https://drive.google.com/open?id=1nrZKfyUhED_y6iiPRSUwRf7GhJlBYt-O
In assessing how many agents can be added to certain times of day without exceeding the number of seats in the call center, I'm trying to discern how many agents are scheduled for each half hour interval on each day of the week.
Using the =SUMPRODUCT(((A$2:A$1000<=D2)+(B$2:B$1000>D2)+(A$2:A$1000>B$2:B$1000)=2)+0) formula I've been able to identify how many total agents work for each interval, however this doesn't take the day of week into account.
I currently have my spreadsheet setup this way:
K is the start time of the shift, L is the end time of the shift, M to S pulls data from another sheet that shows a 1 if the agent works on that day of the week and 0 if they do not, and then U has all the time intervals listed out. In the example, it's cut off but the columns continue down as needed. U goes to 49 and I've just been using a range from 2 to 500 for the others as we currently do not have that many shifts and I'm leaving space for the moment.
After some Googling, I tried =SUMPRODUCT(--(M2:M500="1"),(((K$2:K$1000<=U2)+(L$2:L$1000>U2)+(K$2:K$1000>L$2:L$1000)=2)+0)) but it only returns #VALUE! so I'm not sure what I'm doing wrong.
Any suggestions of how I can make this work? Please let me know if more information would be useful. Thanks.
=sumproduct(($K$2:$K$1000<=U2)*($L$2:$L$1000>=U2))
That will count the number of occurrences where the start time is less than or equal to the time in U2 AND the end time is greater than or equal to U2. It will check time from row 2 to row 1000. Any time one condition is checked and its true the comparison will result in value of TRUE and FALSE when its not true. The * act like an AND condition while at the same time converts TRUE and FALSE values to 1 and 0. So both conditions have to be true for a value of 1 to result. Sumproduct then totals up all the 1 and 0 to get you a count.
In order to consider the days of the week, you will need one thing to be true. Your headers in M1:S1 will need to be unique (which I believe they are). You will need to either repeat them in adjacent columns to M or in say V1 you have a cell that can change to the header of the day of the week you are interested in. I would assume the former so you can see each day at the same time.
In order to do this you want to add more conditions and pay attention to you reference locks $.
In V2 you could use the following formula and copy down and to the right as needed:
=sumproduct(($K$2:$K$1000<=$U2)*($L$2:$L$1000>=$U2)*(M$2:M$1000))
UPDATE #1
ISSUE 1 Time ranges ending the following day (after midnight)
It is based on the assumption that the ending time is later than the start time. When a shift starts at 22:00 and end at 6:30 as an example, our mind says that the 0630 is later than 22:00 because it is the following day. Excel however has no clue that 0630 is the following day and without extra information assumes it to be the same day. In excel date is stored as an integer and time is stored as a decimal. When you only supply the time during entry it uses 0 for the date.
In excel the date is the number of days since 1900/01/00. So one way to deal with your time out is to add a day to it. This way excel will know your out time is after your in time when the hour is actually earlier in the day.
See your sample data below.
Using your sample data, I did a straight copy of the value in L and placed it in M (=L3 and copy down). I then changed the cell display format from time to general. This allows you to see how excel sees the time. Note how all the time is less than 1.
In column N I added 1 to the value when the out time was less than the in time to indicate that it was the following day and we had not actually invented time travel. I also used the trick of a math operation will convert a TRUE/FALSE result to 1 or 0 to shorten the equation. I used =M3+(L3<K3) and copied down. You will notice in the green bands that the values are now greater than 1.
In the next column I just copied the values from N over using =N3 copied down, and then I applied just a time display format for the cell. Because it is only time format, the date is ignored and visually your time in column O looks the same as column L. The big difference is excel now knows that it is the following day.
you can quickly fix your out times by using the following formula in a blank column and then copying the results and pasting them back over the source column using paste special values.
