Perforce changelist does not show any files - perforce

Using P4V 2009.2.
I have used P4Win in the past, but this is a new setup for me.
The problem is that the files I have checked out disappear from the changelists, so I cannot check them in.
To reproduce:
Check out a file, make a change to it.
Go to the 'pending changelist' tab.
There will be a + sign on the default changelist.
Click on the plus, or on the changelist line, the plus will disappear, there will be nothing in the changelist.
Try to check the file in by right-click on the file itself, the changelist dialog will show up but NO files are listed.
You can transfer the file to a new changelist, the same thing happens.
Looking at the file in the 'checked out by' window does correctly show the changelist number & description.

It sometimes happens to me, and what I normally do is change workspace and then change back again. Not sure if there is an easier way to get it to realise the files are checked out.

the only thing I can imagine is that you are looking at a different client workspace. Notice that the "Pending Changes" tab has a filter on the top, where you can separately filter for folder/files, user and workspace. Maybe the filter is set to something so that it doesn't match the client workspace where you have actually checked out the file.
Good luck,
Henrik

You may get this if the perforce server has not been upgraded. Old versions of P4D have this error: http://kb.perforce.com/article/1167/opened-files-missing-in-default-changelist
If that is not an option, use p4Win.

I agree with jhwist,sounds like your looking at a different client spec.
P4V is a bit confusing on this front, IMO and I personally prefer P4 Win but to check, open up a command prompt and type p4 changes -s pending -c YOURCLIENTSPEC - chances are that the changes you think you have aren't in your current clientspec

This can happen sometimes and in my experience it is a refresh issue with p4v. Often simply closing the pending tab or reopening p4v solves the problem.

In my case, the pending List has over 4000 files, (due to eclipse created so many files after mvn tasks) so none of them are shown. I created a different pending list, then cleared all contents, then moved the files to the new change list. Then it is appearing in the new change list.

Modify the file directly in the correctly mapped client folder (i.e. your current workspace). You will see the changelist for sure. As jhwist mentioned clear filters if any and choose your current workspace (since you may have many)

Related

P4V Get Latest does nothing

I do not want to go "Get Revision" > "Force". Because half of my stuff is already downloaded. I don't want to overwrite what I already have. P4V Can clearly see that what is in the depot and what is local is completely different. How can I get Perforce to retrieve the files I do not have, and ignore the ones I already do?
Select your workspace root, go to File > Open Command Window Here, and run:
p4 clean
This will scan your workspace and force-sync everything that's different or missing, as well as deleting unadded files. Note that if you have local work that isn't in a changelist, this will irrevocably erase it. If you only want to "clean" files that are edited/present but out of date (and disregard added/deleted files), do p4 clean -e instead. If you want to preview the operation before doing it for real, do p4 clean -n.
I think you can do the equivalent via the "Reconcile Offline Work" tool in P4V, but it may require additional manual steps.
To make working with Perforce easier, try to avoid modifying files in your workspace that are read-only -- if you want to remove a file from your workspace, use "remove from workspace" in P4V rather than manually deleting it, etc. Perforce is able to make file operations very fast by virtue of knowing what's in your workspace and not having to re-check it each time, but you eliminate that benefit when you mess with your workspace manually.
Instead of p4 clean, you could do:
reconcile offline work on root of workspace then a pop-up saying that you deleted some files and it is going to delete them from Depot of the server as well make sure you added to default or new changelist or whatever. Accept.
Go to changelist and right-click press revert files to bring back the deleted/missing files.

How to achieve less intrusive workflow in Perforce? (Fed up with read-only files)

At work, we use a version control system called Perforce. Bizarrely, it makes all the files downloaded from the repo readonly. It then demands you tell it (p4 open) whenever you want to edit any one of them. This is tedious, and really interrupts my concentration--I just want to edit a file on my computer, not think about version control.
Is it possible to have a less intrusive workflow? I'd like to edit files on my computer as I see fit. Then when I'm done, group and title them into a commit/changelist.
You can totally control this workflow.
Here's what to do:
Change your client options to specify "allwrite"
re-sync your files and they are all now left writable
Edit files as you wish
When you are ready to submit, run 'p4 reconcile'. It will figure out what files you have edited, what files you have added, what files you have deleted.
Submit your changes
As you say, edit your files on your computer as you see fit. Then, when you are done, group and title them into a changelist and submit them.
Here's some docs for the "allwrite" option: http://www.perforce.com/perforce/doc.current/manuals/cmdref/p4_client.html
If you work in Visual Studio, then I would highly recommend checking out P4VS. I think that would resolve most, if not all, of the issues you're having with the workflow.
You could also use the "Allwrite" option in your workspace, which will leave all files writable. If you go this route, you'll still need to mark the files for edit and group them into a changelist to a submit, but it won't interrupt you while you're programming.

