SharePoint column default values - add 10 working days - sharepoint

In SharePoint MOSS 2007, I have created a custom content type that I will be applying to a document library. One of the required fields is "Incoming Date" and another is the "Due Date".
The Due Date is always 10 working days from the Incoming Date. The Incoming Date is when the mail room received the letter, not necessarily when the document is posted to the library.
From here: http://msdn.microsoft.com/en-us/library/bb862071.aspx
=DATE(YEAR([Incoming Date]),MONTH([Incoming Date]),DAY([Incoming Date])+10)
adds 10 days, but how can I add 10 working days? I don't have the luxury of VS.NET either per the governance plan of our sharepoint rollout.
Assume a human is responsible for the data entry, but I would like to make it easier for them.

It's overkill for the very specific '10 days' requirement, but this should calculate a due date for any number of days from any start date.
I wrote it to match the result of Excel's WORKDAY function (which, given that every function in a calculated field is an Excel function, should almost be a thing). It's tested for 1 to 146 "days to complete", for each day of the week, and across years, without any sign of inconsistency. Unless I made a typo copying it from Excel, it should work as advertised. The only down side is that it doesnt do holidays, but if the users are accustomed to SharePoint they wont have expectations anyway. At all. Of any kind. For anything. Or hope. Or the muscles in their face that used to be responsible for smiling. Or the ability to look at a child and see anything but the bleak certainty of withering death. So, not a big deal if their task is due on Christmas. It's also sloppier than it probably needs to be.
=[Start Date]+[Days to Complete]
+ ROUNDDOWN([Days to Complete]/5,0)*2
+ IF(WEEKDAY([Start Date])+MOD([Days to Complete],5)>=7,2,0)
- ROUNDDOWN(WEEKDAY([Start Date])/7,0)
+ IF(AND(MOD([Days to Complete],5)=0,WEEKDAY([Start Date])=1),-2,0)
+ IF(AND(MOD([Days to Complete],5)=0,WEEKDAY([Start Date])=7),-2,0)
The first line is...obvious. The second line adds weekends. And the next 4 lines adjust for the deficiencies of the second line.

Firstly I should point out that you are making hard work of that formula, this will do the same.
=[Incoming Date] + 10
From the comments you have figured out that 10 working days (M-F) will always have 2 weekends so you can use this
=[Incoming Date] + 14
But this still doesn't take account of holidays
You are not going to be able to do this without some custom code in a workflow or possibly some javascript 'hack' and a database of holiday days for your region.
One possibility would be to default your Due Date to 10 working days from now when the record is created
=Today+14
and then rely on your users to manual alter this date if there are holidays in that period.
More details on this in a blog entry I've just written - Working Days, Weekends and Holidays in SharePoint Calculated Columns

Perhaps you can work around this limitation by using a workflow (possibly a custom one) to manage the due date? A due date implies that it is an actionable item that should be assigned to somebody anyways.
Note that VS.NET doesn't have to be a luxury - you can use it for free.

