Azure WebJob not running as per schedule - azure

I have an issue where an Azure WebJob I created (on a Web App) is not running using the cronjob Trigger I specified. I am able to click on the WebJob, then click Run and it does run fine with no errors. A screenshot of the WebJobs in the portal is shown below.
As you can see, the Trigger is set to run at 9:30 AM every day, but it is never run automatically as per the trigger, only manually using Run. The WebJob itself is set to run a .exe which is contained inside a .zip.
Here are the settings I used when creating the WebJob.

You need to make sure you have Always On enabled in your App, which requires it to run in Basic or higher mode.
See https://azure.microsoft.com/en-us/documentation/articles/web-sites-create-web-jobs/#CreateScheduledCRON for details.

Faced the similar issue.With reference to the below link
https://raskarovblog.wordpress.com/2017/03/16/why-is-my-azure-webjob-cron-expression-is-not-working/
Azure team states that Azure WebJob CRON uses NCronTab with six parameters (five and seven parameters are not accepted).
If you look at NCronTab Docs, you will notice that they use 5 parameters. Azure team explains that they also pass “Seconds” parameter which is not used by default by NCronTab.
Cron format below
{second} {minute} {hour} {day} {month} {day of the week}
To run the webjobs every day at 9.30 am will be
{"schedule":"0 30 9 * * *"}
And also check the time scheduled in the azure webjobs and your local time.

As mentioned in the comments of David Ebbo's answer, the webjob won't be triggered automatically if your CRON expression is not correct.
In this piece of relevant MS documentation, the following CRON expression is mentioned and does not work:
{
"schedule": "0 */15 * * * *"
}
Instead, use this:
{
"schedule": "0 0/15 * * * *"
}
This way I got my webjob running every 15 minutes.

Just putting this here for the googlers.
Remember Azure is running on UTC time so 9:30 in your timezone might be different in Azure time.
I'm PST so if I want to run something at 9:30 I set my CRON expression to 16:30. This becomes a problem with daylight savings time if you need your job to execute at exactly 9:30, you will need to change the CRON expression because UTC does not change with DST.

Related

How to run scheduled scripts using Azure WebJobs

I want to run a scheduled script using WebJob.
Due to source control enabled, I could not create WebJob using portal & had to copy files using Kudu (Diagnostic) Console. These are the files under triggered jobs in the folder:
The run.js file simply calls an API. The settings.job contains the schedule I want it to run at:
{
"schedule": "0 /1 * * * *"
}
But the job does not start on its own or shows up in list of WebJobs:
Is there something else that needs to be done to publish or trigger a WebJob or something more that I need to add to settings.job file?
I have been referring to this
Follow my steps, you can solve the problems you can't add webjob on portal.
Due to source control enabled, I could not create WebJob using portal & had to copy files using Kudu (Diagnostic) Console.
Step 1. Add a webjob arbitrarily on the portal.(upload .zip file or create by kudu)
Step 2. Deploy by VS2019(source control)
Step 3. After success, you will find you can add webjob by upload .zip file.
Now, I will upload nodejs webjob.
Please note that you need to create a continuous or Triggered webjob. The two are different. In the portal, the schedule of the continuous webjob is displayed as n/a, while the Triggered display format is such as: 0 */15 * * * *.
run program in my local pc and it works fine.
Compress it and upload in portal.
check running logs and it works fine, and result is same as local.
Finally ,let us check the content in .zip file.

Azure cron pipeline always runs

I have set up an Azure pipeline to run GUI tests twice a day. According to the documentation, it should only run if there have been code changes, but it always runs.
This is my cron schedule in "azure-pipelines-cypress.xml"
schedules:
- cron: "0 10 * * *"
displayName: Daily 12:00 build (UTC 10:00)
branches:
include:
- master
Note that the documentation (https://learn.microsoft.com/en-us/azure/devops/pipelines/process/scheduled-triggers?view=azure-devops&tabs=yaml#scheduled-triggers) states:
always: boolean # whether to always run the pipeline or only if there have been source code changes since the last run. The default is false.
Is this simply a bug or am I missing something?
Azure cron pipeline always runs
Update2:
I don't want it to run every time the master branch is updated. It
should run when the master branch is updated AND only at a scheduled
time.
But is that not the expected behavior of my current pipeline? The
current behavior acts as if I had set "always: true"
First of all, thanks Mick for your patience in providing a lot of detailed information.
Now, I figure out the issue and I could reproduce this issue on my side. If we set the scheduled triggers, but the build result is failed. In this case, even if we do not any change, the scheduled triggers will still fire. That because the latest build failed, so the last commit record was not recorded by the pipeline. When the scheduled time is reached, the last commit/source code change still exists. It will trigger scheduled triggers.
So, that the reason why your pipeline still executed, even if you do not do any change in the code/yaml.
If I successfully build the pipeline, the scheduled triggers works as expected.
So, it should be said that the documentation is not clear enough, it should be:
always: boolean # whether to always run the pipeline or only if there
have been source code changes since the last successful run. The
default is false.
I submit this to MS, Thank you for helping us build a better Azure DevOps.
Hope this helps.