=M2+(L2<K2)
The next part is for your time check. When looking at the 12:00 time you need to look at 1200 of the current day incase a shift started at 12:00 and you need to look at the 1200 period of the following day. In order to do that we need to modify the the original formula as follows:
=sumproduct(($K$2:$K$1000<=$U2)*($L$2:$L$1000>=$U2)*(M$2:M$1000)+($K$2:$K$1000<=$U2+1)*($L$2:$L$1000>=$U2+1)*(M$2:M$1000))
Note that the + in the middle of (M$2:M$1000) + ($K$2:$K$1000<=$U2+1)? This + acts like an OR function.
Issue 2 Time In/Out 15 minute increments, range 30 minute increments
You may be able to achieve this with the ROUNDDOWN Function or MROUND. I would combine this with the TIME function. Basically you want to have any quarter hour start time be treated as 15 minutes sooner.
=ROUNDDOWN(E3/TIME(0,30,0),0)*TIME(0,30,0)
Where E3 is your time to be converted
So your formula may wind up looking something like:
=sumproduct((ROUNDDOWN($K$2:$K$1000/TIME(0,30,0),0)*TIME(0,30,0)<=$U2)*($L$2:$L$1000>=$U2)*(M$2:M$1000)+((ROUNDDOWN($K$2:$K$1000/TIME(0,30,0),0)*TIME(0,30,0)<=$U2+1)*($L$2:$L$1000>=$U2+1)*(M$2:M$1000))
similar option could be used for the leaving time and rounding it up to the next 30 minute interval. In which case just use the ROUNDUP function. Though I am not sure it is required.
I'm creating a daily scheduling report. Not every position in the report has to be staffed every day, but there's rules determining this (daylight savings mostly) and I've been pulling my hair out trying to figure out a good way to do this that will make it anyone-proof for the person that needs to fill out the sheet on any given day.
My issue: Starting the first sunday in november, one position doesn't need to be staffed all the time. This continues until the second sunday in march. I want the box that shows this position to be conditionally formatted based on what today's date is (which is shown in E1 using =Today() )
I got something close to working (though it looks disgusting), and would cite sources, but I just came back to working on this project after a couple months of a different assignment:
=IF(MONTH(E1)>10,AND((DATE(YEAR(E1),11,1+7*1)-WEEKDAY((DATE(YEAR(E1),11,8-1))))<E1,E1<(DATE(YEAR(E1)+1,3,1+14*1)-WEEKDAY((DATE(YEAR(E1)+1,3,8-1))))),AND(DATE(YEAR((DATE(YEAR(E1),11,1+7*1)-WEEKDAY((DATE(YEAR(E1),11,8-1))))-1),MONTH((DATE(YEAR(E1),11,1+7*1)-WEEKDAY((DATE(YEAR(E1),11,8-1))))),DAY((DATE(YEAR(E1),11,1+7*1)-WEEKDAY((DATE(YEAR(E1),11,8-1)))))),E1<(DATE(YEAR(E1),3,1+14*1)-WEEKDAY((DATE(YEAR(E1),3,8-1))))))
It seems to kick in during the SECOND Sunday in November. I'm particularly flummoxed now. It's been an interesting intersection of "I'm pretty good with computers and layout design" and now all of a sudden diving deeper than I'd ever thought i'd go in excel. Keeping that in mind, I'm starting to feel a little out of my depth already and I'm sure VBA could do this easily but I wouldn't know the first thing about what I'm doing which means if anything ever goes wrong because someone accidentally deleted something I won't be able to fix it.
TL;DR: Trying to hit a moving target of a date based off of a dynamic entry in E1. Based off of E1 find the first sunday in november and the second sunday in March of the following year (or i suppose current year once we roll back around to january)
=OR(DATE(YEAR(E1),11,15-WEEKDAY(DATE(YEAR(E1),11,1),2))<=E1,DATE(YEAR(E1),3,15-WEEKDAY(DATE(YEAR(E1),3,1),2))>=E1)
alternatively you can replace E1 in the formula with TODAY(). This equation will evaluate to True or False