Is there a way to prevent billing in Windows Azure trial offers? - azure

There is a new trial offer available for windows Azure which gives you 25 hours of small computing instance time a month and other things like 1 GB SQL Azure and more. See link below: http://www.microsoft.com/windowsazure/offers/popup/popup.aspx?lang=en&locale=en-US&offer=MS-AZR-0001P
Now my question: Is there a way to prevent exceeding these limits? I only want to try and don't want to be billed.

I believe you don't need a credit card to use the 30 day pass - the one from here:
http://windowsazurepass.com/

as far as I know there is no automated way to have it turn it off before you get billed. You will need to just be very careful about monitoring your usage manually.

For Doobi's suggestion, I believe you need a promo code to get the free 30 day trial. There is a MSDN blog post with the code MPR001 here.

Related

How can I create the free 250GB SQL Server Database promised with Free Azure Subscription

I created my Free Azure subscription and have been hosting a couple of Apps out there since around April of this year (2020).
All of my resources; Subscription, Resource Group, AppService, and Apps are F1 service rather than S1 to ensure they are running free and my cost forecast for the month should always say $0.0. This was something confusing in the beginning that I had to reach out to Microsoft to help me with in setting up my hierocracy of resources.
In my main web app I now need to deploy an SQL Database. I've been developing using LocalDB in my ASP.Net Core 3.1 app.
Now the Free Azure description here:
https://azure.microsoft.com/en-us/free/
gives these specs for SQL Server with your free subscription for the first year:
250GBs. Now I'm thinking 250GB of storage, not memory. But when you start selecting your DB configuration they are talking memory. So now I'm confused with that. Do you get 250GB of Storage or memory with free SQL Server with free Azure subscription.
Also, the free service really just says free SQL Database. Not free SQL Server. So I am confused here as well. Do you just get one Database? I know you have to set up an SQL Server in order to set up the Database.
Next I found a quick tutorial on creating an SQL Server Database her:
https://learn.microsoft.com/en-us/azure/azure-sql/database/single-database-create-quickstart?tabs=azure-portal
I want to go through the three versions of this tutorial:
Using:
Portal
Azure CLI
PowerShell
so I can get a feel for the environment and find the way that best suites me.
I am going through the Portal tutorial first.
On step 9, the default is General Purpose, Serverless.
This says "up to 40 vCores, up to 120 GB memory".
But you are supposed to have 250GBs with the free subscription.
So this is not it.
I click provisioned and now it says "up to 80 vCores, up to 408 GB memory".
Well 408GB is too much; over 250GB.
So I click, "Looking for Basic, Standard, or Premium?"
And from there click Standard because it is the 250GB configuration I think I am looking for to get the free SQL Database with the free Azure Subscription. (Again do I just get one database?)
But now instead of talking vCores, the cost is per DTU. What the hec is a DTU? I tried to read up on it. Seems like a unit of performance rather than a transaction. So standard is estimated at 10 DTUs a month I believe. Hopefully that does not mean 10 transactions per month but rather again a measure of performance.
Estimated Cost $15 dollars a month.
That "Standard S0" above scares me I think that would start charging me.
It should say F1 shouldn't it.
I've come accross some similar questions to this online. A lot of people seem to have the same confusion and question I have. Main question is how do I get an F1 level database for my app. And is one database all I get. That would suck. Not really a free subscription then since most web apps in ASP.Net/Core which is Microsoft are dynamic and need a DB and Azure is Microsoft right?
Or should I just go ahead and review and create. And S0 is just how they do it for free Azure subscription? Like you wouldn't get charged for S0? But I don't think so.
Trying to get a concrete answer somewhere so I know how to proceed.
UPDATE 10/20/20
I have just gone in a different way and am creating an SQL Server instead of Sql Database.
This appears to be free and cost estimate per month says:
"No extra charges"
Ok everybody.
Let's consider this a tentative answer until it all proves out to be true.
I opened up a support ticket with Azure/Microsoft.
Here is part(s) of the response I got:
First, I would like to thank you very much for providing me with such a detailed service request. After my investigation, I was able to determine that the estimated price does not show the discount with the free services. Therefore, using the S0 database in Azure SQL Database at the Basic service tier will be included in the free services. The free service limitation states that you can use up to 250 GB. So, anything deployed below 250 GB is ok to use if it is correctly configuring all around. As long as you stay within the limits, you're will not be charged.
My reply here:
So thank you for the information on S0 being considered free as part of the F1 subscription.
(Although, I really wish they would include next to S0 on the pricing sheet to use as part of F1 in parenthesis or something)
Does it matter if you use vCores or DTUs?
And if you use DTUs does it matter if you go above the max?
Or as you said I guess as long as I stay under 250GB I'm ok.
Her response continued:
Lastly, I would like to leave you with a link on how to avoid charges on your free service account: https://learn.microsoft.com/en-us/azure/cost-management-billing/manage/avoid-charges-free-account.
I hope this information was beneficial to you, Sam. Please let me know if you have any additional questions.
Everybody notice the link to track your free services which enables us to make sure we do not use a service outside of the free services or exceed the amount of what we get with a free service. I think this is a gold mine find of a URL.
And one more question I sent her:
Can I create a 250GB application for each app I deploy out there.
Or do I only get one and have to make all my apps share it?
At least we know that Basic S0 is free now.
I will update this answer with better information as I work through the details.
This is the best answer.
I have worked out a procedure that works for me.
And I understand a lot of things better now.
It seems like the whole answer is not in one place since Azure is so vast and everyone's
scenario is different.
So I wrote up an article to document what worked for me.
I hope this helps someone out there:
https://ctas.azurewebsites.net/TechCorner/AspNetCore3/HowTos/DeployWebAppWithLocalDbToAzure

