Azure DevOps Test Plans - Synchronize JUnit test results in Runs with test cases on Tests Plan - azure

In Azure DevOps, is there any way that I can synchronize the results in Runs with test cases in Test Plans automatically?
My process is:
Release pipeline is set up to trigger Jenkins build to run automated tests.
JUnit test results will be downloaded and published once the build is completed.
Tasks in automation run stage of pipeline.
The process works as expected. I can see the JUnit results in Runs section as the image below. However, the outcome of the test results in Runs (all failed) is not synchronized with test cases in Test Plans (still be active). Can I have the outcome of test cases in Test Plans updated every time the automation build is run and then JUnit XML results are published to Runs?
Results in Test Runs.
Test cases in Test Plans.
So fat is there any settings of Azure DevOps to make it done automatically or I have to update the test outcome in Test Plans manually?

Related

Test Run Result steps and Test Run Result Summary Details but unable to find any API related

i am trying to fetch the attachments of the Test Run Result steps and Test Run Result Summary Details but unable to find any API related to that is i need the attchments for Test Run Result Steps and attachments id, for Test Run Result Summary
A test case describes the steps to take when you run a test. Test suites are groups of test cases, and a test plan is the collection of test suites that need to be run for a particular iteration or release. Test points are the pairings of test cases with test configurations that need to be run for the test plan. A test run consists of a set of test points. The results are the outcome of running the tests in the test run.
Check out the doc
https://learn.microsoft.com/en-us/rest/api/azure/devops/test/?view=azure-devops-rest-6.0
Work with test attachments programmatically using the REST APIs for Azure DevOps Services and Azure DevOps Server
and what you need specifically is at the website
https://learn.microsoft.com/en-us/rest/api/azure/devops/test/attachments/get-test-run-attachment-zip?view=azure-devops-rest-6.0

Azure Devops -Test Data displayed in pipeline is incorrect and is displaying data which i ran in my local esktop

I needed a small help. Whenever I run the pipeline, the data being displayed in testtab is incorrect and it displays the data which I ran on my local desktop rather than the job ran on Agent.
You can run tests in test tabs using different options. You can use any to solve your problem:
Automatically inferred test result: for some popular test runners' pipeline automatically infer the test output.
This is done with the help of describing the error logs generated during build operation.
Publish Test result task: Publishes test result to azure pipeline you choose the runner for tests execution available in
any formats.
Test execution tasks: Built -in test execution tasks such as visual studio test that automatically publish tests results to the pipeline
Azure Devops also provide other way to surface the test information You can use this.
Test analytics provide rich insights into test result over a period of time, identify problematic area in your test.
The dashboard provide track of your work's progress add widgets that surface test related information.
Requirement quality
Test result trend
Deployment status
Reference: https://learn.microsoft.com/en-us/azure/devops/pipelines/test/review-continuous-test-results-after-build?view=azure-devops

How to retrieve VsTest Test Plan test case id during Azure pipeline is running and use that in automation code

Use Case:
Define a Test Plan, Test Suite and add test cases to it on ADO.
Link multiple (all) the tests on Test Plan to a single MsTest method.
Azure pipeline is setup to run the automation suite using the “Visual Studio Test” task and “Select tests using” option is set as “Test Plan”
I am searching for a solution on when Azure pipeline starts and VsTest task is running, can we get the Test case ID/Name (from ADO Test Plan) which is currently processed to run and provide that ID/Name to automation test method (as a parameter option to MsTest test). Using that test case ID, I will run few control statements in the code to perform desired tasks.
But, everything should happen runtime and the approach should be dynamic. Also, it should support parallel test execution.
Could you please share your thoughts.
TIA.
Akshay J.
Azure pipeline is setup to run the automation suite using the “Visual Studio Test” task and “Select tests using” option is set as “Test Plan”
According to your description, so Visual Studio Test task is configured like below.
In that case, you will know the id of test plan and id of test suite, so you could use Rest API: Test Suites - Get Test Cases to get all test cases in a suite including id and url, and then request this url will get fields.System.Title, that is the name of test case.
BTW, you could use API: Definitions - Get to get this release definition, in the response you will find the following VsTest task and its settings including id of test plan and id of test suite.

How to combine Azure Test Pland with Pipelines?

Currently I am trying to using Azure Test Plans to manage all test cases, but I just found how to build / generate manual test cases. I also make some research about Pipeline and I just write some "hello world" test scripts and using Pipeline to automatically test the code. My question is: How could I combine TestPlans with Pipeline to make the test in pipeline recordable? Thank you so much!
this is how the pipeline looks like
this is how the test code be checked
My question is: How could I combine TestPlans with Pipeline to make
the test in pipeline recordable?
I'm a bit confused about what the recordable mean in your question. To combine TestPlan with Pipeline, you should configure the Test Plan Settings. For example, set a build pipeline(build and generates the test binaries) and a release pipeline with test-related task in your Test Plan Settings.
The normal logic is:
A test plan containing your automated tests, which you have associated with automated test methods using Visual Studio 2017, or Visual Studio 2015 or earlier.
A Team Build pipeline that generates builds containing the test binaries.
The app to test. You can deploy the app as part of the build and release workflow and also use it for on-demand testing.
For more details please check Run automated tests from test plans.

How to Run Azure Pipeline Builds Sequentially

I have created an Azure build pipeline using the 'classic editor' (i.e. not yaml). The build consists of two agent jobs:
Job 1 - Build code and deploy to test enviornment using a single agent.
Job 2 - Run tests against the test enviornment in parallel (using max 3 agents at a time).
My problem with this setup is if a build is triggered, and the tests are mid-run, if a second build is triggered, the code that is deployed to the test enviornment will be overwritten by the subsequent build, causing the test run in Job 2 of the first build to fail.
Is it possible to tell the build pipeline to only trigger builds sequentially?
I have figured out how to use Azure DevOps API to check if the latest build has completed, however Im not sure how I can use it in the pipeline. Is it possible to do something like:
1 - Invote REST API to check status of latest build.
2 - Success Criteria met (i.e. the build has completed)? If yes continue build, if not wait a minute and check again.
You have the option to control this in the Build options. Should work based on what you described.
Edit:
After looking again to your question, i noticed that you are running your tests after you deploy your app to test environment, so it means you run your tests during release, so you need to control the flow on your release and not on your buid. In order to do it, you should control on the maximum number of parallel deployments: