Pair Programming with an uneven number of team members? [closed] - agile

Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 5 years ago.
Improve this question
Recently, we've come across an issue at work where if one person is working on some code by themselves, it seems to come out with the other team members looking at it and going "Huh? That's ugly, unmanageable, I need to rewrite that"
In fact, recently, I myself have had to re-factor something that was written the week before so that I'd be able to add in my (related) feature.
I know that Pair programming is the way to go for this, but we have an uneven team (3 members). As our team is being pushed pretty hard at the moment, we really don't have time for Peer Reviews (though we can do Pair Programming, as we're allowed to estimate that into our task estimates)
I'm just curious as to how people would suggest we overcome these issues with poor code being generated.

When you work alone, and produce code which your colleagues find ugly and unmanageable and needs to be rewritten, then do you:
(a) agree with them when you look at it a second time,
(b) disagree?
If (a), then the problem is that on your own, you aren't fully clarifying your code when you write it. Since pair programming is the only thing making you write decent code, I suppose I'd recommend that the "odd one out" should work on tasks which do not involve writing long tracts of bad code: bug-hunting; maybe writing test code, since that tends to be a bit less fiendish. Meanwhile, work on improving your skills at writing better code - perhaps do reviews of your own code from a few months ago, and make notes as to what was wrong with it.
If (b), then the problem you have is incompatible ways of expressing your ideas. The code may not be bad by your standards, but it's mutually incomprehensible, which in a corporate setting means it's bad code. Pair programming means what you write is a compromise that 2 out of 3 of you understand, but that's not really a solution. You need to come to some mutual agreements about what you find most difficult about each other's code, and stop doing that. And you all urgently need to start thinking of "code quality" in terms of "my 2 colleagues will like this code", not "I like this code".
Either way, you all need to work on writing code for the purpose of being read, rather than for the purpose of getting the immediate job done as quickly as you possibly can. Personally I have done this by trying to express things in the way that I think other people might express and understand them, rather than just what makes sense to me at the time. Eventually it becomes habitual. When I write code, I write it for a public audience just like I'm writing this post for a public audience. OK, so on my personal projects it's an audience of people who think just like me, whereas at work it's an audience that thinks like my colleagues. But the principle is to write code as if someone's reading it. You're explaining yourself to them, not the compiler.
Not that my code is the best in the world, but I do think I benefited in that my first job was in a company with 30-odd programmers, so I got to see a wide range of ways of thinking about things. Also a few examples of "what not to do", where one programmer had done something that nobody else could easily understand, and therefore could definitively be said to be bad. With only 3 people, it's not clear whether a 2 v. 1 difference of opinion means that the 1 is a freak or a reasonable minority. When I did something and 4 or 5 people could glance at it and immediately say "eeew, don't do that", then I started to really believe it was just a dumb idea in the first place.
I'd also recommend that if you aren't allowed to budget for code review, lie and cheat. If you're heavily re-writing someone else's code, you're effectively taking the time to review it anyway, you just aren't providing the feedback which is the worthwhile part of code review. So sneak the review in under the radar - write a function or three, then ask a colleague to look at it and give you instant feedback on whether it makes sense to them. It helps to have a conversation as soon as you've done it, with the code on the monitor, but do try not to interrupt people when they have "flow", or to get into lengthy arguments. It's not pair programming, and it's not formal code review, but it might help you figure out what it is you're doing on your own that's so bad.

I'm surprised that you don't have time to do peer reviews but you have time to do paired programming. Is the latter not a much bigger sink of time?
We also have three developers only at our company and, surprise, surprise, we're being pushed hard at the moment. I'm pretty sure my boss would laugh at me if I suggested paired programming because that would be viewed as doubling the number of man hours for a task even though in practice that's not the result it should produce. Our peer reviews are never more than an hour and that is an extreme case. On average I would say they are probably about 10 minutes and, per developer, only happen once or twice in a day.
IMO you should give peer reviews a try. You often find that the offending people (i.e. the people writing the lower quality code) eventually realise that they need to make more of an effort and the quality improves over time.

If you have three developers and each of you think the others code is not good, you urgently need peer reviews.

So:
you are being pushed pretty hard
your code is of poor quality
Do you think the two could possibly be related? The answer is to fix the schedule.

Pair up all three at once.
Set up some coding standards.
Use a dunce cap for build breaking developers.
Perform daily stand up meetings to communicate progress.
Also try peer reviews twice a week, like Tuesday and Friday.

Pair Programming doesn't have to be all day every day to be effective. I have seen good results from even an hour or two working together each week. One way to go would be to pair A & B for a while, then A & C, then A & B... with a lot of individual time in between.
It also depends a lot on the personalities and chemistry of the team members. Two of the three might work exceptionally well together and you'd want to benefit from that.