I believe I've figured out a fairly bullet-proof method for calculating a 10 business day deadline that accounts for holidays and weekends. 1) Calculate whether the 2 week period is a Monday, and if so, add only 11 days (assuming the start day counts as Day1 of your 10-day period). Otherwise, you add 13 to account for the 10 working days plus two weekends (remember, the start date already counts as Day1; your variables would be 12 and 14 if you did NOT count the start date as Day1). 2) Create a unique calculated column for every holiday and return a value of 1 if the holiday falls in the range. 3) Determine your "gross date" by adding values (weekends and holidays) to your start date. 4) Determine whether your gross date falls on a Saturday or Sunday, and if so, return the appropriate number of days to push off until Monday. 5) Add all the weekend, holiday, and added Sat and Sun values to your start date, which gives you your due date.
NOTE: The only challenges I see here is if a holiday pushes the due date into the weekend, which then pushes the due date to a Monday that happens to be yet another holiday. This didn't happen in my holiday schedule, but it might in yours. In addition, you'll need to keep adding new holidays every year, thus requiring you to recreate the column arrays from scratch for a long-running list. Alternatively, you could start a new list every year.
C_Wknd =IF(TEXT(WEEKDAY([Complaint Created On]),"ddd")="Mon",11,13)
C_NYDay =IF(AND([Complaint Created On]<=DATE(2009,1,1),([Complaint Created On])+C_Wknd>=DATE(2009,1,1)),"1","0")
C_MLKDay =IF(AND([Complaint Created On]<=DATE(2009,1,19),([Complaint Created On])+C_Wknd>=DATE(2009,1,19)),"1","0")
C_MemDay =IF(AND([Complaint Created On]<=DATE(2009,5,25),([Complaint Created On])+C_Wknd>=DATE(2009,5,25)),"1","0")
C_PresDay =IF(AND([Complaint Created On]<=DATE(2009,2,16),([Complaint Created On])+C_Wknd>=DATE(2009,2,16)),"1","0")
C_IndDay =IF(AND([Complaint Created On]<=DATE(2009,7,4),([Complaint Created On])+C_Wknd>=DATE(2009,7,4)),"1","0")
C_LabDay =IF(AND([Complaint Created On]<=DATE(2009,9,7),([Complaint Created On])+C_Wknd>=DATE(2009,9,7)),"1","0")
C_ColDay =IF(AND([Complaint Created On]<=DATE(2009,10,12),([Complaint Created On])+C_Wknd>=DATE(2009,10,12)),"1","0")
C_VetDay =IF(AND([Complaint Created On]<=DATE(2009,11,11),([Complaint Created On])+C_Wknd>=DATE(2009,11,11)),"1","0")
C_ThxDay =IF(AND([Complaint Created On]<=DATE(2009,11,26),([Complaint Created On])+C_Wknd>=DATE(2009,11,26)),"1","0")
C_XmsDay =IF(AND([Complaint Created On]<=DATE(2009,12,25),([Complaint Created On])+C_Wknd>=DATE(2009,12,25)),"1","0")
C_GrossDte =[Complaint Created On]+C_Wknd+C_NYDay+C_MLKDay+C_MemDay+C_PresDay+C_IndDay+C_LabDay+C_ColDay+C_VetDay+C_ThxDay+C_XmsDay
C_EndSat =IF(TEXT(WEEKDAY(C_GrossDte),"ddd")="Sat",2,0)
C_EndSun =IF(TEXT(WEEKDAY(C_GrossDte),"ddd")="Sun",1,0)
Resolution Due =C_GrossDte+C_EndSat+C_EndSun

Related

Replace a date with another date on a file

I'm working on a way to automate a report that sometimes has different dates that fall out of a period. For example, my report has data similar to the below that has different sets of dates. Each period consists of two weeks, I'm trying to replace all of the dates that fall out of the current period to the current period (10/15/2022 & 10/22/2022).
In this scenario, I would want 10/1/2022 to be replaced with 10/15/2022 and 10/08/2022 to be replaced with 10/22/2022. In other words, assign the first week in a prior period to the first week in the current period and the same with the second week.
Is this something that can be automated?
I'm familiar with the basics of VBA but do not know where to start.

Amazon Quicksight Dynamic date filter

so everyday I receive sales data from the previous day. So today November 15 I have data from July 2021 until November 14 2021. What I want is to show this data for the current month by aggregating by day. I use a quicksight visual with a MTD (Month To Date) filter. Everything is fine so far.
The problem is on each first date of the month, I see "No Data" on my visual which is normal since I do not have any data from the current day/month but as I said earlier from the day before.
So what I want to achieve is:
Each 1st of current month: show data from the whole previous month
From 2nd to last day of current month: show data from the current month
Can someone help me please to know how I can achieve this?
I looked for ways to do this and I found dynamic default parameters but this option is not fine with me since I have to fill a username column according to the documentation (https://docs.aws.amazon.com/quicksight/latest/user/parameters-set-up.html) and I have many users so it will be not interesting to list all of them.
You can assign parameters to a group rather than a specific user which is much quicker
There is new functionality which allows you to set today or beginning/ending of month/quater/year as default.
See screenshot:
enter image description here

