I am having Excel with Date time stamp at random row in B Column,
Ex: Where in between cell are Empty ( B2, B3..etc).
B1 : 15:13:48:335 2014/08/06
B27: 15:13:55:955 2014/08/06
B31: 15:14:16:005 2014/08/06 ...
I need to find the time difference between 2 consecutive entries Ex: B21-B1 and B31-B27 and so on.

If the values you've shown are actual datetimes, then they are numbers that seem to grow progressively larger as the rows increase.
To get the difference from B1 to B27,
=LARGE(B:B, 2)-LARGE(B:B, 3)
Format the result as time in any way you prefer.
For the difference from B27 to B31,
=LARGE(B:B, 1)-LARGE(B:B, 2)
When datetimes are actual datetimes and not text, the LARGE function can be used just like any other number.
If your values in column B are text, start by reverting them to proper datetimes. Use something like the following,
=DATEVALUE(RIGHT(B1, 5)&"/"&MID(B1, 14, 4))+TIMEVALUE(LEFT(B1, 8)&"."&MID(B1, 10,3))
Correct your data first; then worry about manipulating the numbers.

If the cells propreties are correct, Excel should be able do compute a difference between them without any problem.
Both of the cells containing the dates must be set with Date/Hour format, the cell containing the result of the difference can be (for instance) set to Standard. Then the difference will be a number (integer or float). For instance :
If the result is 3, it means 3 days, multiply it by 24 to have the
number of hours.
If the result is 3,6667, the integer part gives you
the number of full days, the float part gives you the number of
hours. 0.6667*24 = 16 hours.
Hope it helped

Related

[Excel][Math] Formula to generate numbers between two limits

I am trying to fill a column in Excel with values that are generated randomly but the sum of all the values total to the end.
Example:
Starting value = 320
Final value = 350
Need to generate 2 more values which have random difference between them but total to 350 at the end, as in: 2nd val = 12, 3rd val = 18.
The script/formula should generate different values when run next (for another table etc.). It may generate, for the same starting and final values, 15 and 15 or 8 and 22 for the 2nd and 3rd values respectively etc.
Basically what the formula should do is: Find the difference between the starting and final values then randomly add a number to create the 2nd entry. Now the third entry should follow the same pattern but the value generated should end up totaling to the final.
The example is only for 2 values but I'm working on tables ranging from 15-30+ values.
I don't know if Excel can do it, or if there's a mathematical formula that will work here.
Thanks in advance for all the help!
You need something like this:
That gives:
The trick is to generate a list of uniform random numbers between 0 and 1 and then scale those numbers up the total that you're looking for.

Can't figure out why excel is rounding currency

Here is my excel table:
The cell with 8.83 = =((C8-B8)*24)-D8
*C8 = 4:50PM
*B8 = 7:30AM
*D8 = 0.50
The cell $371.00 = =(E8*B3)
Why does my total show $371.00 when B3 = $42? It should be $370.86. I don't have it set to round but for some reason it keeps on doing it.
Because, the actual result of formula =((C8-B8)*24)-D8 is 8.833333333. Due to cell formatting you are seeing 8.83. If you want result for only two digit after decimal point then use round function like-
=ROUND(((C8-B8)*24)-D8,2)
Then you will get result 370.86. Or you can directly use in resulting cell.
=ROUND(E8,2)*B3
$371 is “technically” the correct amount, mathematically. You are actually doing rounding when you are hand-calculating your cross-check, and that isn’t matching Excel’s unfounded calculation.
( 4:50pm - 7:30am ) is 9.3333333 repeating, or “9-1/3”. Divided by 24 leaves you 8.8333333 repeating, not 8.83. Excel is doing what it’s supposed to do, and 371.00 is the correct amount. If your use case calls for times to be rounded to .01 hours and no further then you’ll need to apply rounding somewhere in cell E8.

Excel: Calculate average time (duration), with criteria, between 2 columns

Breaking my head over this, time to look for help :(
I have a sheet with raw data, as illustrated below.
I'd like to calculate the average duration per TestName (column A) between the 2 timestamps (B and C) in another sheet.
How can I do this in 1 formula?
Note 1: The correct answer is (done manually)
test1 = 26:41:23
test2 = 08:23:10
Note 2: 1 formula please, without adding extra columns to calculate the duration per each first
Note 3: I cannot change the format of the raw data
Note 4: ignore empty fields
Thank you!
Use a new Column D to calculate the difference between start and end date on each row:
=DATEVALUE(C2)+TIMEVALUE(C2) - (DATEVALUE(B2)+TIMEVALUE(B2))
Next calculate the average on test1 and test2
=AVERAGEIFS($D:$D, $A:$A, "test1")
=AVERAGEIFS($D:$D, $A:$A, "test2")
Note that I'm using a comma as separator, in some languages, other separators, like semicolon are needed to write the formulas properly.
Now format the view to display at least the days in addition to the time: "DD - hh:mm:ss". Going beyond 31 days is a bit difficult as the month will count up.
If you don't like the formatting, go with the raw number format and extract the information through a bit of math. If it shows for example 1,5 it means one and a half days. I hope you can handle converting decimals to hours, minutes and seconds. MOD(ulo) and Rounddown are going to be your friends. :-)