You should still pair. Set up sessions say 1 day per week and rotate the pairs. This should keep your manager happy and increase the quality of the code, improve communication. If you keep metrics on how many faults happen in paired vs solitary coding you should start to see the benfit and display this to your manager,
eg This took x man hours but saved on average y in defect fixing. Additionally the clode is cleaner and will take less time to alter then next time we touch it.
From there you will have hard statistics and you can start to code more.
Basically your story seems to be the same as mine.
No time to do things.
Mistakes happen.
Rush to fix it (taking more time)
Go to 1
You need to stop the rot.

Code reviews
Enable Stylecop that will force you to write readable, standardised and manageable code

We use code reviews. Additionally there are some single task: changing a diagram, installing some stuff...

Related

When working in agile, how should my work habits change? [closed]

Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 5 years ago.
Improve this question
I am working in a dev team where we religiously follow agile.
However, I have not had to change how I work (unit testing etc doesn't count as I do that anyway). I mean, do I need to change how or how often I communicate? This soft skill side of things with agile is what I am interested in.
Thanks
If your team is utilizing agile well, then you probably should see some changes in how you work. It's possible that you already developed with a fairly "agile-compatible" mindset, even if your previous work experience was in a more waterfall-style methodology.
Some specific things that I think agile developers ought to be doing (and in a well-run agile team, will naturally find they need to do)
Focus on incremental, complete changes rather than massive architectures - This is a core tenant of agile from the macro planning side, but it's also important to practice even for an individual developer. With a 2 or 3 week iteration, you'll find you simply don't have the time to spend 1 1/2 weeks developing something, and half a week integrating it all together.
Check in early, check in often, and check in working code - Don't do this, and you'll soon find you're that guy famous for breaking the build with a day left before the iteration ends.
Know what's blocking you, and what is likely to block you in the upcoming week or two, and tell people about it - No one in an agile team likes hearing at the last second that a developer working on a critical piece is held up waiting for something to complete his work.
Think about the end of an iteration throughout the iteration - Every line of code you write should be done with the consideration of whether this is realistic to complete before the iteration is over.
Always Be Crunching (hey, I couldn't have a pithy list of advice without a cute, Glengarry Glen Ross ripped off acronym!) You'll learn by your second or third iteration that slacking off for a week followed by some all nighters is going to bite you in the ass.
If you're already following all these - great! They're certainly general best practices rather than being specific to Agile. I think most developers do have a bad habit or two that this list addresses, though (I know I do on occasion.)
In addition to Ryan's great points here are a couple more.
Discuss your ideas with other members of your team. Your fellow developers will quickly point out potential flaws in your thinking and suggest alternatives (be ready to listen and not get offended). I found this works best during planning/story tasking. In a 2-3 week sprint it is painfully obvious when you go down the wrong path. It might even stop you from successfully finishing all you tasks/stories. If others know your plan of attack up front it makes it easier for them to step in and help you out finishing your work if you need it.
Do not hesitate to suggest new ways of doing things. One of the great things about agile is that team processes are not set in stone but evolve from a series of retrospectives. If you have developers who never speak up, the process never changes and things do not get better.
Put your user's hat on. Every application has an end user. Sometimes (especially when you do not have a close contact with your users) you have to step back and question decisions (even if made by a product owner). If you can make a good case, not only your users but the entire team will benefit from it since the product will be better received. Developers do not do this often enough. We want to make things better, faster and leaner in the expense of other, sometimes more important things like delivering on time or adding more features.
I hope this helps.
The specifics of agile will be different for every person you ask. Yes, you probably want to communicate regularly, but you don't want to take it to extremes that keep you (or your coworkers) from being productive.
But like I said, it will be different for everybody. The only people who know how best to match your team are the people on your team. Just tell them you aren't used to agile and you were wondering how you've been handling it. They're really the only ones who will be able to say for sure.
Short answer but was very useful to all developers that asked me that question:
There is a book called Practices of an agile developer,http://www.pragprog.com/titles/pad/practices-of-an-agile-developer.
This book will specifically answer to your question. I like it very much because it's not just about the process, but behaviors and psychology.
Attitude-related things:
1) Good pair programming means making an effort to explain things really well and listening carefully. That's a skill in itself. You have to learn how other people tackle things and be patient when other people tackle things differently from you.
2) Being prepared to be flexible and change your mind. The smaller the ego, the easier and less painful it is to handle this.
3) To do agile well, you need to be communicating continuously with everybody in the wider team (i.e. not just devs - sysadmins, managers, customers, network admins, hardware people...) Part of this is feeling comfortable, safe and confident - i.e. there needs to be real trust in the team, not just phoney trust - real trust
4) Be prepared to work outside your specialism and comfort zone. I often have to pair with graphic designers, system admins and DBAs. Saying "that's not my job" isn't part of agile. We're part of a multidisciplinary team and getting the product released in a useful state is the whole team's problem - not just looking after my pet specialism.
5) Try to keep things simple and minimal - no "we'll make it totally generic" or "we'll need it later". Think "you aren't gonna need it." We're shooting for small, simple, concrete steps informed by feedback.
6) Tackle the difficult things and the things that aren't clear first - so that the you get feedback on the problems as early as possible so you if you have to revise estimates or cancel the work the customer gets informed as soon as possible.
7) Try to keep the team dynamics co-operative rather than competitive. Pitting people against each other pulls the team apart - and it gets you well-polished fragments and a broken product rather than a cohesive whole made by people that give-and-take as they find necessary to be successful.

