How can I completely remove a perforce stream integration - perforce

My mainline stream still thinks the development streams needs a merge down, even after I obliterated the last changelist, and I will appreciate some help to fix that.
Story in short:
My mainline stream (named Main) has 2 development streams, one of them named Tintin.
Until earlier today, everything from Main had been merged down to the development streams. One of the streams have not copied to mainline for almost 2 years, so there is a lot of modified files, which needs to get to mainline.
Using P4V I selected the development stream and ran the copy - which stopped with warning or error due to some renaming 2 years back (my changelist 81402)
So after some reading I got the understanding that I should limit the scope for the copy up to changelist 81402, which completed nicely, and resulted in changelist 124031 on mainline stream.
But now Perforce insisted that I had to do a merge down, before I would be allowed to do a second run of copying to mainline, and resulting changelist did not look at all like what I expected.
So I ran p4 obliterate on the changelist but with the a small error:
p4 obliterate //Streams/Tintin/...#124031
But that should have been without the path, like this
p4 obliterate //...#124031
and now perforce says the file versions and integrations are gone (as expected) but the changelist 124031 is still existing, although it does not contain any files.
I want perforce to forget everything about changelist 124031, so I can get back to copying the development stream up to mainline again.

Its possible that in the time between your merge and failed attempt to copy more changes were made on the stream you are now trying to copy up, which would cause Perforce to require another merge.
I would recommend locking the offending dev stream down
Right click stream > Edit Stream > Advanced > Check the box next to Submitting files to the stream restricted to the stream owner
Execute a merge from Main to dev.
Execute copy from dev to main.
Let me know if that does/doesn't solve the issue.
Added note: You can also simply delete a changelist you don't need to go the overkill route with obliterate. Obliterate is dangerous simply because it removes any record of anything happening from history/meta data/etc.
Right click the changelist and select revert, once done you can delete the pending changelist.

Related

How to only receive get file changed by revision In perforce P4

In P4, I only want to pull file changed my client workspace from server. But When I use "p4 sync", this command get all files from server. So, How to get files changed from list revision ? with the files were existed on local and not changed, the command P4 sync do not need sync. My command is here:
p4 sync -f //depot/...#Revision
If you want to restore a file you deleted with p4 delete file, use p4 revert file, not p4 sync. p4 sync is for getting the changes that other people made to the files, not for altering the changes that you made.
There are three different reasons that the files in your workspace might differ from the current head revision in the depot:
A new revision has been submitted to the depot since the last time you synced.
You have opened the files (e.g. with p4 edit) and made changes to them that are not yet submitted.
You have modified the read-only synced files in your workspace without opening them.
(You don't say in your question which of these is the case, which is why you've gotten a couple of different answers that are based on different assumptions about your workspace state -- I'm guessing it's #3, personally, but I'll give the answer for each one so you can understand how it's "supposed" to work vs what's actually going on here.)
In case 1, a normal p4 sync command will update only the files with new revisions. If the revision you previously synced is the same as the head revision, p4 sync won't update it. This makes p4 sync very fast -- you can have a million files in your workspace, and if only one of them has changed since you last sync, only that one file is affected.
In case 2, no p4 sync command will update the files, in the interest of preserving your open changes. To submit your changes to the depot, use p4 submit; to discard them, use p4 revert. Again, only the open files are affected by these commands, so a revert operation affecting only a few files isn't slowed down by however many other files are in your workspace.
In case 3, your workspace is in an inconsistent state -- Perforce's standard workflow is that any time you modify a local file you should "open" it so that the server can track your local work (and optimize operations like sync, submit, etc, as well as alert other users who open those files simultaneously to potential conflicts). If you modify a file locally without modifying it, commands like sync will no longer work as well because the state of your client is not known to the server.
You can recover from an inconsistent state by using the p4 reconcile command (which will open all the inconsistent files so that you can either submit or revert them), or the p4 clean command (which irrevocably discards the inconsistent local changes, as if you'd done p4 reconcile immediately followed by p4 revert). These commands are significantly slower than a normal sync operation since they need to scan the entire workspace rather than only the changed files, but they are still significantly faster than a sync -f since only the changed files are actually re-transferred.