How do I force Perforce to add files to changelist?

I'm a very fresh user of Perfoce, so please be patient!
I am trying to create a commit (I understand it that in Perforce it is called a changelist) of the files which have been changed. It sort of happens automatically in other VC systems, but there seems to be no easy way of doing it in p4... The problem is (maybe) that I'm not editing the files by hand, the files are generated (please don't ask me why do I have to check in the generated files...) so the whole directory tree is getting removed and then copied over with the new files. But Perforce acts as if nothing happened. In both my workspace and the depot it displays the updated files, but when someone will check them out on another machine, the files will be of the previous version.
I'm fine with doing it either through GUI or through the command line. I'd prefer the command line, because that would spare me the trouble in the long run, but it doesn't seem like it should be much hassle either way.
In other words, let's say, this is the workflow I'm used to from SVN or Git:
Run status to see what changed.
Stage / add to commit what you want to be in the next revision.
Commit and send it to the versioning server.
What I'm not able to do is the "stage" phase - because the changes are not discovered automatically.
EDIT
Ah, I think, I figured it out: reconciliation was what I needed... well, I guess if you don't marry, this word would hardly ever happen in your vocabulary :)
It appears that the proper command is reconcile. Also, as Bryan Pendleton suggested there should be status, but I must have an older version of Perforces, which doesn't have this command. This command is also available from context menu in either depot or workspace panels of Perforce graphical interface, when you click on the modified file.

How to revert to an earlier revision of a project in Perforce following a deletion?

Let's say I have a project under //depot/MyProject. At changelist 1001, this project took a major change in direction, changing everything about it. At changelist 2001, it got p4 deleted. The depot is now at change 3000.
I'd like to restore //depot/MyProject back to its state at changelist 1000. Specifically, I'd like the revision history to record the fact that change 3001 is an integration of change 1000 - i.e. the last version of this project before the major change.
Can Perforce do this at all? Or do I have to rename it into something like //depot/MyProjectOriginal, because //depot/MyProject is now tainted with all those deleted revisions?
(the naive attempt to p4 integrate //depot/MyProject/...#1000 //depot/MyProject/... fails with an "all revision(s) already integrated" message)
You cannot force the integration.
You have two options: you can create a branch using changelist 1000 as the base; or sync to changelist 1000, check out all files, and then submit (a.k.a rolling back).
Option 1
If you do want the history of your changes between 1001-3000 (i.e. a fresh start from changelist 1000) then this is the better option. Using P4V, create a new branchspec and then perform an integrate from your current project to the new branch at changelist 1000. This will be submitted as changelist 3001, when you compare differences between revisions, you will not see of the changes between 1001-3000.
In the P4 visualizer this will appear as a new branch creation at 1000.
Option 2
Sync to changelist 1000, check out all files, and then submit. There should not be any conflicts to resolve. This will be submitted as changelist 3001, however when you review history you will see the everything.
I hope this makes sense, any questions, please ask.
I don't believe that you can integrate files on top of one another like that. I think that you have two options.
If you are willing to move the files, you can do a
p4 integ //depot/MyProject/...#1000 //depot/MyOriginal/Project/...
and that will integrate MyProject at changelist 1000 to the new location.
If you'd like to keep the project at the same place, you can do that as well. It's really easiest in p4v - you can right click on the folder in workspace or depot view and choose "rollback...". In the subsequent dialog, you can then pick a changelist (or date, revision, etc) to roll the folder back to. In your case, I think that you would choose changelist 1000. Stick the files into a new pending changelist (I think that this is always good practice). You can then run a preveiw (to see what would happen), save the contents to a new changelist (so that you can inspect file contents before submitting), or just go for broke and pull the trigger and submit (I generally wouldn't recommend this).
HTH
Just do:
p4 copy //depot/MyProject/...#1000 //depot/MyProject/...
This also make a nice revision graph.
Though there is an accepted answer and plenty of other solutions, none of them works for me coz I need to rollback a large directory (with GBs of data)
Here is the way I used, which works fine for huge directory:
(Suggested to do in a new and clean workspace, though not strictly required)
Assuming the directory to rollback is //depot/foo/bar and you want to rollback to changelist 1234
Make sure no one is locking any files, and make sure the directory you are trying to rollback exists in your client spec
p4 copy -v //depot/foo/bar/...#1234 //depot/foo/bar/...
p4 submit
p4 copy -v is the meat of the solution. It tells Perforce server to perform virtual copy, which means Perforce copies the files but not actually in your workspace. This avoid huge data transfer for file content (when copying and when submitting). In my case, by using "rollback" in P4V (which is doing non-virtual copy), it took over an hour just for copy, and over an hour for submit for my folder. With virtual copy, whole process took me around 1 minute.
The most important thing is, it keep a sensible history. You can see your files being updated and rolled back, and all previous history exists.
use
p4 integrate -f //depot/MyProject/...#1000 //depot/MyProject/...
The -f flag means force an integration even if they have already been integrated.
From http://www.perforce.com/perforce/doc.current/manuals/cmdref/integrate.html

