how to consider user modification in result and consider them in VRP - traveling-salesman

I am working on one VRP(Vehicle routing problem) to make plan of pickup and drop service, As VRP is NP hard problem user edits plan according to their requirement.Now I am planning to consider their modification while preparing plan. where should I start for same?

The easiest way to incorporate expert knowledge into a VRP optimiser would probably be using constraints. Have a look at JSprit documentation of constraint as a starting point, if you are using JSprit. If the available type of constraints are not enough to model the knowledge your expert has, you may need to dig deeper and play with cost function and search strategy.
Inferring the constraints automatically from the improvements the expert made to a previous route is going to be difficult. There may be many reasons for any change in a route - it's difficult to tell why the expert made a change if they don't tell you explicitly. If possible, ask the expert to define the constraints explicitly. For example, instead of just changing a route so a job from address X and a job from address Y are served by vehicle 1, the expert will tell your system "Address X and address Y always have to be served by the same vehicle".
By the way, since this is a rather general algorithmic question, you might try to post it on the Compute Science Stack Exchange.

Related

DateTime.Now in Domain Layer of DDD

Recently I faced with the following invariants in my domain Model:
An Offer treated as Expired if ExpiryAt (DateTimeOffset) < DateTimeOffset.Now.
A Director of the Company cannot be younger than 18 years old
When Document is downloaded we should set DownloadedAt field with DateTimeOffset.Now
In Application Layer to keep purity and for better testing we usually isolate System.DateTime with IDateTime interface which allow to mock Now in UnitTests.
But all these 3 scenarios belong to Domain Layer and not to Application Layer. We should not Inject external interfaces into DomainModel to keep it pure. But from other side it might be bad to use DateTime.Now or DateTimeOffset.Now directly in DomainLayer since this adds a dependency to system clock and make it harder to test sometimes since DateTime.Now will never return the same result.
So the question is - how do you deal with this dilemma?
Options I see:
Provide now as parameter to Domain Entity methods. This is viable option and simplify testing though makes code more verbose and sometimes even stupid.
Just use DateTime.Now in domain layer. I already mentioned cons of this approach.
Anything else you might suggest from your experience?
From the different options accessing the static DateTime.Now() functionality is obviously the most disadvantageous. It both does not allow for testing and also hides the domain models dependency to some non-deterministic infrastructure inside the implementation details.
The option to inject some interface to a service that can be viewed is a little better because it makes the dependency explicit and also allows for unit testing by stubbing the non-deterministic output to return some deterministic value of your choice.
But still, at runtime your domain model needs to access some infrastructure dependency. This might be a reasonable compromise in some cases, but if possible I would try to avoid that to keep the domain model pure.
If you look at the current date time in your case from a different angle it becomes more obvious that it is actually nothing else like a normal input parameter. You could see it as something like a reference date time instead of the current date time.
Referring to your first example - checking if an offer has expired - from the domain model's point-of-view it needs to check if the offer has expired at some given point in time. This given point in time just happens to be current date time in one of the use cases where the domain logic is exercised.
So bottom line, I recommend to inject the value of the (current) date time rather than an interface to some functionality in such cases. It makes explicit what data is really need in addition to the data the domain encapsulates on its own and requires for performing the business logic.
Also, it makes more explicit what the client code (e.g. the use case or application service) wants to tell or ask the domain model. For instance, check if the offer has expired as of now or if needed, tell me if the offer was already expired at a given point in time or even if it will be expired at an important point in time.
As further reading I recommend this great article from Vladimir Khorikov where he elaborates more on that topic.

