I've looked at this similar question but I'm still fairly lost. I have one file which I want to be a part of multiple changelists. I seem to remember that doing this involves creating multiple clients, but that's stumping me, too. I can create a client just fine, but I can't figure out how to "check out" that client and start creating a separate CL in that client, one that is independent from the CLs I have started in my original client.
Any help would be hugely appreciated!
(It's also worth mentioning that I'm working on a source control system that's forked from perforce, not exactly perforce).

One file can only be part of multiple submitted changelists if each changelist has a different revision -- e.g. if you add a file to the depot its revision #1 is in one changelist, when you edit it and submit that its revision #2 is in another changelist, and so on. Same file, different revisions.
One file can be part of multiple pending changelists at the same time (all derived from the same revision) if each changelist is on a different client. If you're creating different clients on one machine, make sure that each has its own unique client root, since you'll want to have unique copies of the file(s) on your local machine. Then you don't need to do anything special to open the file; each client is independent of the others. Just "p4 sync" and "p4 edit" the same way you did on your first client. (Make sure to use P4CLIENT or the equivalent to specify which client you're using at any given time; P4CONFIG files make this easier by associating a P4CLIENT setting with a particular working direcotory.) The only difference you'll see is an informational message from "p4 edit" that the file is already open by another client. Creating changelists works the same way as it always does; run "p4 change" to create a pending change, "p4 reopen -c change" to move files around between changes.
There is also shelving, which is similar in some ways to having multiple pending changelists on different clients (except that the changelists are all stored on the server rather than in a bunch of different client workspaces) but if you happen to be using a very old version of Perforce (or something similar to it) that's probably not an option.

Related

Is there a way from p4 command line to shelve local changes without checking out the files in perforce first?

Our perforce project has exclusive lock on, so we can't checkout files other people have checked out. Is there a way to bypass checking out the files and shelve the local changes directly?
I've tried using "p4 reconcile" and "p4 print" with no luck.
I don't think it's possible to do this (at least not without circumventing the +l protection, which is possible on some server configurations), since shelve only operates on open files.
The idea of exclusive-open (+l) files is that because it's not possible to merge them, you never want someone making changes that are based on anything other than the latest version (including whatever version someone is currently working on). So making a shelf of a +l file would go against the intent of that (since your shelf would be based on the current depot revision and would not include the other user's changes).
If this is a file where it does make sense to modify it concurrently, it probably should not have the +l type. IMO the +l type should be used sparingly or never. You can ensure that you will not need to resolve changes by using a normal p4 lock, which allows other users to open and shelve the file at any time but not to submit it until the lock is released; figuring out how to resolve and submit after you've submitted your changes will be their problem.
If you don't have control over whether this file uses +l and you need to get your changes onto the server, my recommendation would be to branch the file (+l doesn't prevent that, even though it probably ought to) and submit/shelve your change to the branch.

How to only receive get file changed by revision In perforce P4

In P4, I only want to pull file changed my client workspace from server. But When I use "p4 sync", this command get all files from server. So, How to get files changed from list revision ? with the files were existed on local and not changed, the command P4 sync do not need sync. My command is here:
p4 sync -f //depot/...#Revision
If you want to restore a file you deleted with p4 delete file, use p4 revert file, not p4 sync. p4 sync is for getting the changes that other people made to the files, not for altering the changes that you made.
There are three different reasons that the files in your workspace might differ from the current head revision in the depot:
A new revision has been submitted to the depot since the last time you synced.
You have opened the files (e.g. with p4 edit) and made changes to them that are not yet submitted.
You have modified the read-only synced files in your workspace without opening them.
(You don't say in your question which of these is the case, which is why you've gotten a couple of different answers that are based on different assumptions about your workspace state -- I'm guessing it's #3, personally, but I'll give the answer for each one so you can understand how it's "supposed" to work vs what's actually going on here.)
In case 1, a normal p4 sync command will update only the files with new revisions. If the revision you previously synced is the same as the head revision, p4 sync won't update it. This makes p4 sync very fast -- you can have a million files in your workspace, and if only one of them has changed since you last sync, only that one file is affected.
In case 2, no p4 sync command will update the files, in the interest of preserving your open changes. To submit your changes to the depot, use p4 submit; to discard them, use p4 revert. Again, only the open files are affected by these commands, so a revert operation affecting only a few files isn't slowed down by however many other files are in your workspace.
In case 3, your workspace is in an inconsistent state -- Perforce's standard workflow is that any time you modify a local file you should "open" it so that the server can track your local work (and optimize operations like sync, submit, etc, as well as alert other users who open those files simultaneously to potential conflicts). If you modify a file locally without modifying it, commands like sync will no longer work as well because the state of your client is not known to the server.
You can recover from an inconsistent state by using the p4 reconcile command (which will open all the inconsistent files so that you can either submit or revert them), or the p4 clean command (which irrevocably discards the inconsistent local changes, as if you'd done p4 reconcile immediately followed by p4 revert). These commands are significantly slower than a normal sync operation since they need to scan the entire workspace rather than only the changed files, but they are still significantly faster than a sync -f since only the changed files are actually re-transferred.