Converting large time format to decimal in excel

I'm trying to convert a large time value in excel to a decimal number for hours.
I currently have a column adding up "Ready time" for a call centre which is 3545:20:02 as a SUM. I now want that to show me the same hours in a decimal format e.g. 3545.333 as it's used in another calculation.
For reference, when I convert the above time to a General excel value, it is 147.7222454.
The formula I've been using is: =IFERROR((DAY(M54)*24) + HOUR(M54) + (MINUTE(M54)/60),0) and has been working fine for smaller time values.
Thanks in advance!
Excel counts in days (1 day = 1) so for hours you just multiply by 24, i.e.
=M54*24
format result cell as number with required number of decimals
[the reason your current formula fails is because of DAY function - DAY is day of the month so it fails for you when the time value is >= 32*24 = 768 hours]

Handling TimeRecording-files in Excel (formatting cells)

Excel's assumptions about cells are confusing the heck out of me. I'm on Office 365 - Excel for Mac, Version 15.28.
I'm TimeRecording on a lot of things, I would like to calculate relations and tendencies on the different things. I've exported my log-files, and have opened it in excel. A simple version looks like this:
In the real sheet, then I have 40+ tasks and 50+ dates. I would like to be able to do some calculations on these data. But Excel doesn't 'know what it is' (time durations) and therefore can't add them up or do anything.
So one question would be, to how to let Excel know, that this is time durations? I tried doing what this question suggests. But when I format the cells as [h]:mm then it gives me this error:
FYI: In the big sheet, then there's so many times, so the total amounts up to something along the lines of 633:33.
I would just like to be able to do simple calculations, such as:
=SUM(B1, C4, D5)
or
=SUM(B1, C4, D5)/COUNT(B1, C4, D5)
And maybe also make some charts and graphs.
Another attempt I've done is to try to get all the cells to have the format hh.mm instead of hh:mm, but this gave me problems. My approach was this:
Convert all the cells to 'Text' to tell Excel: 'Hey... Don't do any auto-converting/guessing here, and don't turn any of the cells into dates or decimal numbers or fricking origami swans!'
After that then I make a simple 'Replace all' of : to .
But after the 'Replace all', then 633:33 turns into 633.36.00 (even though the cell was a 'Text' cell).
And if I then simply double-click on the cell to edit it, then the numbers 'magically' turns from 633.36.00 to 27/01/1900 15.36.00 ... What the hell!? I need a procedure that doesn't require me to go through all my thousands of numbers and edit any of them (or ensure that Excel have turned the numbers into flying unicorns.
EDIT1
Here's an example of the total sheet I'm working on in Google Sheets.
EDIT2
If I format the cells as [h]:mm, then I get an error (see above). But if I format it as [t]:mm, then I don't get an error (thanks to Axel Richter for pointing that out). It may have something to do with the initial language of my Excel-installation (danish).
However... If I then try to sum up a bunch of cell, after doing this formatting to everything, then it sums up to 0:00.
If I format all the cells to Time (well-knowing that it's the wrong format, but hoping that Excel can see it and fix it) - and thereafter trying to sum up a couple of cells, then it sums up to 00.00.00 (even though it wasn't empty cells).
Is it also important, that when I sum up some numbers, that I do it from a General-cell - or does Excel know, that if I start with the =-sign, that it's going to be a calculation (and therefore the cell-format doesn't matter)?
Excel will store date-time values as floating point double values in following form:
1 day = 1
1 hour = 1/24 = 0.0416666666666667
1 minute = 1/24/60 = 0.000694444444444444
So formatted as time all values greater than or equal 0 but lower than 1 will be from 00:00 to 23:59. Values greater than 1 will be dates with 1 = 01/01/1900 00:00:00. But if you are formatting such values as time only using hh:mm for example, then only the time is shown. The date is simply hidden.
For example 1.25 formatted using hh:mm will show 06:00 although it is 1 1/4 day which is 01/01/1900 06:00:00. To see hours from multiple days the format [h]:mm can be used. For example 1.25 formatted using [h]:mm will show 30:00 which is 1 day (24:00) + 1/4 day (06:00).
Although Excel will do this independent of locale settings, the user defined format codes used and the kind of input values which Excel will take as time values are dependent of locale settings.
For example with your locale Danish (Greenland) the format codes are different. See Formatere tal som datoer eller klokkeslæt .
So your format code will be [t]:mm instead of [h]:mm.
And also with your locale Danish (Greenland) the time separator is . instead of :. So values which Excel will take as time values are 123.45 (123 hours, 45 minutes) instead of 123:45.