No depot VRP - roadside assistance

I am researching a problem that is pretty unique.
Imagine a roadside assistance company that wants to dynamically route its vehicles. Hence for each packet of new incidents wants to create routes that will satisfy them, according to some constraints (time constraints, road accessibility, vehicle - incident matching).
The company has an heterogeneous fleet of vehicle (motorbikes for easy cases, up to tow trucks for the hard cases) and each incident states it's uniqueness (we know if it wants just fuel, or needs towing).
There is no depot, only the vehicles roaming on the streets.
The objective is to dynamically create routes on the way, having in mind the minimization of time and the total traveled distance.
Have you ever met such a problem? Do you have any idea in which VRP variant it belongs?
I have seen two previous questions but unfortunately they don't fit with my problem.
The respected optaplanner - VRP but with no depot and Does optaplanner out of box support VRP with multiple trips and no depot, which are both open VRPs.
Unfortunately I don't have code right now, as I am still modelling the way I will approach this problem.
I am really sorry for creating a suggestion question and not a real one.
Thank you so much in advance.
It's a rich dynamic/realtime vehicle routing problem. You won't find an exact name for your problem, as when VRPs get too complex they don't fit inside any of the standard categories.
It's clearly a dynamic/realtime problem (the terms are used interchangeably) as you would typically only find out about roadside breakdowns at short notice.
Sometimes you're servicing a broken down car, which would be a single stop (so a vehicle routing problem). Sometimes you're towing a car, which would be a pick-up delivery problem. So you have a mix of both together.
You would want to get to the broken down vehicles ASAP and some would need fixing sooner than others (think a car broken down in a dangerous position on a motorway). You would therefore need soft time windows so you can penalise lateness instead of the standard hard time windows supported in most VRP formulations.
Also for you to be able to scale to larger problems, you need an incremental optimiser that can restart from the previous (possibly now infeasible) solution when new jobs are added, vehicle positions are changed etc. This isn't supported out of the box in the open source solvers I know of.
We developed a commercial engine which does the above. We started off using the jsprit library, which supports mixing single stop and pickup delivery problems together. We later had to replace jsprit due to the amount of code we had to override to get it running happily for realtime problems, however jsprit may still prove a useful starting point for you. We discuss some of the early technical obstacles we had to overcome in getting jsprit to handle realtime problems in this white paper.

Giving up Agile, Switching to waterfall - Is this right? [closed]

Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 5 years ago.
Improve this question
I am working in an Agile environment and things have gone to the state where the client feels that they would prefer Waterfall due to the failures (that's what they think) of the current Agile scenario. The reason that made them think like this would be the immense amount of design level changes that happened during the end stages of the sprints which we (developers) could not complete within the time they specified.
As usual, we both were blaming each other. From our perspective, the changes said at the end were too many and design/code alterations were too much. Whereas from the client's perspective, they complain that we (developers) are not understanding the requirements fully and coming up with solutions that were 'not' what they intended in the requirement. (like they have asked us to draw a tiger, and we drew a cat).
So, the client felt (not us) that Agile process is not correct and they want to switch to a Waterfall mode which IMHO would be disastrous. The simple reason being their satisfaction levels in a Agile mode itself were not enough, then how are they going to tolerate the output after spending so much time during the design phase of a Waterfall development?
Please give your suggestions.
First off - ask yourself are you really doing Agile? If you are then you should have already delivered a large portion of usable functionality to the client which satisfied their requirements in the earlier sprints. In theory, the "damage" should be limited to the final sprint where you discovered you needed large design changes. That being the case you should have proven your ability to deliver and now need a dialogue with the client to plan the changes now required.
However given your description I suspect you have fallen into the trap of just developing on a two week cycle without actually delivering into production each time and have a fixed end date in mind for the first proper release. If this is the case then you're really doing iterative waterfall without the requirements analysis/design up front - a bad place to be usually.
Full waterfall is not necessarily the answer (there's enough evidence to show what the problems are with it), but some amount of upfront planning and design is generally far preferable in practice to the "pure" Agile ethos of emergent architecture (which fits with a Lean approach actually). Big projects simply cannot hope to achieve a sensible stable architectural foundation if they just start hacking at code and hope it'll all come good some number of sprints down the line.
In addition to the above another common problem with "pure" Agile is client expectation management. Agile is sold as this wonderful thing that means the client can defer decisions, change their mind and add new requirements as they see fit. HOWEVER that doesn't mean the end date / budget / effort required remains fixed, but people always seem to miss that part.
The agile development methodologies are particularly appropriate when you have unclear requirements and when you may need to make design changes at later stages in your project. Waterfall is a less appropriate approach in this case. The waterfall approach is appropriate for projects which are well understood and when the requirements are unlikely to change during the project's lifetime. It doesn't sound like that is the case here.
How long are your sprints? An alternative approach might be to decrease the sprint length - at least at the start of the project. Deliver new versions to the customer more often and discuss the changes with the customer. If you aren't doing what they want this will become apparent more quickly so less time will be wasted on implementing solutions that don't meet the customer's requirements.
I'm not sure what kind of shop you run, so it's hard for me to come up with good recommendations. I can offer two guiding principles though:
If you have bad communication with the customer, no development methodology will save you.
It's none of the diner's business how a chef organizes the kitchen, as long as the meal is tasty.
It sounds like you have serious project management and architecture/design issues, and it sounds like your communications have also broken down. Fundamentally I don't think changing your dev methodology is going to fix any of that, and is therefore the wrong thing to be doing (though it may restore some client confidence).
I would be especially concerned about moving towards waterfall since you are now choosing to essentially capture the requirements just once (which we know you have a problem with) with no capacity for input. That rigidity is good for inflexible delivery targets, but it's completely inappropriate here where you have changes all the time - that's agile!
Short term I'd step back and double check your requirements at this stage with them. Renegotiate and confirm your current state in relation to those.
Medium term, I'd open up more communications with the client - try and get them involved in a daily scrum for a while (until you restore confidence, then you can be more flexible).
Long term, you have to be worried about how your PM's and senior devs have managed to get you into this position. If the client is being unreasoanable that's one thing (but it's still up to the PM to manage that, so you're not absolved). It's not reasonable to complain about having too many changes, that just means you screwed up in determining requirements (which is a dialogue, not a monologue) or that you have to have more numerous, but probably shorter sprints.
Above all, I can't see moving towards waterfall is possibly correct. It doesn't fix anything directly and I can only see it exacerbating the problems you've already highlighted.
Caveat: I'm not really capable of a balanced view on waterfall since I've never seen it work effectively and imho it's just completely outdated for enterprise projects.
Agile development does not save you from the burden of actually coming up with a design which both you and the customer understand similarily. Agile just makes it possible to come up with the design in smaller increments and not all at once. And, in the case of a difficult customer, coming up with a proper design takes time.
So, I would spend more effort in sitting down with the customer, with a whiteboard, going over what is it that they actually want. I don't think it really matters in this case if the development process is agile or waterfall.
Agile or waterfall are just words. There are only things that work, and things that don't.
Software development seems virtual to many people and they don't understand why it's hard to change a small thing they request.
Your customers should understand that building a software is just like building a house : when you have built all the foundations and walls, it's hard to change all the house final plan, and room design.
Some practices helps avoid this kind of problem : data modeling, data dictionary, data flow diagrams... the goal being to know every requirement in complete detail. Cutting your product in many independant blocks help starting coding while continuing designing or specifying other parts of your final product.
See Steve McConnell book : "Rapid Software Development : taming wild software schedule" for all the practices that work.
The reason that made them think like this would be the immense amount of design level changes that happened during the end stages of the sprints which we (developers) could not complete within the time they specified.
Scrum is in a way a "short waterfall", and you should be isolated from changing requirements for the sprint duration. It seems that this is not happening! Therefore, don't see you will gain anything from switching to traditional waterfall, but you should stick to freezing requirements for the sprint duration.
Maybe your iterations are too long?
(I assume you follow Scrum, since you mention sprints).
Talk to your clients and agree the following:
- Shorter iterations, up to 3 weeks max.
- No changes in requirements during the iteration.
- Features are planned at the beginning of the iteration
- Every iteration ends with deliverable: fully functional software with all features that are fully operational
- Iteration length does not change. Unfinished features are left for the next iteration (or maybe discarded if client changes his mind).
- Number of "feature points" you can deliver in a single iteration should be based on the team metric, not client insistence. This is your "capacity".
- Client decides what features (but not how many of them) are planned for the iteration
Another thing you should ask yourself is why there are so many "design level changes" in your application. By now, you should have basic architecture and design in place. Maybe you should review the actual design and try to impose some design guidelines and implement some patterns. For example, in a typical enterprise web app, you will probably end up using something like DAO. When you add new features, you create new DAO, but basic architecture and design will not change.
It seems however, that you are not delivering what the client wants. In that case, it is of outermost importance to deliver working product to the client, so he could provide sensible feedback for the next iteration.
Regarding
"we (developers) could not complete
within the time they specified."
The client should not be the one to specify the iteration time-frame. Iteration length should be always the same. The requirements that enter into the iteration should be obtain as a result of client prioritization, but the amount of requirements that is planned for the iteration should be based on the estimation that team performs and number of "points" you are able to deliver during iteration.