How can you save and restore a list of checked out files in Perforce?

I have, in perforce, a sort of 'basic working set' of files that I keep checked out (and therefore writable) when working. However, every time I commit my changes, this list gets disrupted - some things committed, others reverted - and then I have to waste time tracking down and checking out all these files again.
So, is there some way to save the list of currently checked out files, and then later check out those same files again?
I primarily use P4V, but I have P4Win and command-line Perforce available. I'd strongly prefer a GUI solution, though.
I only want to save and restore the state of which files are checked out, not the contents of those files, so shelving is not the answer
I am aware of the 'Do not submit unchanged' and 'Check out after submit' options. They are not sufficient. For instance, frequently I will have files which are programmatically generated which register as 'changed' when the only thing that is different is the 'File generated on' timestamp; I need to prevent such spurious revisions from being submitted, and I have not found any practical method of searching for and managing such files that doesn't involve the 'revert if unchanged' command.
You can do:
p4 -ztag opened | grep depotFile | cut -d ' ' -f 3 > files.txt
to save a list of files already open in your client. (If you don't have Unix utilities for Windows, you could construct this list by whatever means you want, such as running p4 opened > files.txt and manually editing files.txt in an editor.)
Once you have a list of files, you can open all of them via:
p4 -x files.txt edit
This doesn't meet your preference for a GUI-based solution, but you could create .cmd scripts to perform these actions and then double-click on them (or on shortcuts to them).
The easiest solution would be to exclude those generated files via your workspace specification, e.g., "-//depot/files/ignorablefile.sh"
They can still reside in your local workspace, but the app will not attempt to update them or add them to source control.
You said that shelving's not the answer, but that's what I would go with as the easiest solution (i.e. the one that involves the least scripting and/or fewest manual steps) for the specific question you're asking:
Shelve your pending change (let's call this change 1000).
Move your open files to a new pending change (let's call this change 1001).
Submit change 1001.
Unshelve change 1000.
Sync and resolve.
Now you have the same exact files open (the unshelve opened them) but at the head revision (the sync and resolve does that).
Now, looking past what you asked for to what might make your life easier: rather than reverting the files you don't want to submit (and having some sort of scheme to get them back later, possibly via shelving as described above), what I'd do is move them to another changelist. So instead of:
Identify "unchanged" files.
Revert unchanged files.
Submit remaining files with "reopen" option.
Reopen previously reverted files (somehow).
I'd do:
Identify "unchanged" files.
Move unchanged files to another changelist N.
Submit remaining files with "reopen" option.
Move all files from changelist N back to the default changelist.
All of those except step 1 are simple one-shot commands that you can do from any client. Personally, I'd automate steps 1+2 with a script (I'm assuming it's programmatically possible to determine whether the only diff in one of these files is the timestamp) and put it into P4Win/P4V as a "custom tool".

How to revert to an earlier revision of a project in Perforce following a deletion?

