This thread is a follow up to my previous one. It's in fact 2 questions, so I hope no one minds, as they are dependent on each other.
We are starting a new project at work and we consider it as a great opportunity to try Agile techniques in action. We had a brainstorming about ideas we read in several books and articles, and came up with concept that would suit us the best: 2 weeks iteration, followed by call with clients who would choose what stuff they want to have in next iteration. I just have few more questions, which we couldn't figure out ourselves.
What to do in the first iteration?
What to, generally, do in the first few iterations if we start from the scratch? Just give it a month of development to code core of the application or start with simple wire-frames with limited pre-coded functionality? What usually clients want to see? Shiny stuff that doesn't work or ugly stuff that does work?
How to communicate with clients?
Our initial thought it to set the process to something like this:
alt text http://img690.imageshack.us/img690/2553/communication.png
Is it a good idea to have a Focal Point on client side or is it better to communicate straight with all the clients to prevent miscommunication?
Any thoughts are welcome! Thanks in advance.

In my opinion, a key success factor for agile development is to focus on delivering value for the customer in each iteration. I would definitely pick "ugly stuff that does work" over "shiny stuff that doesn't work". Doing shiny UIs and trying to get the client to understand hat business logic takes a lot of time to implement is always risky which Joel Spolsky has written a good article about.
If the client wants enhancements to the UI, they can always put that as a requirement for the next iteration.
Regarding communication with clients I think that your scetch should be slightly adjusted. Talking in scrum terms your "focal point" is called "product owner". Having one person coordinating with the clients is good, as it can take quite a lot of time to get the different stakeholders agree on the needs. However the product owner (or focal point) should be in direct contact with the developer, without going through the project manager. In fact, the product owner and the project manager has quite distinct roles that gain a lot by being split on two people.
The product owner is the stakeholders' voice to the development team. The project manager on the other hand is responsible for the wellbeing of the project team and often keeps track of budget etc. These roles sometimes has opposing agendas, and having them split on two people gives a healthy opportunity for negotiation between conflicting interests. If one person has both roles, that person often tend to favour one of them, automatically reducing the other one. You don't want to work on a team where the project manager always puts the client before the team's needs. On the other hand no customer wants a product owner that always puts the team's needs first, neglegting the customer. Splitting the responsibilities on two people helps to remedy that situation.

I'd agree with Anders answer. My one extra observation is that many clients find it impossible to ignoire the Ugly. They get concerned about presentation rather than function. Hence you may need to bite the bullet and do at least one "Nice" screen to show that you will pay attention to presentation details.

What to, generally, do in the first few iterations if we start from the scratch?
Many teams use an Iteration Zero to:
setup the development infrastructure (source control, development machines, the automated build, a continuous integration process, a testing environment, etc),
educated the customer and agree with him on the methodology,
create an initial list of features, identify the most important and do an initial estimation,
define time of meetings (planning meeting, demo, retrospective), choose the the iteration length.
Iteration Zero is very special because it doesn't deliver any functionality to the customer but focus on what is necessary to run the next iterations in an agile way. But subsequent iterations should start to deliver value to the customer.
Just give it a month of development to code core of the application or start with simple wire-frames with limited pre-coded functionality?
No, don't develop the core of your application during one month. Instead, start delivering vertical slice of the application (from the UI to the database) immediately, not horizontal slices. This doesn't mean that a screen has to be complete (e.g. implement only one search field in a search screen) but it should ideally be representative of the final look & feel (unless you agreed with the customer on an intermediate step). The important part is to build things that provide immediate value to the customer incrementally.
What usually clients want to see? Shiny stuff that doesn't work or ugly stuff that does work?
To my experience, they want to see demonstrable progresses and you want to get feedback as soon as possible.
Is it a good idea to have a Focal Point on client side or is it better to communicate straight with all the clients to prevent miscommunication?
You need one person to represent the clients (who is called the Product Owner in Scrum):
he provides a single authoritative voice
he has a perfect knowledge of the business (i.e. he can answer questions)
he knows how to maximize the ROI (i.e. how to prioritize functionalities)

Agile generally wants to provide the client something valuable, quickly.
So I certainly would not spend "month of development to code core of the application". To me, that smells of the "big up front design" anti-pattern. Also, see YAGNI.
Get as much information from the clients about what they need soonest, and implement that in your first iteration. "Valuable" is in the eye of the client. Thet will know if they want to see slick UI (maybe they want to give a slide show about the product at a trade show, so functionality can be fake) or simple working features (maybe you're developing something that they need to start using ASAP). Business Value is what they say will help them do their job.
I'd make my iterations as short as I can (your 2 weeks could work, I suggest considering 1 week) If you absolutely can't have your dev team and your clients co-located, instead of having a call with the clients, I suggest a meeting. Demo what you've done over the previous iteration and solicit feedback about what should stay, what should change, and what should be added.
As others have said, your "Focal point" sounds like a Product Owner. What worries me about your drawing is if it is meant to imply that devs don't interact with the PO or the clients. One thing that makes Agile work is when there is lots of communication. Having communication to/from the dev team always filtered through the Project Manager is almost certainly bound to result in miscommunication, unnecessary work, and missed details.