For me it sounds as if there was no "Big Plan[TM]" in the agile project. Using an agile process does not mean that there is no long term plan, it is more about to deal with the increasing uncertainty in the farer future. For example there should be a release plan with the planned features for all releases in the next 2 months (and a lesser detailed plan with features for the releases after that), so it is clear to the customer when to expect a feature, and when there is a possibility change requirements.
Also to me it seems that there was not (enough) customer involvement in the process. I know that this is a very problematic point, but it helps a lot if the current progress can be discussed with the customer at the end of each iteration. As #Mark Byers already wrote, the more feedback you can get from your customer the better you are.
Also try to not assign blame, as this keeps people to block. Try to use the inspect-and-adopt approach to get a better process instead.
It's not clear what sort of design changes you mean. Graphical design? User experience design? Code design?
In any event, the best solution is more, and earlier, discussions with the client. Jointly develop explicit, concrete examples that satisfy the client's requirements. You can turn these examples into regression tests to ensure that you continue to satisfy them.
Also, continue the discussions as you progress. Show your output as it is available--don't wait until near the end of the sprint. And work on the part most likely to generate problems first. Also look at ways to make it easier to change the things you're finding often change.
The point is to get the client more involved, even to the iteration of a design. Perhaps you'll want to have some discussions focused only on the design.
Your client does not know about how to develop software, or how to manage the software development process. Don't expect the client to provide meaningful instruction on these matters. As a special case, the client does not really know what terms such as 'waterfall' and 'agile' mean; don't expect them to provide meaningful input on your development methodology. Moreover, the client will not really care about these details, as long as the requirements are met within the agreed budget and timeframe. Don't expect them to care, and don't confuse them with lots of inadequate builds and irrelevant information on your internal process.
Here is what the client does care about, and is trying to talk to you about (partly using your own technical jargon): their requirements, their disappointed expectations, and the way you communicate with them. On these matters, the client is the absolute authority. Interpret what they are saying as being about your relationship and the product, not as usable commentary on internal process. Don't cloud the water with your internal deadlines and processes, discuss progress and expectations and the relationship. (If they insist on talking about internals you can remap the terms: e.g. what they understand as being 'the next release' may be internally known as 'the next major release', or whatever).
It sounds to me like the client may want a higher threshold before they get asked for feedback or play with a bad build. It's worth verifying if this is true. If so, you should honor that - and still use agile methods internally if that is what your team feels is best. If they say "waterfall," you may be able to interpret that internally as meaning "we set a deadline for requirements, and then we don't allow more features to be added for a while." Discuss with the client whether it will suit them to have a requirements deadline followed by this sort of freeze.
Someone on your team needs to be the client advocate, and sit on top of the client's issues and fight for them. This advocate must not be sidelined, nor can they take the team's side against the client; they should be the proxy-boss. Then you can separate the internal process communication (team to advocate) from the external communication (advocate to client). The advocate can in some measure insulate the client from the chatter and the builds they don't appreciate, without artificially imposing a certain sort of management or scheduling on your internal process.
To clarify, I do not at all think that you should be secretive or distant with the client, but you should (A) listen to what the client is saying about the relationship and how you are communicating and honor that, (B) keep that separate from internal development process, which should be managed in whatever way will ultimately meet client's expectations.
Fire the client. Even if it is your fault for not understanding what they mean, waterfall would give them 1 chance to give you feedback instead of a chance at the end of each sprint. Some people/clients are literally so stupid that they are not worth working for. Fire them, or tell them that you're using Waterfall without actually switching.
Obvious problem here is communication with customer. If you really want to do agile you have to communicate with customer on daily basics. Only customer should be able to make decision. If you communicate with customer only during mid spring and at the end of the sprint it is natural that later on you will found problems in your application. Also features implemented in sprint has to be accepted and tested by customer. Until that features are not completed.
I'm writing this because I have similar problem on my current project but I know where we failed.
If the communication issue between the Team and the Customer is not fixed, the situation could be worse with waterfall, if the customer only sees the product once it is complete (tunnel effect).
You commented changes from sprints 6-7 started to cause rework of tasks achieved in earlier sprints. Those changes should have been detected earlier - during the Sprint Review.
If there is a misunderstanding in a feature description, and the Team does not implement what the customer is expecting, this should be detected no later than the Sprint where the feature is implemented, and ideally fixed in the current Sprint.
If the customer changed it's mind, the new ideas shall be added to the Product Backlog, prioritized and selected for a Sprint, as any other backlog item. This should not been deemed as rework.
Do you deliver the software to the customer after each sprint, or are you just demoing it ?
The origin of the miscommunication could be at the Sprint Planning: the Team should only commit on Backlog Item that are clearly defined. The definition of the items should comprises the acceptance criteria. Is the customer the Product Owner, and is it the Product Owner ?
Remote debugging of a development process is sufficiently difficult that I would hesitate to offer any opinion about what you should do. It seems to me noone outside your team can plausibly have enough information to make a very useful judgement about that.
A lesser jump to a conclusion would be to make a guess as to what went wrong. From your description, it sounds like early deliverables, which you thought were progress in the bank, ended up being majorly reworked.
One common cause of that is the late discovery/creation of 'all' requirements, things that are supposed to be true about everything in the scope of the project. These can be pretty fatal if taken seriously: something as simple as 'all dialog boxes must be resizable' is, for example, apparently beyond the capability of Microsoft to retrofit to Windows.
A classic account of this kind of failure (albeit in a non-agile project) can be found here
"Once they saw the product of the code we wrote, then they would say, 'Oh, we've got to change this. That isn't what I meant,'" said SAIC's Reynolds. "And that's when we started logging change request after change request after change request."
For example, according to SAIC engineers, after the eight teams had completed about 25 percent of the VCF, the FBI wanted a "page crumb" capability added to all the screens. Also known as "bread crumbs," a name inspired by the Hansel and Gretel fairy tale, this navigation device gives users a list of URLs identifying the path taken through the VCF to arrive at the current screen. This new capability not only added more complexity, the SAIC engineers said, but delayed development because completed threads had to be retrofitted with the new feature.
The key phrase there is 'all the screens'. In the face of changes of that nature, then, unless you have some pre-existing tool support you can just switch on (changing all background colours really should be trivial), you are in trouble. The progress you think you had made up to that point will have retroactively turned out to be illusory.
The only known approach to such issues is to get them right first time. If that fails, live with having them wrong.
A lot of shops add Agile trimmings to make themselves "look Agile" to customers who expect it. Maybe you just need to add some Waterfall trimmings, and show them the product once every 2 sprints.
I believe your client is wrong to move to waterfall. It's curing the symptom, not the disease.
The problem you describe is one of communication - the client wants a tiger, you're giving them a cat.
The waterfall model includes many steps to verify that the requirements as written are being delivered - but it doesn't ensure that the written requirements are what the business meant.
I would look at techniques like impact mapping, behaviour-driven development (BDD) and story mapping to improve communication.

Voting economy: balancing credits properly

Many websites today (including stackoverflow) and games allow people to perform voting, give feedback, enable additional features etc, according to a score: eg. reputation, or MMORPG credits.
As a programmer that will probably need to implement a community based website in the near future, I am interested in knowing about the existence of basic algorithms and decisions to be made so that everything is balanced. For example, the fact that one vote up grants 10 reputations and one down grants -2 was arbitrary or properly weighted ? How to decide the price of a given item and the rewards in a MMORPG, so that everything is balanced? I guess that WoW designers relied on their experience, but I am also sure that this experience can be found somewhere written down. Although this is a social problem, the pricing of a given feature and the reward for a given task are technical/mathematical ones, as you need to give a value to each feature according to some mathematical criteria (although not easy to devise, I guess)
Of course, this question could bring us far in terms of theory of economics, but I am sort of hoping that there are well defined and known simplified patterns and rules for this issue. I just don't know the keywords to query for.
Probably the most important thing to point out here is that this is a social problem not a technical one.
By that I mean that you could use the exact same system as SO on an MMORPG and it would flop or have really undesirable side effects. Whether a system works or not depends on the community you drop it into and the intended purpose. It can also depend on some luck whether people latch onto it or not. You may get early negative behaviour that sets the tone for future negativity and discourages positive involvement. Or it could go completely the other way.
There is no magic formula that made the vote/rep weighting what it is on SO other than long discussions about how to encourage certain behaviour and then some testing and fine-tuning. For example, a downvote costs 1 rep and is -2 rep to the recipient. The guiding principle was that downvotes should cost. After that, it was trial by error.
You might want to read The Value of Downvoting, or, How Hacker News Gets It Wrong and Vote Fraud for some of Jeff's and Joel's thoughts on that subject. Joel's Tech Talk on Stackoverflow at Google is also enlightening.
Voting is actually a very difficult problem. There are so many models of voting, and they all produce different results. For example, choosing your one favorite candidate versus ranking candidates produces a different result. Choosing your LEAST favorite candidate produces a different result. Organizing choices into good/bad produces different results.
Balancing then becomes something that can be done by asking the community. It's very difficult to balance games of that magnitude, simply because even your most exhaustive tests wont cover all of the cases. Having a properly established forum where users can give their opinions as well as having testers who watch out for balancing issues is probably the best way to go.
Oh, and if you want an abstract about the voting problem I mentioned, it's here:
http://www.cs.rochester.edu/~lane/computational-politics.html