Options to preserver state of file and continue working with it

Suppose I've made some changes to a bunch of files and sent the changelist for review. The review may take up to 24 hours. During that time I might need to edit some of the files in the changelist, but when review is over, I'll need to be able to get back to the version of the file in the approved changelist. What options do I currently have to do that in Perforce?
One option that comes to mind is stashing the files and then reverting when needed, but in this way I'll lose the changes done on top of the stashed versions.
I've read about using task streams, is it something that can help me handle that situation?
I assume that the files have been shelved in the changelist for review (as opposed to emailing them off or using some other review mechanism). If so, I'd move the open files to another changelist:
p4 change
p4 reopen -c (new change) (files)
and continue working on them. The shelved versions of the files will stay in the old changelist.
If you need to go back to the old changelist, shelve your new changelist:
p4 shelve -c (new change)
and then revert your open files (they should be safe in the new shelved changelist now) and unshelve the old changelist to keep working from that point:
p4 revert (files)
p4 unshelve -s (old change)
There are lots of variations on this you could do, such as reverting and starting over from scratch rather than building your newer changes on top of the changes that are currently under review. If you do that, you'll need to merge the changes later, but Perforce will track all of that automatically and prompt you when it's time (as long as you're using Perforce commands to sync/revert/unshelve/etc -- if you start making your own backups and restoring them manually all bets are off because Perforce doesn't know what your edits are based on any more and can't guide you through the merge process intelligently).

How to sync locally modified file with server revision in perforce

I'm updating a locally modified file with the server revision so that I have all the latest changes (that other developers made while I was working on the file). I've already tried p4 sync. Does anyone know the correct way to do deal with this?
Thanks
If the file is opened for edit, and you have already run 'p4 sync', then you should have seen a message like:
$ p4 sync
//depot/main/b#2 - is opened and not being changed
... //depot/main/b - must resolve #2 before submitting
What this means is that Perforce is ready for you to merge your changes together with the changes from the new revision.
Perforce calls this process "resolving" the changes, and has told you that you must resolve them before submitting the file.
When you are ready to merge your changes with the new changes from the new revision, run:
$ p4 resolve
Many people find this process of merging the changes a bit complicated, and prefer to use a GUI tool. Try downloading the P4V tool from the Perforce website and it will help you merge the changes using a visual merge tool.
If you instead decide that you do not want to keep your local changes, and would prefer to discard them, and use the latest version of the file instead, you can discard your changes by running:
$ p4 revert
But be careful! This will lose all the unsubmitted changes that you have made to your file! The same is true of the 'sync -f' command and the 'p4 clean' command; these commands tell Perforce that you don't want your locally-made unsubmitted changes, and Perforce should replace the file with a clean copy from the server.
I will add more detail on Bryan's answer especially about all sequence of syncing, and fixing merge conflicts; assume that this is based on CLI p4.
Let's say you have locally modified files that upstream also has some updates for the same files since you've modified it locally.
Sanity steps I would do is the following
p4 sync -n :: with -n this is dry-run which it won't actually have any effect or perform anything yet, but will return output if it really performs. For the specific situation we're in right now, you probably want to look for the line that has ... in front + the line above it which says is opened and not being changed. With our situation, this means upstream files has updates for the file you've opened and probably made some changes to it. It needs to be resolved.
At this point, you can execute p4 sync to actually perform it.
p4 resolve -n :: again with -n which means dry-run. This is to check whether there's any outstanding conflicts you need to resolve as the result of your sync.
(if the output from 3. is not No file(s) to resolve.) p4 resolve -am :: this will perform conflict resolution automatically. It will try merging but will not do anything if there's any merge conflicts for target file. Its output will list out the result of each file. For files that it leaves out, there will be non-zero conflicts in the output.
p4 resolve -af :: perform merging manually. Its output will list out files (of course with their path).
From 5, edit each files as seen in the output. Search for ORIGINAL or THEIRS or YOURS then delete unwanted section, or merge things together as needed. When finish for each file, just save and quit. Do this for all files.
PS. More info for 6. Actually you can specify which merging resolution policy you want it to happen in which it can be
p4 resolve -at :: accept changes from upstream (accept THEIRS)
p4 resolve -ay :: ignore changes from upstream, only accept what you have locally (accept YOURS)
Also keep in mind, THEIRS doesn't need to always be upstream changes from depot, but if can mean a changelist that you just unshelved into your workspace locally.

In Perforce, how do I re-add a file that was deleted during a back-out?