I agree with the two answers given but I would just add one thing from personal experience. Are your customers bought in to the change towards quick iterations? As well as providing feedback after each iteration which is going to require the customer performing usability tests on each feature.
Now I don't know what your groups relationship is with your customer but its not unusual for customers to take a "Put request in - get working system out" attitude in that they are enthusiastic when giving requirements but not so forthoming with time when it comes to testing the feature.
Now this may be totally inappropriate to your situation but its always worth considering how your customer workflow will have to change as well as your groups.
Cheers

Related

Agile SCRUM: Horizontal versus vertical splitting [closed]

Closed. This question does not meet Stack Overflow guidelines. It is not currently accepting answers.
This question does not appear to be about programming within the scope defined in the help center.
Closed 5 years ago.
Improve this question
We have a project which is going to last approximately 5 sprints.
The project involves a number of user stories, each story involving work by different developers: Web (AngularJS & ASP.NET MVC) and CRM (Dynamics). It is therefore 'Vertically Split'.
Each user story builds on the last: more fields being added to UI and more fields having to be picked up by CRM workflows. Testing each user story therefore requires re-visiting the user interface and back-end a number of times and testing the new fields just added.
Unusually, we have been asked to handle the sprint with 2 different types of task: the user story is put on one post it note, and the story has been further decomposed into the activities required by each developer (UI / CRM). As a result we are actually ending up with two burn downs: this is something which I don't understand considering that we haven't provided estimates for the individual tasks.
I understand that splitting user stories vertically means that you are always going to deliver something useful, but I can't help but think this is not always going to be the most efficient way of delivering the project, especially when you consider you're revisiting the same parts of the application again and again.
Is there any scenario where a horizontal splitting is acceptable in scrum agile, as in our case it would allow a CRM developer to implement their work in a separate user story? After all, if it's early on in the sprint, the risks of not implementing a feature in the developers respective layer is quite small. Furthermore, there wouldn't be a need to decompose the user story into further 'tasks'.
By decomposing tasks into horizontal (architectural) tasks in this case, we can make the UI changes in a few days and then get the CRM developer to pick up the data that we send across in a separate story. I think this would also make it far easier to test, because you are testing each complete 'feature' in it's respective environment rather than building it up across several user stories....
Obviously if you are a full stack developer it's a lot easier to achieve vertical splitting,. But it's not the case with this project....
What is the suggested approach where you have an application which is consistently increasing the number of fields / UI? Is horizontal splitting of tasks ever permitted in agile or is it always a no-no?
I'm not sure that even if you split the tasks horizontally you will achieve what you'd like. Let's take an extreme example where UI developer completes 100% of his tasks while CRM developer completes none of his.
Will there be any feature released (or any user story fulfilled)? I guess not.
Therefore, I would suggest to address the UI and CRM developers as one unit (with common burndown) and split the tasks internally between them.
Preferably, they will work in similar tempo so they can provide each other with tasks to complete.
Also, this cooperation can be a good thing as both UI and CRM developers will feel more commitment to the project since they have a common goal and measured as a common unit.
Hope it sounds reasonble and helps you to make a decision.
This is where the concept of swarming comes in. Assuming your scrum team consists of members with technical competencies that cover all aspects of the user story (e.g. UI, CRM, DB, etc), then your scrum team can swarm the first user story working together to complete all aspects at the same time. Assuming you have a tester embedded on your team, they can be writing test cases for it at the same time as well. In a day or two that story is done and you have something fully functional and demonstrable to your product owner/stakeholder. Then the team swarms the next user story. It takes time for a team to get into a rhythm to be able to do this effectively, about 6-12 months in my experience for a team without prior experience working this way to do so.
Also by doing the entire vertical path up front you learn what is needed early and can make changes quickly before there is a lot of code to refactor. If you do an entire layer first and then the next layer, besides not being able to test that first layer yet, you end up finding things when implementing the next layer that will cause you to have to go back and redo the first layer. This results in extra work or creates non-maintainable code as things are hacked in to meet deadlines.