Let's say I have a project under //depot/MyProject. At changelist 1001, this project took a major change in direction, changing everything about it. At changelist 2001, it got p4 deleted. The depot is now at change 3000.
I'd like to restore //depot/MyProject back to its state at changelist 1000. Specifically, I'd like the revision history to record the fact that change 3001 is an integration of change 1000 - i.e. the last version of this project before the major change.
Can Perforce do this at all? Or do I have to rename it into something like //depot/MyProjectOriginal, because //depot/MyProject is now tainted with all those deleted revisions?
(the naive attempt to p4 integrate //depot/MyProject/...#1000 //depot/MyProject/... fails with an "all revision(s) already integrated" message)
You cannot force the integration.
You have two options: you can create a branch using changelist 1000 as the base; or sync to changelist 1000, check out all files, and then submit (a.k.a rolling back).
Option 1
If you do want the history of your changes between 1001-3000 (i.e. a fresh start from changelist 1000) then this is the better option. Using P4V, create a new branchspec and then perform an integrate from your current project to the new branch at changelist 1000. This will be submitted as changelist 3001, when you compare differences between revisions, you will not see of the changes between 1001-3000.
In the P4 visualizer this will appear as a new branch creation at 1000.
Option 2
Sync to changelist 1000, check out all files, and then submit. There should not be any conflicts to resolve. This will be submitted as changelist 3001, however when you review history you will see the everything.
I hope this makes sense, any questions, please ask.
I don't believe that you can integrate files on top of one another like that. I think that you have two options.
If you are willing to move the files, you can do a
p4 integ //depot/MyProject/...#1000 //depot/MyOriginal/Project/...
and that will integrate MyProject at changelist 1000 to the new location.
If you'd like to keep the project at the same place, you can do that as well. It's really easiest in p4v - you can right click on the folder in workspace or depot view and choose "rollback...". In the subsequent dialog, you can then pick a changelist (or date, revision, etc) to roll the folder back to. In your case, I think that you would choose changelist 1000. Stick the files into a new pending changelist (I think that this is always good practice). You can then run a preveiw (to see what would happen), save the contents to a new changelist (so that you can inspect file contents before submitting), or just go for broke and pull the trigger and submit (I generally wouldn't recommend this).
HTH
Just do:
p4 copy //depot/MyProject/...#1000 //depot/MyProject/...
This also make a nice revision graph.
Though there is an accepted answer and plenty of other solutions, none of them works for me coz I need to rollback a large directory (with GBs of data)
Here is the way I used, which works fine for huge directory:
(Suggested to do in a new and clean workspace, though not strictly required)
Assuming the directory to rollback is //depot/foo/bar and you want to rollback to changelist 1234
Make sure no one is locking any files, and make sure the directory you are trying to rollback exists in your client spec
p4 copy -v //depot/foo/bar/...#1234 //depot/foo/bar/...
p4 submit
p4 copy -v is the meat of the solution. It tells Perforce server to perform virtual copy, which means Perforce copies the files but not actually in your workspace. This avoid huge data transfer for file content (when copying and when submitting). In my case, by using "rollback" in P4V (which is doing non-virtual copy), it took over an hour just for copy, and over an hour for submit for my folder. With virtual copy, whole process took me around 1 minute.
The most important thing is, it keep a sensible history. You can see your files being updated and rolled back, and all previous history exists.
use
p4 integrate -f //depot/MyProject/...#1000 //depot/MyProject/...
The -f flag means force an integration even if they have already been integrated.
From http://www.perforce.com/perforce/doc.current/manuals/cmdref/integrate.html

exclude a changelist from p4 sync

Is there any easy way to exclude a specific changelist from p4 sync?
I want to sync up my code, but I don't want to fetch the changes from changelist #1337
Like: p4 sync //depot/source/... - //depot/source/...#1337?
The best way to accomplish this is just sync to head, and then use the 'Back out submitted changelist' function in P4V ('Submitted' pane, right-click the undesired changelist, select 'Back out submitted changelist').
This will create a new pending changelist in your workspace with the undesired changes removed.
It is possible by syncing to a range and using two commands to "skip" the changelist.
p4 sync //depot/source/... - //depot/source/...#0,#1337
p4 sync //depot/source/... - //depot/source/...#1337,#head
Note: you may have to specify the changelist on either side of the one you want to skip - not sure if the range is inclusive.
HTH,
Dennis
Ok this should work depending on what you want to do. Man I really miss git :(
If you simply want to sync and temporarily ignore a changelist you can do what the first reply said and back out the change list. Just remember to not check that change list in unless you want to wipe out the ignored changelist for the branch. However this approach will not work if you need to make changes to files that exist in the ignored changelist.
If you need to work with the same files from the ignored changelist you can do the following. One thing to note however, is that the ignored changelist will be pulled out of the remote branch until you are ok with them being in your code. (there is one other option but requires someone else to do something)
If you want to ignore a change list, and not get rid of it completely but simply be able to work on your code with it off to the side, the following will work.
Back out the changelist as previously stated.
Submit the backed out changelist to wipe out the changes in the remote branch. (don't worry)
Now do another back out but this time back out the chagelist created by the previous back out and shelve it. This back out of the back out will be a pending change list that is basically a copy of the one you wanted to ignore. Once its shelved you can go about your work, even in the same files. The down side is that now the ignored changelist only exist on your work space and its up to you to submit it or decide what to do with it at some point.
You can keep the ignored change list shelved until you know what you want to do with it. If, after you work on your code, you want to re integrate that chagelist and merge it with yours you can simply unshelf it and resolve conflicts.
So the (other option)
You could do the above with help from another dev with a perforce account (perhaps the one who's changelist you want to ignore) in this case you could have them back out the changelist and submit, then you could sync, then they could back out their back out. In this case the remote branch would not need to stay in weird state while you worked on your code. The big downside is, that you would have to do this every time you wanted to sync.
A better option would be branching before an issue like this arrises but that is not as easy or light weight in perforce as it is in git.
Hope one of these options help or spark a finale and perfect solution from some one else.