cron expression to run a webjob at 8 am everyday in azure

I actually require an cron expression to automatically restart an app at 8 am every day. for that I have to create an scheduled webjob in azure but i'm not getting the exact cron expression.
According to your description, if you want to created a scheduled WebJob which will fired at 8:00 AM.
I suggest you could try to use below cron.
At 8:00 AM every day: 0 0 8 * * *
More details about how to set the cron, you could refer to this article.
Result:
Besides, if you want to make sure your web jobs will continue worked. I suggest you should enable the "Always On" setting to be enabled on the app.
About how to enable it, you could refer to below steps:
Notice: This technique is available to Web Apps running in Basic, Standard or Premium mode

Azure Webjobs ignores CRON expression

I have a program that I want to run once per day. I put my program.exe and my settings.job in one zip file and uploaded it. I sat the running mode to continuous. My settings.job looks like:
{
"schedule": "0 0 8 * * *"
}
My plan was that it runs every day at 8 but instead it runs repeated all the time over and over again.
What did I do wrong?
You webjob running mode should be On Demand:
Create a scheduled WebJob using a CRON expression
From the documentation :
You still need Always On setting to be enabled on the app.
Note: when deploying a WebJob from Visual Studio, make sure to mark your settings.job file properties as 'Copy if newer'.
After days of trying unsuccessfully to make the elusive Azure WebJob run on a CRON expression following the top online tutorials:
https://azure.microsoft.com/en-us/documentation/articles/web-sites-create-web-jobs/#CreateScheduledCRON
http://blog.amitapple.com/post/2015/06/scheduling-azure-webjobs/#.V5irdlcdpw8
http://www.samulihaverinen.com/web-development/dotnet/2016/02/24/guide-to-azure-webjobs/
I finally managed to make my jobs run on cron schedules.
For me the settings.json in the root folder never worked. What did work and was actually extremelly straightforward to implement was to use the Azure Webjobs SDK Extensions.
This approach gives you the most flexibility in implementing the scheduling, it is very well documented and there are complete sample projects for it: https://github.com/Azure/azure-webjobs-sdk-extensions/blob/master/src/ExtensionsSample/Samples/TimerSamples.cs
With a function definition as simple as this you can be up and running with cron scheduling:
public static void CronJob([TimerTrigger("0 */5 * * * *")] TimerInfo timer)
{
Console.WriteLine("Cron job fired!");
}
The Webjobs extensions also open up a whole world of other possibilities so they are 100% worth checking out if you are using Azure Webjobs: https://github.com/Azure/azure-webjobs-sdk-extensions

Change webjob from on demand to schedule

We have an azure webjob that was deployed as on demand. Is there a way to change this to run on a schedule without redeploying?
Not a lot of info out there on this.
I tried creating a new schedule collection like this and adding a job to run the existing webjob, but that didn't seem to work either.
I prefer to do this in the GUI portal, but if its not possible, I'll do it in powershell (if it is possible like that).
(Also, if it can only be changed by redeploying, I need to know that and it effectively answers the question)
To easily add a schedule to your triggered (on demand) webjob add a file called settings.job at the root of your webjob with this content:
{"schedule": "the schedule as a cron expression"}
Find out more about this here
Note: it'll only work properly for Standard or Premium sites and requires you to set the site as always on.
In the end the link in the original post I referenced worked. The thing that was missing for me was the understanding that creating a trigger job in scheduler will not affect the run status (on-demand or scheduled) of the web job itself. In my case it stayed "on-demand", but the schedule was in fact running it.
This should point you in the direction on how to do this via PowerShell. It looks possible to add already existing WebJobs to a scheduler.
Create a Scheduled Azure WebJob with PowerShell

Resources