Giving up Agile, Switching to waterfall - Is this right? [closed]

Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 5 years ago.
Improve this question
I am working in an Agile environment and things have gone to the state where the client feels that they would prefer Waterfall due to the failures (that's what they think) of the current Agile scenario. The reason that made them think like this would be the immense amount of design level changes that happened during the end stages of the sprints which we (developers) could not complete within the time they specified.
As usual, we both were blaming each other. From our perspective, the changes said at the end were too many and design/code alterations were too much. Whereas from the client's perspective, they complain that we (developers) are not understanding the requirements fully and coming up with solutions that were 'not' what they intended in the requirement. (like they have asked us to draw a tiger, and we drew a cat).
So, the client felt (not us) that Agile process is not correct and they want to switch to a Waterfall mode which IMHO would be disastrous. The simple reason being their satisfaction levels in a Agile mode itself were not enough, then how are they going to tolerate the output after spending so much time during the design phase of a Waterfall development?
Please give your suggestions.
First off - ask yourself are you really doing Agile? If you are then you should have already delivered a large portion of usable functionality to the client which satisfied their requirements in the earlier sprints. In theory, the "damage" should be limited to the final sprint where you discovered you needed large design changes. That being the case you should have proven your ability to deliver and now need a dialogue with the client to plan the changes now required.
However given your description I suspect you have fallen into the trap of just developing on a two week cycle without actually delivering into production each time and have a fixed end date in mind for the first proper release. If this is the case then you're really doing iterative waterfall without the requirements analysis/design up front - a bad place to be usually.
Full waterfall is not necessarily the answer (there's enough evidence to show what the problems are with it), but some amount of upfront planning and design is generally far preferable in practice to the "pure" Agile ethos of emergent architecture (which fits with a Lean approach actually). Big projects simply cannot hope to achieve a sensible stable architectural foundation if they just start hacking at code and hope it'll all come good some number of sprints down the line.
In addition to the above another common problem with "pure" Agile is client expectation management. Agile is sold as this wonderful thing that means the client can defer decisions, change their mind and add new requirements as they see fit. HOWEVER that doesn't mean the end date / budget / effort required remains fixed, but people always seem to miss that part.
The agile development methodologies are particularly appropriate when you have unclear requirements and when you may need to make design changes at later stages in your project. Waterfall is a less appropriate approach in this case. The waterfall approach is appropriate for projects which are well understood and when the requirements are unlikely to change during the project's lifetime. It doesn't sound like that is the case here.
How long are your sprints? An alternative approach might be to decrease the sprint length - at least at the start of the project. Deliver new versions to the customer more often and discuss the changes with the customer. If you aren't doing what they want this will become apparent more quickly so less time will be wasted on implementing solutions that don't meet the customer's requirements.
I'm not sure what kind of shop you run, so it's hard for me to come up with good recommendations. I can offer two guiding principles though:
If you have bad communication with the customer, no development methodology will save you.
It's none of the diner's business how a chef organizes the kitchen, as long as the meal is tasty.
It sounds like you have serious project management and architecture/design issues, and it sounds like your communications have also broken down. Fundamentally I don't think changing your dev methodology is going to fix any of that, and is therefore the wrong thing to be doing (though it may restore some client confidence).
I would be especially concerned about moving towards waterfall since you are now choosing to essentially capture the requirements just once (which we know you have a problem with) with no capacity for input. That rigidity is good for inflexible delivery targets, but it's completely inappropriate here where you have changes all the time - that's agile!
Short term I'd step back and double check your requirements at this stage with them. Renegotiate and confirm your current state in relation to those.
Medium term, I'd open up more communications with the client - try and get them involved in a daily scrum for a while (until you restore confidence, then you can be more flexible).
Long term, you have to be worried about how your PM's and senior devs have managed to get you into this position. If the client is being unreasoanable that's one thing (but it's still up to the PM to manage that, so you're not absolved). It's not reasonable to complain about having too many changes, that just means you screwed up in determining requirements (which is a dialogue, not a monologue) or that you have to have more numerous, but probably shorter sprints.
Above all, I can't see moving towards waterfall is possibly correct. It doesn't fix anything directly and I can only see it exacerbating the problems you've already highlighted.
Caveat: I'm not really capable of a balanced view on waterfall since I've never seen it work effectively and imho it's just completely outdated for enterprise projects.
Agile development does not save you from the burden of actually coming up with a design which both you and the customer understand similarily. Agile just makes it possible to come up with the design in smaller increments and not all at once. And, in the case of a difficult customer, coming up with a proper design takes time.
So, I would spend more effort in sitting down with the customer, with a whiteboard, going over what is it that they actually want. I don't think it really matters in this case if the development process is agile or waterfall.