How do you measure if an interface change improved or reduced usability?

For an ecommerce website how do you measure if a change to your site actually improved usability? What kind of measurements should you gather and how would you set up a framework for making this testing part of development?
Multivariate testing and reporting is a great way to actually measure these kind of things.
It allows you to test what combination of page elements has the greatest conversion rate, providing continual improvement on your site design and usability.
Google Web Optimiser has support for this.
Similar methods that you used to identify the usability problems to begin with-- usability testing. Typically you identify your use-cases and then have a lab study evaluating how users go about accomplishing certain goals. Lab testing is typically good with 8-10 people.
The more information methodology we have adopted to understand our users is to have anonymous data collection (you may need user permission, make your privacy policys clear, etc.) This is simply evaluating what buttons/navigation menus users click on, how users delete something (i.e. changing quantity - are more users entering 0 and updating quantity or hitting X)? This is a bit more complex to setup; you have to develop an infrastructure to hold this data (which is actually just counters, i.e. "Times clicked x: 138838383, Times entered 0: 390393") and allow data points to be created as needed to plug into the design.
To push the measurement of an improvement of a UI change up the stream from end-user (where the data gathering could take a while) to design or implementation, some simple heuristics can be used:
Is the number of actions it takes to perform a scenario less? (If yes, then it has improved). Measurement: # of steps reduced / added.
Does the change reduce the number of kinds of input devices to use (even if # of steps is the same)? By this, I mean if you take something that relied on both the mouse and keyboard and changed it to rely only on the mouse or only on the keyboard, then you have improved useability. Measurement: Change in # of devices used.
Does the change make different parts of the website consistent? E.g. If one part of the e-Commerce site loses changes made while you are not logged on and another part does not, this is inconsistent. Changing it so that they have the same behavior improves usability (preferably to the more fault tolerant please!). Measurement: Make a graph (flow chart really) mapping the ways a particular action could be done. Improvement is a reduction in the # of edges on the graph.
And so on... find some general UI tips, figure out some metrics like the above, and you can approximate usability improvement.
Once you have these design approximations of user improvement, and then gather longer term data, you can see if there is any predictive ability for the design-level usability improvements to the end-user reaction (like: Over the last 10 projects, we've seen an average of 1% quicker scenarios for each action removed, with a range of 0.25% and standard dev of 0.32%).
The first way can be fully subjective or partly quantified: user complaints and positive feedbacks. The problem with this is that you may have some strong biases when it comes to filter those feedbacks, so you better make as quantitative as possible. Having some ticketing system to file every report from the users and gathering statistics about each version of the interface might be useful. Just get your statistics right.
The second way is to measure the difference in a questionnaire taken about the interface by end-users. Answers to each question should be a set of discrete values and then again you can gather statistics for each version of the interface.
The latter way may be much harder to setup (designing a questionnaire and possibly the controlled environment for it as well as the guidelines to interpret the results is a craft by itself) but the former makes it unpleasantly easy to mess up with the measurements. For example, you have to consider the fact that the number of tickets you get for each version is dependent on the time it is used, and that all time ranges are not equal (e.g. a whole class of critical issues may never be discovered before the third or fourth week of usage, or users might tend not to file tickets the first days of use, even if they find issues, etc.).
Torial stole my answer. Although if there is a measure of how long it takes to do a certain task. If the time is reduced and the task is still completed, then that's a good thing.
Also, if there is a way to record the number of cancels, then that would work too.