Cognos Report totaling hours over time

I'm pretty new to Cognos 10 Report Studio so this may be a fairly simple question but I have been unable to find on answer so far.
In my database I have the hours a person has worked in a two week pay period, as well as what month a pay period exists in. I would like to total the over any period of months.
For example a user is prompted to choose a range of time, and they may select a start month of January of some year, and an end date of June of the same or some later year, and then the report would have a column that displays the sum of hours worked by a person between that time frame.
So in essence the sum of hours for every pay period in a given range of dates.
Thank you very much for your help.
If you want a list (or crosstab) with the User, year, month, and total hours in each month
Create a new data item (maybe something called - Hours by Month) defined as:
total([hours] for [Year], [Month], [User])
The function allows you to define the scope so the SQL is structured to give you the answer grouped the way you want

Access DB: Daily cumulative count and daily number on assignment

I have a table that tracks the dispatching of personnel. The table has the employee name and the date the person went out and the date they returned.
The table has hundreds of entries from 1988 to current.
In Excel I track the cumulative count per day (of the year) of how many people have been sent out, and I also track the number of people out on any given day. The table lists the Month & Day in the first column (every day of the year, including leap days) and the years on the first row. There is data for every date (a zero is entered until the first person is sent out that year, then starts counting up as there are more dispatches, or in the case of the number of people out each day, it will show zero if no one is out that day or if there were, say 5 people out, it would show "5" for that day). I then use the data in Excel to construct a graph that shows the number of dispatches on the y axis and the day of the year on the x axis (along with the current year’s number, the average number and the max over the 27 year history). Currently I just track this manually (I just keep a running count of each and enter it in manually in Excel.) I would like to build a query of my Access data that would return the same information that I could import into my Excel spreadsheet. One query that would show the day & month in the first column and the years along the top row and for each day show a cumulative count for that year of how many people have been sent out. Another query that has the day & month in the first column and the years along the top and a count of how many people were out for that particular day for that particular year. There shouldn't be any gaps (every day has data, even if it is "0"). I would then import those queries into Excel to replace my manual tracking that I am doing now.
I know how to construct the Excel stuff (I have that running already), and how to import info from Access to Excel, what I need to know is how to construct these 2 Access queries.
Any help/ideas on how to construct those 2 queries would be greatly appreciated!
I'd recommend that you migrate this app to a web based solution that uses a real database - SQL Server or MySQL, not Access.
"Desk drawer software" is what I call homegrown apps that someone creates for themselves to perform some small task that eventually become integral to running a business and grow out of hand. Your truck factor is 1: if anything happened to you, no one would know how to do this function. The software may not be backed up or checked into a source code management system. There's no QA. There's no way to migrate new features to production: if you alter the app, then that is what you have.
I'd recommend a web app to mitigate all the risks I've described:
You have to deploy a web app to a server, which takes it off your desktop and puts it in a central place where anyone who's authorized can access it.
Separates database from display issues.
Makes you think about how to archive historical data. Partitioning by year makes sense.
Likely you'll put this in a source code management system like Subversion or Git.

Sharepoint 2007 date time in a list

We are using a custom list on Sharepoint where we require users to enter data with a date and time field. We have been facing huge issues in data validity when generating reports due to this field. Following are the kinds of mistakes:
Selecting AM instead of PM or vice verse. Changing to 24 hrs format doesn't help much because then the users select (as an example) 02:00 instead of 14:00 for 02:00PM.
There are errors regarding formats of dates, hence some entries have dates from the future or the past.
As the reports are generated each week, the list needs to be populated by the end of the week. If the month has changed between the week, people forget to change the month in the calendar and the entries are of the last week of the current month instead of the last week of the previous month.
Are there ways to configure the list(Pref. without programming) so that:
A. Only working hours are available in the time related dropdown.
B. Dates from the future are not allowed( Or not available)
Any help would be appreciated.
As far as I know, you won't be able to satisfy these requirements with no custom code.
If you decide to go down the coding path, what you need to do is create a custom field type. Let me know of you need help on this.