Agile or waterfall are just words. There are only things that work, and things that don't.
Software development seems virtual to many people and they don't understand why it's hard to change a small thing they request.
Your customers should understand that building a software is just like building a house : when you have built all the foundations and walls, it's hard to change all the house final plan, and room design.
Some practices helps avoid this kind of problem : data modeling, data dictionary, data flow diagrams... the goal being to know every requirement in complete detail. Cutting your product in many independant blocks help starting coding while continuing designing or specifying other parts of your final product.
See Steve McConnell book : "Rapid Software Development : taming wild software schedule" for all the practices that work.
The reason that made them think like this would be the immense amount of design level changes that happened during the end stages of the sprints which we (developers) could not complete within the time they specified.
Scrum is in a way a "short waterfall", and you should be isolated from changing requirements for the sprint duration. It seems that this is not happening! Therefore, don't see you will gain anything from switching to traditional waterfall, but you should stick to freezing requirements for the sprint duration.
Maybe your iterations are too long?
(I assume you follow Scrum, since you mention sprints).
Talk to your clients and agree the following:
- Shorter iterations, up to 3 weeks max.
- No changes in requirements during the iteration.
- Features are planned at the beginning of the iteration
- Every iteration ends with deliverable: fully functional software with all features that are fully operational
- Iteration length does not change. Unfinished features are left for the next iteration (or maybe discarded if client changes his mind).
- Number of "feature points" you can deliver in a single iteration should be based on the team metric, not client insistence. This is your "capacity".
- Client decides what features (but not how many of them) are planned for the iteration
Another thing you should ask yourself is why there are so many "design level changes" in your application. By now, you should have basic architecture and design in place. Maybe you should review the actual design and try to impose some design guidelines and implement some patterns. For example, in a typical enterprise web app, you will probably end up using something like DAO. When you add new features, you create new DAO, but basic architecture and design will not change.
It seems however, that you are not delivering what the client wants. In that case, it is of outermost importance to deliver working product to the client, so he could provide sensible feedback for the next iteration.
Regarding
"we (developers) could not complete
within the time they specified."
The client should not be the one to specify the iteration time-frame. Iteration length should be always the same. The requirements that enter into the iteration should be obtain as a result of client prioritization, but the amount of requirements that is planned for the iteration should be based on the estimation that team performs and number of "points" you are able to deliver during iteration.
For me it sounds as if there was no "Big Plan[TM]" in the agile project. Using an agile process does not mean that there is no long term plan, it is more about to deal with the increasing uncertainty in the farer future. For example there should be a release plan with the planned features for all releases in the next 2 months (and a lesser detailed plan with features for the releases after that), so it is clear to the customer when to expect a feature, and when there is a possibility change requirements.
Also to me it seems that there was not (enough) customer involvement in the process. I know that this is a very problematic point, but it helps a lot if the current progress can be discussed with the customer at the end of each iteration. As #Mark Byers already wrote, the more feedback you can get from your customer the better you are.
Also try to not assign blame, as this keeps people to block. Try to use the inspect-and-adopt approach to get a better process instead.
It's not clear what sort of design changes you mean. Graphical design? User experience design? Code design?
In any event, the best solution is more, and earlier, discussions with the client. Jointly develop explicit, concrete examples that satisfy the client's requirements. You can turn these examples into regression tests to ensure that you continue to satisfy them.
Also, continue the discussions as you progress. Show your output as it is available--don't wait until near the end of the sprint. And work on the part most likely to generate problems first. Also look at ways to make it easier to change the things you're finding often change.
The point is to get the client more involved, even to the iteration of a design. Perhaps you'll want to have some discussions focused only on the design.
Your client does not know about how to develop software, or how to manage the software development process. Don't expect the client to provide meaningful instruction on these matters. As a special case, the client does not really know what terms such as 'waterfall' and 'agile' mean; don't expect them to provide meaningful input on your development methodology. Moreover, the client will not really care about these details, as long as the requirements are met within the agreed budget and timeframe. Don't expect them to care, and don't confuse them with lots of inadequate builds and irrelevant information on your internal process.
Here is what the client does care about, and is trying to talk to you about (partly using your own technical jargon): their requirements, their disappointed expectations, and the way you communicate with them. On these matters, the client is the absolute authority. Interpret what they are saying as being about your relationship and the product, not as usable commentary on internal process. Don't cloud the water with your internal deadlines and processes, discuss progress and expectations and the relationship. (If they insist on talking about internals you can remap the terms: e.g. what they understand as being 'the next release' may be internally known as 'the next major release', or whatever).