Here's our situation:
We copied the contents of stream A, which was change to our security infrastructure up into main.
Then we merged the contents down into stream B.
Then we made some other non-related changes in stream B.
Then we realized the changes from stream A weren't working as well as we thought and we decided to back it out to be safe.
We backed out the revision that included the updates from stream A.
This had the effect of deleting some of the files and changing others.
We tested without the stream A changes, and everything worked.
Meanwhile, the developers made a couple of small changes in stream A and we are ready to merge stream A back into stream B.
The problem is, we can copy up to main, but we can't get those changes back down into stream B, as the "remove stream A" changes are newer. We want all the changes we previously backed out back in, as well as the new changes.
Is there any way to do this without resorting to a tremendous manual effort to either manually copy or manually merge everything?
Thanks.
Start by running p4 changes -i #n,n where n is the changelist number of the merge from main to B that contained the A changes you backed out. That gives you a list of changes, the first of which is n itself, and the rest are the changes in main that you will need to re-merge to B. However, you can't use 'p4 merge' to re-merge, but instead will have to use 'p4 integ -f'.
For example, say n is 1000:
p4 changes -i #1000,1000
Change 1000 ...
Change 994 ...
Change 991 ...
Change 866 ...
This tells you that you have to re-merge 866, 991, and 994 from main to B. If you weren't cherrypicking, you can assume that these are contiguous changes in main and that you can use 866 thru 994 as a revision range:
p4 integ -f -r -S //stream/B #866,994
p4 resolve
p4 submit
(This integ command example assumes that //stream/main is the parent of //stream/B. And you have to be in a //stream/B workspace to do this, of course. And for best results, you probably want to make sure your workspace is completely synced and that you have no open files before running the integ.)
I'm not familiar with Perforce streams, but traditionally Perforce does not have any special notion of backouts. Backing out a change simply creates an inverse changeset.
Therefore, to reapply a backed-out change, you should be able to just back out the backout.
You can always backout your backed out changelist. This way you'll get to the point where the first changes were made.
Bear in mind that all files history is saved so all changes are supposed to be easily recovered in situations like yours.
Your most recent change is the delete, so it wouldn't re-add the file as its already opened for delete. Run a p4 revert on that file, and then do a p4 add, it worked for me.

How to revert to an earlier revision of a project in Perforce following a deletion?

Let's say I have a project under //depot/MyProject. At changelist 1001, this project took a major change in direction, changing everything about it. At changelist 2001, it got p4 deleted. The depot is now at change 3000.
I'd like to restore //depot/MyProject back to its state at changelist 1000. Specifically, I'd like the revision history to record the fact that change 3001 is an integration of change 1000 - i.e. the last version of this project before the major change.
Can Perforce do this at all? Or do I have to rename it into something like //depot/MyProjectOriginal, because //depot/MyProject is now tainted with all those deleted revisions?
(the naive attempt to p4 integrate //depot/MyProject/...#1000 //depot/MyProject/... fails with an "all revision(s) already integrated" message)
You cannot force the integration.
You have two options: you can create a branch using changelist 1000 as the base; or sync to changelist 1000, check out all files, and then submit (a.k.a rolling back).
Option 1
If you do want the history of your changes between 1001-3000 (i.e. a fresh start from changelist 1000) then this is the better option. Using P4V, create a new branchspec and then perform an integrate from your current project to the new branch at changelist 1000. This will be submitted as changelist 3001, when you compare differences between revisions, you will not see of the changes between 1001-3000.
In the P4 visualizer this will appear as a new branch creation at 1000.
Option 2
Sync to changelist 1000, check out all files, and then submit. There should not be any conflicts to resolve. This will be submitted as changelist 3001, however when you review history you will see the everything.
I hope this makes sense, any questions, please ask.
I don't believe that you can integrate files on top of one another like that. I think that you have two options.
If you are willing to move the files, you can do a
p4 integ //depot/MyProject/...#1000 //depot/MyOriginal/Project/...
and that will integrate MyProject at changelist 1000 to the new location.
If you'd like to keep the project at the same place, you can do that as well. It's really easiest in p4v - you can right click on the folder in workspace or depot view and choose "rollback...". In the subsequent dialog, you can then pick a changelist (or date, revision, etc) to roll the folder back to. In your case, I think that you would choose changelist 1000. Stick the files into a new pending changelist (I think that this is always good practice). You can then run a preveiw (to see what would happen), save the contents to a new changelist (so that you can inspect file contents before submitting), or just go for broke and pull the trigger and submit (I generally wouldn't recommend this).
HTH
Just do:
p4 copy //depot/MyProject/...#1000 //depot/MyProject/...
This also make a nice revision graph.
Though there is an accepted answer and plenty of other solutions, none of them works for me coz I need to rollback a large directory (with GBs of data)
Here is the way I used, which works fine for huge directory:
(Suggested to do in a new and clean workspace, though not strictly required)
Assuming the directory to rollback is //depot/foo/bar and you want to rollback to changelist 1234
Make sure no one is locking any files, and make sure the directory you are trying to rollback exists in your client spec
p4 copy -v //depot/foo/bar/...#1234 //depot/foo/bar/...
p4 submit
p4 copy -v is the meat of the solution. It tells Perforce server to perform virtual copy, which means Perforce copies the files but not actually in your workspace. This avoid huge data transfer for file content (when copying and when submitting). In my case, by using "rollback" in P4V (which is doing non-virtual copy), it took over an hour just for copy, and over an hour for submit for my folder. With virtual copy, whole process took me around 1 minute.
The most important thing is, it keep a sensible history. You can see your files being updated and rolled back, and all previous history exists.
use
p4 integrate -f //depot/MyProject/...#1000 //depot/MyProject/...
The -f flag means force an integration even if they have already been integrated.
From http://www.perforce.com/perforce/doc.current/manuals/cmdref/integrate.html

Resources