In Perforce, can you rename a folder to the same name but cased differently?

Can I rename a folder in Perforce from //depot/FooBar/ to //depot/Foobar/?
I've tried this by renaming from //depot/FooBar/ to //depot/Temp/ to //Depot/Foobar/ but the end result ends up the same as //depot/FooBar/.
Once it is in Perforce, the case remains set. As mentioned by Johan you can obliterate, set the name up correctly, and add it in again. However, there is a slight gotcha....
If anyone else (running Windows) has already synced the wrong-cased version, then when they sync again the right one, it will not change the case on their PC. This is a peculiarity of the Windows file system acknowledging case but still being fundamentally case-independent.
If a number of users have synced, and it is not convenient to get them to remove-from-client too (and blasting the folders from their machines), then you can resort to a dark and dirty Perforce technique called "Checkpoint surgery". It's not for the fainthearted, but you do this:
Stop your server, take a checkpoint.
Using your favourite text editor that can handle multi-megabyte files, search & replace all occurances of the old case name with the new. You could of course use a script too.
Replay your checkpoint file to recreate the Perforce database meta data.
Restart your server.
This will affect all user client specs transparently, and so when they sync they will get the right case as if by magic.
It sounds hairy, but I've had to do it before and as long as you take care, backup, do a trial run etc, then all should be OK.
Maybe not needed anymore, but here's the official Perforce HowTo about changing file cases on Windows and Unix: http://answers.perforce.com/articles/KB/3448/?q=change+file+case
I'm not sure about directories, but we've had this problem with files. To fix it, we have to delete the file, submit that change, then p4 add the file with the correct case and submit the second change. Once that's done, unix users who have sync'ed the incorrect-case file have to p4 sync, then physically delete the file (because p4 won't update the case) and then p4 sync -f the file.
Our server is on Windows, so that might make a difference.
I guess it treats files and folders the same.
For files:
It depends (on whether you have a Windows or Unix server). We have this problem with our Windows perforce server (which versions our Java code), where very occasionally someone will check in a file with a case problem (this then causes compile errors because it's Java). The only way to fix this is to obliterate the file and resubmit it with the correct case.
I think you should remove the Perforce Cache, so that your modification can be shown.
You can rename with ABC rename to abc_TMP, then abc_TMP rename to abc, then clear cache.
Setps to clear cache:
Open windows user home folder (on windows7 ==> C:\Users\)
Locate the folder called ".p4qt"
Rename the folder to "old.p4qt"
Launch Perforce, now everything works!
NOTE: these steps will rest your default setting.
The question is over 3 years old, but I ran into an issue like this while doing a Subversion import into Perforce and figured the info I got could be useful to some. It's similar to the obliterate method, but helps you retain history. You use the duplicate command that may not have been available back then to retain the history. The process basically being:
Duplicate to temporary location.
Obliterate the location you just duplicated.
Duplicate from the temporary location to the renamed case location.
Obliterate the temporary location.
Through this you retain the history of file changes, but get them all in the new path as well. Unfortunately there will be no history of the path case change, but that seems to be unavoidable. Similar to other methods mentioned here, users will need to either manually rename the directories in their workspace or delete and re-sync to get the new path name.
Also, P4V caches the paths it shows in the tree so after doing this it may still show up as the old name. a p4 dirs command however will show the new case.

Resources