It sounds to me like the client may want a higher threshold before they get asked for feedback or play with a bad build. It's worth verifying if this is true. If so, you should honor that - and still use agile methods internally if that is what your team feels is best. If they say "waterfall," you may be able to interpret that internally as meaning "we set a deadline for requirements, and then we don't allow more features to be added for a while." Discuss with the client whether it will suit them to have a requirements deadline followed by this sort of freeze.
Someone on your team needs to be the client advocate, and sit on top of the client's issues and fight for them. This advocate must not be sidelined, nor can they take the team's side against the client; they should be the proxy-boss. Then you can separate the internal process communication (team to advocate) from the external communication (advocate to client). The advocate can in some measure insulate the client from the chatter and the builds they don't appreciate, without artificially imposing a certain sort of management or scheduling on your internal process.
To clarify, I do not at all think that you should be secretive or distant with the client, but you should (A) listen to what the client is saying about the relationship and how you are communicating and honor that, (B) keep that separate from internal development process, which should be managed in whatever way will ultimately meet client's expectations.
Fire the client. Even if it is your fault for not understanding what they mean, waterfall would give them 1 chance to give you feedback instead of a chance at the end of each sprint. Some people/clients are literally so stupid that they are not worth working for. Fire them, or tell them that you're using Waterfall without actually switching.
Obvious problem here is communication with customer. If you really want to do agile you have to communicate with customer on daily basics. Only customer should be able to make decision. If you communicate with customer only during mid spring and at the end of the sprint it is natural that later on you will found problems in your application. Also features implemented in sprint has to be accepted and tested by customer. Until that features are not completed.
I'm writing this because I have similar problem on my current project but I know where we failed.
If the communication issue between the Team and the Customer is not fixed, the situation could be worse with waterfall, if the customer only sees the product once it is complete (tunnel effect).
You commented changes from sprints 6-7 started to cause rework of tasks achieved in earlier sprints. Those changes should have been detected earlier - during the Sprint Review.
If there is a misunderstanding in a feature description, and the Team does not implement what the customer is expecting, this should be detected no later than the Sprint where the feature is implemented, and ideally fixed in the current Sprint.
If the customer changed it's mind, the new ideas shall be added to the Product Backlog, prioritized and selected for a Sprint, as any other backlog item. This should not been deemed as rework.
Do you deliver the software to the customer after each sprint, or are you just demoing it ?
The origin of the miscommunication could be at the Sprint Planning: the Team should only commit on Backlog Item that are clearly defined. The definition of the items should comprises the acceptance criteria. Is the customer the Product Owner, and is it the Product Owner ?
Remote debugging of a development process is sufficiently difficult that I would hesitate to offer any opinion about what you should do. It seems to me noone outside your team can plausibly have enough information to make a very useful judgement about that.
A lesser jump to a conclusion would be to make a guess as to what went wrong. From your description, it sounds like early deliverables, which you thought were progress in the bank, ended up being majorly reworked.
One common cause of that is the late discovery/creation of 'all' requirements, things that are supposed to be true about everything in the scope of the project. These can be pretty fatal if taken seriously: something as simple as 'all dialog boxes must be resizable' is, for example, apparently beyond the capability of Microsoft to retrofit to Windows.
A classic account of this kind of failure (albeit in a non-agile project) can be found here
"Once they saw the product of the code we wrote, then they would say, 'Oh, we've got to change this. That isn't what I meant,'" said SAIC's Reynolds. "And that's when we started logging change request after change request after change request."
For example, according to SAIC engineers, after the eight teams had completed about 25 percent of the VCF, the FBI wanted a "page crumb" capability added to all the screens. Also known as "bread crumbs," a name inspired by the Hansel and Gretel fairy tale, this navigation device gives users a list of URLs identifying the path taken through the VCF to arrive at the current screen. This new capability not only added more complexity, the SAIC engineers said, but delayed development because completed threads had to be retrofitted with the new feature.
The key phrase there is 'all the screens'. In the face of changes of that nature, then, unless you have some pre-existing tool support you can just switch on (changing all background colours really should be trivial), you are in trouble. The progress you think you had made up to that point will have retroactively turned out to be illusory.
The only known approach to such issues is to get them right first time. If that fails, live with having them wrong.
A lot of shops add Agile trimmings to make themselves "look Agile" to customers who expect it. Maybe you just need to add some Waterfall trimmings, and show them the product once every 2 sprints.
I believe your client is wrong to move to waterfall. It's curing the symptom, not the disease.
The problem you describe is one of communication - the client wants a tiger, you're giving them a cat.
The waterfall model includes many steps to verify that the requirements as written are being delivered - but it doesn't ensure that the written requirements are what the business meant.
I would look at techniques like impact mapping, behaviour-driven development (BDD) and story mapping to improve communication.