Azure Pay-as-you-go typical pricing

I am required to learn Azure Databricks as well as other Azure services that require something more than just the Free Trial. I don’t really have any problem doing this.
However, my question is how much can I expect to be charged monthly, weekly, etc. when strictly performing learning-related tasks?
I just want to become familiar with the services and just Azure in general, but I want to know what other people’s experiences have been. I don’t want to set up clusters on a Databricks project just to learn and figure it out and end up costing myself 50 bucks for something I’m really just testing.
Any help would be appreciated. Thanks!
You can get very far without actually paying anything, especially with the free trial. However, you can also accrue extremely high costs very quickly in pay-as-you-go. There are too many Azure Services to get any more specific within the scope of this site.
Three tips to get you started:
Use the Azure Pricing calculator for the services you want to learn to get a feeling for the costs and how they develop.
Set a budget on your subscription to avoid accidentally spending too much.
Delete your services as soon as you are done with them, even if you need to recreate them the next day. You often pay by the hour.

Extend Azure 30 day trial

I signed up for a 30 day Azure trial 3 days ago. I have 2 vms. Today, I have 2 messages popping up in my Management Portal.
Your Free Trial expires in 25 day(s). Click here to upgrade now.
Based on your usage history ($21.52/day), you might use your remaining credit in about 3 days.
25 days left $67 credit remaining
I feel like I cut the "speed-up countdown" wire on a time bomb in an 80's movie.
I'd like to fully evaluate Azure and I'm just getting started. Clearly I missed something along the way that is preventing me from getting the full trial period.
Microsoft Support just gives me Azure's sales phone number.
Does someone know what I need to do to get a trial extension and stop the countdown from going too fast.
Thanks!
There isn't a way to extend the trial period. If you have disable the spending limit, you account would operate without any problem, but yet, you would start incurring cost.
These are the ways you cut down costs
Reduce the size of isntance - say small ( A1 )
Recduce the instance count
At any point in time if you are not using your instance, you can stop the instance and you cost near ZERO cost during that time.
If you have MSDN Subscription or BizSpark Subscription would would get $150 everymonth as credits
I have noticed that costs can be quickly used if you keep dropping and creating the database for testing purposes on azure, best to use existing database

questions about windows azure 90 day trial

Just a quick question about the windows azure trial.
If i get the windows azure 90 day trial
will it show on my debit card?
could i be charged at all, i heard they put a spending limit on all trial accounts, however can you still be charged at all, even if you dont take the spending limit off?
the larger the vm you make (small to large for example) the shorter
it will run as it uses more compute hours?
thanks.
You should provide credit card, but won't be charged, so it won't show in statement.
If you excess you limit, they just will disable your account, but won't charge anyway.
Not sure about third question.
You will need to provide a credit card for verification purposes, but you won't be charged unless you explicitly switch to pay-as-you-go. And yes, the larger VM you created the quicker it will use up the free trial credit. The current trial gives you $200 or 30 days, whichever you hit first.

Microsoft BizSpark and Azure - What kind of instances are provided for free?

I apologize if this is in the correct StackExchange site. I couldn't find a place that seemed perfectly suited for this question. My question is as follows..
Being a Microsoft BizSpark member I have access to free Azure hosting. The hosting provided is 1,500 hours a month of small instances free (this equals out to 2 small instances running 24 hours a day for a full month). The details of the offer go on to state "You can run 2 Small instances full-time or other sizes at their equivalent ratios."
Does this mean I can run one Medium instance for 24 hours a day for a month, for free? If you look at the pricing, a Medium instance is exactly twice as much as a small.
Does anyone have any experience with this that can chime in? Many thanks in advance!
Yes, I know, I use BizSpark subscription and I have advised and follwoing couple of fellow ISV to use it. And yes, you are correct, the BizSpark gives you 1500 small instance hours, which is 1 full month of single Mednium sized instance. This is in terms of compute. But you know that if you run only one instance, you are not covered by the 99.95% SLA! The SLA only takes place when you have 2 or more instances per role!

Resources