In your last comment you say: "whereafter it weirdly looked the same, such as: 123:45 and not 123.45". Yes that is because your user defined format [t]:mm contains the time separator : also. But that is different from your locale settings where . is the time separator. While inputting values Excel respects the locale settings and so expects 123.45 as time value for 123 hours and 45 minutes. But after the input Excel applies the cell formatting [t]:mm and so shows 123:45.
In your last comment you say that it confuses you that 17:24 * 24 equals 417:36. But that is exactly what it should.
17:24 is 17 hours and 24 minutes. That multiplied by 24 is 17 hours * 24 = 408 hours and 24 minutes * 24 = 576 minutes. 576 minutes are 9 hours and 36 minutes. So we get (408 hours + 9 hours) and 36 minutes = 417 hours and 36 minutes = 417:36.
I cannot edit the sheet so I copied it. As you can see in column AS and row 43, Google provides 'duration' format. You don't have to manipulate something. Just change the cell format.
In Excel, duration format is [h]:mm. Hit ctrl + 1 at the cell and choose Custom and type [h]:mm at Type and hit enter.
If SO answer is too difficult to follow, try this.
I apologize in advance for how rough this is, but I mostly slapped this code together to fit the task and didn't want to waste time on it. The principles are there though, so at the least it should point you in the direction you need to be heading.
Sub Time_Summarization()
Dim i As Long
Dim j As Long
Dim cell As Range
Dim sHolder As String
Dim vHolder As Variant
Dim arrHolder() As Double
Dim bAdd As Boolean
Dim dHolder_Whole As Double
Dim dHolder_Remainder As Double
Dim sOutput As String
ReDim arrHolder(0 To 2)
' Use a set range. Selection here is just for testing
' Ideally there should be data validation in this loop to ensure that the input
' values are numeric time values.
For Each cell In Selection
' Convert the cell value to a date to permit splitting.
' The value is then split into a 1-d array with 3 positions (H, M, S)
vHolder = Split(CDate(cell.value), ":")
' Loop through the split values from first to last, and trim off the AM/PM.
' If it is a PM date, set the flag to add 12 (13:00:00 gets displayed as 1:00:00 PM)
For j = LBound(vHolder) To UBound(vHolder)
' If PM, set the flag.
If InStr(vHolder(j), "PM") Then bAdd = True
' Remove "AM" and "PM"
vHolder(j) = Replace(vHolder(j), " AM", vbNullString)
vHolder(j) = Replace(vHolder(j), " PM", vbNullString)
' Add the values into the array in the same order.
arrHolder(j) = arrHolder(j) + vHolder(j)
Next
' Add 12 hours if needed
If bAdd Then arrHolder(0) = arrHolder(0) + 12
' Reset the flag for the next loop
bAdd = False
Next
' Step backwards through the array to round up increments of 60.
For i = UBound(arrHolder) To LBound(arrHolder) + 1 Step -1
' This will return the number of times the value goes into 60.
dHolder_Whole = arrHolder(i) \ 60
' This will return the remainder of the value divided by 60.
dHolder_Remainder = arrHolder(i) Mod 60
' Round up seconds to minutes, and minutes to hours.
arrHolder(i - 1) = arrHolder(i - 1) + dHolder_Whole
' Overwrite the remainder
arrHolder(i) = dHolder_Remainder
Next
' Combine the separate values into a string.
sHolder = arrHolder(0) & ":" & arrHolder(1) & ":" & arrHolder(2)
' Just for testing, do with the values whatever you wish.
Debug.Print sHolder
End Sub
Again, this is mostly a model that will work, but will need to be adapted to suit your needs.
Zeth, I downloaded your file and I can make some calculation with your time data. I juss selected all cell with time duration and change the format of cell to "time". Seemingly you should change all cells format, incluiding the empty cells.
If it does not work, find the "More format of numbers" ate the "Numbers" menu. Then, select the option "Hour" and chose the format closest to the format of your data. Also pay attenction to the option "locality" at the bottom of this menu. The option of hour format deppends on the region selected. (Each region in the world have some convenctions about it and Excel reconize much of then.
Formatting the numbers does not change the way Excel does calculations.
So a cell (c3) formatted as time and showing 01:28:00 actually contains 0.061111 because Excel treats time as fractions of a 24 hour day.
When you add up a lot of times and they add up to more than 24 hours the underlying number is more than 1 day so you get number of days before the decimal point and after the decimal point is the fraction of 24 hours remaining. So to convert a duration or time to hours you just multiply it by 24 and format it as a number or general (and the numbers after the decimal point are fractions of an hour). If you just want to format the result as hours and minutes use a format of [h]:mm and do not multiply by 24 - on your system look at Format Cells - Custom to see what the equivalent of [h:mm] is.