How do I manage specs in Scrum? [closed]

Closed. This question does not meet Stack Overflow guidelines. It is not currently accepting answers.
This question does not appear to be about programming within the scope defined in the help center.
Closed 5 years ago.
Improve this question
Referring to this buddy question, I want to know how one can manage specs in Scrum process ? I'm facing this problem while assigning tasks to my team for the sprint. Needless to say - I'm new to Agile/Scrum.
Currently, we are using our own specs sheet to map StoryId to SpecId and vice versa. I'm getting the felling that Scrum is more about project management [getting things done on time] and you need a seperate process to manage specs and requirements.
How do we manage specs in a Scrum process ?
The short answer is, you don't.
The important question to ask yourself when writing these specs, is why do we do them? What is the value in the spec?
The value in the spec usually comes in communicating the ideas of the business with the development team. Scrum is designed to bring the business (in the form of the Product Owner) to the development team. By interacting with the team frequently (remember, individuals and interactions over processes and tools), and by seeing working software frequently, the business can work hand in hand with developers to produce software that solves business problems better than by trying to spec out the whole thing before you get to try it out.
This is how Agile projects do a better job of delivering the product the business wants instead of the product they requested.
That said, there are certain base criteria that need to be met. We can test for this, and as with any good tests, we can automate it.
Have a look at BDD and Cucumber. In addition to your User Story, it's good to have a basic set of conditions of satisfaction, preferably in the "Give/When/Then" format. These conditions are the minimum set of criteria for the story to be accepted as complete.
For example, "Given I am logged in, when I log out, then I am taken back to the home page".
If you're going to have acceptance criteria, you're going to want to automate it. The worst part of most specifications is they often end up out of date and collecting dust when the project is complete.
Also, you shouldn't be assigning tasks to the team. Scrum teams are self organizing and anyone should be able to grab any task they feel they can work on while respecting the priority of the stories. Swarming is a big part of the performance benefits of Scrum.
You may want to consider bringing in an outside coach to assist with your transition.
I think that the easiest way is to make the specifications a part of the user stories within the tasks, themselves. Clearly list the acceptance criteria in each one (or if your issue tracking software allows you, create them as first class work item types). Let the issue in whatever you use for work item tracking become the living document.
There are drawbacks, such as finding related issues as specs change over time, but this can usually be managed in the work item tracking tooling, assuming your can relate issues to each other.
The way that we do it is that we (actually a BA, not the developers) creates a sign-off deck for the product owner to review and we collaboratively create tasks off of that. If we cannot create a task, or there are open questions, we will go back to the product owner with those questions and update the deck. All of our decks are organized (in SharePoint) so that we can easily find them in the future.
For me the specs is in the user stories. We define the specs and the tasks duing out initial scrum meeting along with the product owner. The specs and tasks are just for the life time of the scrum iteration as everything might change in the next iteration(in the worst case but there will definitively be changes).
We usually keep track of the specifications and task on a spreadsheet just so that everybody know what they are working on. I have also tried a few software to do this and one of the most interesting ones I have come across is from [VersionOne][1] and also from [Rally][2].
But I still find that using a simple spreadsheet is the fastest and simplest solution.
As I understand SCRUM, it does not take care about specs management. You have to broke/map your specs or specs changes to stories and tasks separately. But you can have a task for this :).
There is a real tension between Scrum and other agile dev methodologies and spec writing. I think there are two big points of tension:
Because agile says everything should
be on an index card, that means you
have to have stuff planned out
enough to fit on an index card.
(E.g. you have to know how it's all
going to work.)
Some things don't make sense in
isolation (what's the use of an
upload file page without a manage
uploaded files page, for instance.)
You don't have to design the whole app all at once, but you have to have a vision of the whole app. Then, especially if you have a separation of designers and programmers, you do functional design for a sprint-sized chunk at a time. Those designs then have to be broken down to story-sized chunks.
This is a lot of up front functional design, and I think that's overlooked in a lot of the talk about agile methodologies. Perhaps some shops have the devs do more of the design. Also, I think it's a lot easier to use scrum/agile for making changes/bug fixes to existing apps rather than building new ones.
The thing I've found most helpful is to fight back on story size. A lot of organizations have gone crazy, saying stories need to be only a few hours. The original scrum book says 16 hours, I think, which is often large enough to fit an entire screen of a web app. So "implement manage my account" could be a story (as opposed to the hundreds-of-tiny-stories approach of "implement username", "implement password" etc.) Then reference your design doc for "Manage My Account" and make sure to have word-perfect screenshots/prototype/mockup so the dev can look at them and copy/paste the text directly into the code they're writing, and they know for sure which fields need to be there (or which links, or which pictures, or whatever).

How do you draw the line between "Agile Development" and "Scope Creep"? [closed]

Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 5 years ago.
Improve this question
In an iterative development environment, such as an agile one, how do you draw the line between a regular iteration and the beginnings of scope creep? At what point do you tell the client that, "No, we can not do that change, because of ?"
agile iterations have fixed scope; the customer agrees to not change the scope during the iteration (though they can cancel the current iteration and start it over). In between iterations, the scope may change - dramatically.
given the above, scope creep by definition cannot occur in an agile project. The notion of scope creep is a legacy waterfall concept which assumes that the entire scope is known up front and will not change for the duration of the project. This concept does not apply to agile methods as long as each iteration has a fixed target.
This is quite simple in a scrum approach. In Scrum you set your sprint time, e.g. 2 weeks, and then fit items into this. When a client wants something added it gets put into the backlog and will be done in a future iteration. If they want it now you will have to explain to them that something will be dropped for that to fit into the iteration.
for me scope creep is happening when new function is added without the schedule being explicitly adjusted.
With agile methods the user is deeply involved in deciding which stories have priority for implementation. Hence the trades-off of one piece function against another are much clearer.
I wouldn't call it scope creep for the users to get the function they choose in the order they influence.
Here's a simple heuristic, regardless of whether you're working on a month-long iteration, 1-2 weeks, or even a Kanban-like environment, where features are added in a continuous stream:
If your PO (or customer) adds features, but expects the deadline to stay the same - it's feature creep: If he changes the scope and his expectations accordingly, it may not be "Scrum" but it is agile.
If your PO adds features that do not bring any value to the customer, then it's scope-creep of the worst kind - waste! If the features bring value, it is being Agile.
I think there are two kinds of scope creep:
1.) The extension of the scope of a project without increasing the payment/budget/time availableto the developers. This can happen in an agile process just us with any other process when the pm/scrum master or whatever doesn't stick to the figures and squeezes another feature into the project/iteration/sprint.
2.) the extension of the scope of a piece of software, beyond what it usefull. I think agile processes might actually help against this kind of problem, because the cost of a feature is very directly communicated to the project owner, so costs, should be very transparent. But the main tool against this kind of scope creep is the same everywhere: With every feature you have to check: do we really need it? Do we need it in this software? Or does it belong somewhere else? Or in management speak: what does it cost to build, what does it cost to maintain (often forgotten), how much does it increase revenue.
The answer to At what point do you tell the client that, 'No, we cannot do that change, because of ?' depends on the value of ?.
There's usually not a good reason to say "We cannot do this change." Some things you might say:
We can do this, but it'll mean X, Y and Z get dropped from the sprint goal.
We can do this, but it'll mean slipping the release schedule.
We can do this, but it will need additional testing.
We can do this, but first we need X hours of refactoring.
We can do this, but first we need to stabilize or revert in-progress feature X.
We can do this, but we could do X a lot faster and still deliver most of the same value.
We might be able to do this, but we need to task it out before we can estimate it.
We might be able to do this, but we need to spend X days doing a spike before we know for sure.
(1)-(5) just boil down to "Writing code takes time" -- with varying levels of detail. The (2)/(3) combo is probably the closest to the traditional idea of "scope creep." (In theory software developed by an agile team is always in a releasable state, but few teams are that good.) But scope creep is only a problem if it means the product owners making unrealistic demands on the development team. As long as the development team provides realistic estimates and the product owners accept them, dev shouldn't care how far the scope manages to creep.
If the development team has an unhealthy relationship with the product owner, and what you really mean is "Boy howdy is that dumb and I do not want to work on it," the usual response is to make the feature look really, really expensive.
Given that one of the main benefits of agile is the exchange of realistic estimates for realistic delivery dates, though, that's not a good place to be..
The most principle weakness of Agile is that most people who are doing "agile" really are flying by the seat of their pants. Things shouldn't change within a single iteration, but you should allow for change outside of that.
If the client is willing to pay, why should you say no? If there is only one client paying for it all, then he pretty much is in full power of what do develop ("if you don't do it, I will take my money and tell someone else to do it"). But of course, if the product has a large audience, then you need to have a well-defined focus of what the product should do, as adding unnecessary features may lower its usability.
Some situations come into my mind, when the development team might recommend the client to not implement some features. After that it's the client's responsibility, if he anyways wants to implement it. If the feature conflicts with some other, more important features, then it would be wise to not add it. If the feature does not give much value to the client, compared to the cost of implementing it, then it might not be smart to burn lots of money on it. Also in some cases it might make more sense to implement some features as a separate program, if their purpose is very much different from the original program - it's better to have many small applications that each do one thing and do it well, than one humongous application that does everything but is specialized on nothing.
Why should you say No? I don't know which flavor of agile development you're using.
Scrum is the most prescriptive / has definite rules to cater to this scenario.
The PO (Product Owner) maintains the (things to do list) backlog. He decides which items go into the backlog and their priority. The PO is free to add more items to backlog at any point of time. He is not free however to change the sprint backlog (i.e the things the team has begun work on for the next couple of weeks)
In case of an emergency (some new knowledge), the PO can choose to abandon the sprint and start a new one with different backlog items.
Scope Creep shouldn't happen any more - unless you bend the rules. You have a truck that will carry 500 boxes (release plan), To add 100 boxes (new features) to the plan, the PO would have to first remove (descope) 100 least-wanted boxes from his original set.

