Liferay pages export stuck in queued state - liferay

I am using liferay 6.2 version. I tried to export pages with permission and the export process is stuck in queued state for a while now.
Liferay is running and it does not pick the background-task queued.
Please advise how this can be solved.
Tried to restart liferay tomcat with no luck.

Did you stop Liferay server during background task execution?
If you killed server perhaps background tasks become inconsistent,
Execute following queries:
SELECT * FROM BackgroundTask
SELECT * FROM Lock_
And check background tasks status and locks.

Running below SQL in lportal database did the trick.
DELETE FROM BackgroundTask;
DELETE FROM Lock_;

Related

Scheduler not firing

I have a development instance on my laptop and for some reason I cannot get any Automation schedules to fire. If I create a schedule, it looks ok and shows the appropriate next execution time, but it never changes. What am I missing to enable the scheduler?
If you restored a snapshot on your site, you will need to go to screen Automation Schedules screen (SM205030) and click on Initialize Scheduler action.
This action exists in order to prevent schedules to be run directly after restoring a backup of an environment.
This was done to prevent necessary actions from happening on a test environement, e.g. spamming customers email, uploading important files to file provider, etc.
This is why this button need to be manually clicked after restoring a backup.
With the help of support, I was able to resolve this. We deleted the application from the configuration manager and recreated it. The scheduler then started working. There was nothing obviously wrong, but creating the new instance worked.

Wix installer. How to stop IIS pool

I faced with the problem in my WIX installer: how can I stop specific IIS application pool during repair, change or update?
Description: Deliver and deploy Web Application, run repair. Dialog appears that says that w3wp process locks files. In addition, because of requirements I cannot just hide that message and I cannot change Web Application.
What I tried to do:
I tried to stop service "W3SVC" with ServiceControl and it works excellent! But what I really need to do is to stop only one specific IIS pool.
I consider the way to write my own custom action to stop app pool, but as I know, I cannot schedule it before InstallValidate. Please, correct me if I'm wrong.
Please, help me overcome this issue.
You can use quiet execute custom action to shell out to appcmd to stop an app pool. You are right though, you wouldn't always be elevated prior to InstallValidate.
https://technet.microsoft.com/en-us/library/cc732742(v=ws.10).aspx
I suspect this is probably a false alarm and will resolve itself later in the installer. I would look at the various was to suppress this dialog. Maybe this would help:
WiX: Avoid showing files-in-use dialog and just prompt for reboot at end of install
First of all, please accept my great thanks!
As I understand, there are just two options to overcome the issue:
Add <ServiceControl Id="iisServiceControl" Name="W3SVC" Start="both" Stop="both" />, in case of you agree to stop the whole service
Add set property<Property Id="MSIRESTARTMANAGERCONTROL" Value="Disable" Secure="yes"
/> and schedule your custom actions to stop/start your AppPool.
I guess to use options 2 due to the requirements. BUT, as I think, the best solution would be to say that after InstallValidate validator should just ignore some kind of processes filtering them by the name.

DNN 9.01.01 Export/Import Stuck on Submitted Status

We are transitioning to DNN 9.01.01 build, but it seems that the import/export feature is not working properly. I submitted an import but it has been sitting on submitted status for the last 8 hours.
Is this a known issue or is there configuration on the server that preventing the import/export to work?
Our instance is installed on Azure
Thanks
This thread hasn't been touched in a long time but I dug around and found the problem. I fixed this problem by directly editing the DNN database. I'm on version 9.4 although, I'm sure this would work with any version as this issue is apparently caused some wonky code in the Azure AppService deployment packages.
To resolve, I just had to manually edit the dbo.Schedule table. I use Azure Data Studio because I'm on a Mac but SSMS or any other manager will work as well. I'm sure you can even use the DNN built-in editor although I'm not very familiar with it.
While digging through the dependencies I noticed that unlike the non-operational Export/Import job, all the working jobs had a NULL value in the "Server" field whereas the Export/Import job had the Azure server name written to it. I manually changed the value of this field to NULL and the Site Import job that had been perpetually spinning, started immediately.
Also, for posterity, you will want to make sure you don't have 15 different import jobs queued up before you do this because they will ALL begin processing once you commit the new value to the DB. If it took you a few times to figure out they were spinning you will probably want to go to the scheduler and delete anything you don't want to run prior to the DB edit.
Hope this helps save someone else some time. Cheers!
We contacted support as well and looks like it was an issue with installing DNN as Azure webapps.
We had to delete all the unused server and set the task to run on the current active server and start the import/export feature manually on the scheduler tab.
I had this issue, when checking the other task scheduled for execution I noticed the server field was empty while on the import/export there were comma separated inputs. When I cleared the import/export field the task ran correctly.
I believe they left out coded for this I'm DNN 9. I tried using it for a customer and it was useless.
I inquired and got a response that said it was an oversight.
To add to the possible issues that can cause this, We had renamed our server and the scheduled task still had the original name of the server. Once we changed the name to the new one under the task, it started running as scheduled.
HTH
Dave

Liferay 6.0 not responding

I'm having a strange issue with my (i admit) very old liferay. Sometime yesterday morning my system broke down and doesn't start up again. I have no idea why it broke down.
Now when I restart my liferay again according to the logfile it starts fine. But when I try to acces the page via browser all I get is inifite loading. No log messages, no exceptions, no timeout, nothing. This all was Liferay 6.0.5 and JBoss 5.
I then downloaded a Liferay 6.0.6 bundle with Tomcat 6 and connected it to my oracle db. Same behavior. Next thing I did was not using an oracle connection so liferay used its built-in memory DB. And voila, startup worked immediatly. reconnecting to oracle results in failure again. I tried this liferay-tomcat bundle with all needed themes and portlets.
Then I undeployed all custom webapps and startet again and suddenly my log showed this message: No theme found for specified theme id <MY_CUSTOM_THEME>. Returning the default theme.
So the request must reach liferay somehow. Sadly the browser still doesn't show anything.
I'm short on ideas so I'm grateful for any help. Btw: I'm planning to relaunch with liferay 6.2 and an other db schema in couple of weeks, so a dirty workaround would totaly be enough for me.
Thinking out of the box: Is it possible to export all data from my database as sql inserts, etc and import them into liferays memory db? I know the memory db is not build for production use, but since it's only a couple of weeks I might give it a shot.
EDIT: I switched back to my jboss 5 and liferay 6.0 setting. I just noticed another strange thing. When I type a non-existent like liferays default community url (not configured in my particular portal instance) I see this message in my log Current URL /de/web/guest/home generates exception: null
. So apparently the illigal requests are recognized but legal requests are not served.
Thanks guys and regards. Sebastian

Liferay - shutdown

I am using liferay 6.1.0 GA1.
In my project, I am using two nodes for my portal.
When I'm using default liferay shutdown option, it's restarting one, which I suppose is good behaviour. Is there any way I can synergize/merge this liferay shutdown option to work on both nodes?
Edit: Additional question. Where I can change default behaviour of shutdown?
I have not done something like this. But here in docs i gives some ideas.
global.shutdown.events=com.liferay.portal.events.GlobalShutdownAction
When you define this action in portal-ext.properties and implement it, it will run when the portal shuts down. In this action you can call a custom script to stop the other instances also.

Resources