How do you avoid waiting for requirements when using iterative agile development methods like SCRUM? [closed]

Closed. This question is off-topic. It is not currently accepting answers.
Want to improve this question? Update the question so it's on-topic for Stack Overflow.
Closed 9 years ago.
Improve this question
We attempt to do agile development at my current job and we succeed for the most part. The main problem seems to be that the developers on the project are always waiting for requirements at the beginning of the sprint and rushing to get get things down by the end. The business analysts who are delivering the requirements are always working non-stop to get the requirements done.
EDIT: Additional Information:
We are customizing a COTS application for our internal use. Our 'user stories' just consist of what part of the application we will be customizing in the specific sprint and also what systems we will integrate with internally. The integration with different systems normally works pretty well because we can start working on that right away. The 'customize x screen' are the main problems areas because the developers can't do anything from that. We have to wait until we get the requirements from the BAs before we can really do anything.
EDIT: More insight/confusion perhaps:
I wonder if part of the problem is that the screen that are being customized are already there as this is a COTS product that is being heavily customized. People suggest that the user stories should be along the lines of 'make a screen that does X'. That's already done. Maybe there isn't a good way to do user stories for these requirements... maybe this need to be a whole new question.
Don't wait. Build a prototype based on whatever minimal requirements you do have and get feedback ASAP from the product owner. More often than not they don't know what they want anyway - if you can show them something tangible as a starting point you're more likely to get useful feedback. Also, once you have a better idea of the real requirements you will probably have already gained a lot of insight from developing your prototype.
If I understand your situation correctly, the BAs are the ones falling behind. There are two things you could try.
Try either small sprints or smaller requirement chunks. Either way the work for the BAs should be more concise and managable.
Take an interation to rework or bug squash. That should give the BAs sometime to get ahead of the curve.
If, however, the problem is that the BAs need to see the previous requirements in the "wild" before making more requirements you have much bigger issues. :)
At a previous position we managed this by asking our business customers to be a week ahead or so. Sure this breaks from some of the strict interpretations of agile but it made things so much easier. We would have both testing and the business working a week or 2 off from development so when developers were working on iteration 2 testing is working on what came out of IT1 and the business is on IT3. Priority was always given to active development so sometimes it broke down if a story was particularly flexible (i.e. the business had to spend lots of time revising things mid iteration) but overall it worked well.
Update to respond to the questioneers Update
It seems to me those don't really stand on their own as stories then and maybe the BA team needs to reevaluate how they are writing stories. I mean you can't reall "tell a tale" with customize X screen. In theory a story should be something like "When the user goes to screen X they should be able to modify (and save) the floozit"
Sounds like the BAs may not be handing you your user stories for the sprint in a timely manner.
I take it that there is no sprint planning sessions from what you say.
Given that one of the big tenets of Scrum is that the development team takes responsibility for what they will work on per sprint, it sounds like this ain't too agile to me! (-:
Apart from having short sprints that is.
Well, a couple of things might help
- In the SCRUM process, there is the concept of Product Owner wchich is a Pig Role, this represents the customer. So you can invite the PLM or the client's main contact to your SCRUM's meeting. This will give your customer's some buy-in into your process and will get them to work "with" you on your goals
- Weekly builds to the client might help. So, the basic idea of the weekly drops is to show the customer "progress". So if for a few weeks there is no progress, this should raise the question "why?" and then you should be able to explain that it is for the lack of requirements finalization.
Hope this helps
the "user story" is a placeholder for a future conversation, so get in front of the customer and ask them; if that's the BA's job, light a fire ;-)
Your user stories are incomplete. 'Customize X screen' is a task, it doesn't describe any requirements or completion criteria. The user story should be something like 'Allow Nancy to see the related purchase orders for an item in inventory'. Then break that down into tasks during your sprint that you can work on.
Once the BAs have developed a workable user story then add it to your product backlog, prioritize it, and plan your sprints for the top backlog items. The BAs should be developing user stories and adding to your backlog independent of your sprints, and thus not blocking you. During a sprint the tasks are completed and the user story does not change. After releasing the customer provides feedback which goes into the product backlog as more user stories.
I see a few ways to handle this:
Option 1, Under SCRUM, you should have a Product Owner who is managing your product backlog, which is supposed to contain requests for features of the software. If the feature consists of something vague like 'Customize screen X' and you decide to add that to your sprint, then the sprint tasks should be concrete, decomposed tasks, and I would say one of those tasks has to be 'Define requirements for screen X'.
During the daily SCRUM, when you're asking your three questions of each team member, the developer who has that screen mod task will say "I'm blocked waiting for requirements from the BA.", and your scrum master does what they can to get that moving along.
option 2, in my opinion, is that items do not go into your product backlog until they're defined well enough to do at least some productive work on. We all know requirements change, but the point is that you're supposed to have enough to start with.
Easy.
Allow yourself to think outside of Scrum's strict rules, and get back to your lean roots:
http://availagility.wordpress.com/2008/04/09/a-kanban-system-for-software-development/
http://leansoftwareengineering.com/2007/10/31/spreadsheet-example-for-a-small-kanban-team/
http://www.infoq.com/articles/hiranabe-lean-agile-kanban
Trust me, once you get that flow going, you'll never look back.
As it is said above, usually at the beginning of each sprint you should prioritize the existing backlog and pick some stories for the current sprint. If there is not enough user stories for the developers, you should shift developers to another project and let the product owner some time to create a decent (=large enough to feed some team) backlog for the project.