Time Tracking and Agile Methodology [closed]

Closed. This question does not meet Stack Overflow guidelines. It is not currently accepting answers.
This question does not appear to be about programming within the scope defined in the help center.
Closed 9 years ago.
Improve this question
I work in a large outsourcing company based in India. I am in the US and have a team of 3 developers and we are using scrum practices and have had great success with our approach.
My problem is that our company requires us to estimate time on activities monthly whereas we work on weekly iterations. The system provides a list of 45 activities. To give an example of how granular it gets, we have activities like Coding, Coding Review, Coding Rework.
Now everyday we are supposed to enter actual time aginst these activies. And to make things worse the system for time tracking is very poorly designed and is very slow.
The rationale the management has behind this process is that they want to use this time logged to forcast future work. But the problem is that there are no processes in place to ensure that we enter correct time. So we end up putting any numbers and the end of the day.
This is affecting productivity and morale of the team and defeating the whole purpose.
What are you thoughts on Time tracking in an Agile projects?
What are you thoughts on Time tracking in an Agile projects?
100% waste: when asking you to do this, your managers are actually keeping you from working on code which is the only thing that really adds value to the product (not even to mention that the application you have to use is slow, poorly designed so this looks actually closer to 200% waste). This really sounds like outdated command and control to me. This should be handled by the ScrumMaster as an impediment.
Make sure and bring this up as and impendement to your scrum master, also bring it up in your retrospective.
Because you may have to live with it let me suggest two approaches:
Be as accurate as possible and give an estimate at the end of the day.
Write a front end to the clunky reporting system. Figure out and easy to use and time saving interface, write it, then have it feed the clunky old system.
Unless you work in a ROWE, chances are time should be recorded somewhere so that whoever is paying the salary knows where the money was spent. How useful this is and how much it can be used can be debated forever. Evidence-based Scheduling may be the idea that your management has, which has the potential to work and the potential to backfire terribly.
I'd be tempted to see if management would agree to some inbetween timeline here so that the iterations and planning align. The problem with trying to plan 3-4 weeks down the road is that what happens in the next 1-2 weeks can dramatically impact that. My suggestion would be to see if a 2-week timeline could be agreed so that almost a half-month is planned at a time. It is a bit of a compromise but assumes that whatever system the monthly data goes into would accept something biweekly. An alternative would be to do monthly iterations though that may cause some upheaval I'd imagine.
Time tracking can be useful if there is trust, honesty, and most everyone is respectful about the information. This can be asking a lot as I'd imagine many have been burned by such systems. Does management know of the slowness and poor design of the time tracking? For example, if it is taking an hour a day to log all the time and you can explain why that really is the case, there may be an opportunity to get a better system. A key point here is to know what specifically are the problems, why they are problems and what kinds of suggestions could be made as while I'd say that time should be tracked, one could use spread sheets for a relatively low-tech way that may not be great for management, but part of this is accepting trade-offs, IMO.
Sounds like the time tracking is probably a bit too granular, or too rigid in its entry. What if, instead of having you enter time for each category at the end of the day, they instead asked you to keep a log that you could fill out with what you were currently doing during the day - so you'd get something like this:
8:30am - 9:45am: Coding
9:45am - 10:00am: Coding Review
et cetera.
This is a tough one. The problem is that the time used will NOT forecast future work. That's very well documented and a dangerous trap many fall into. Velocity can help to forecast future work but it obscures the hours by design.
The problem with the approach is this: Not all hours are alike. Capturing hours turns work into "ideal" time. Future work is the estimated not by the team that is doing the work (and no 2 teams are alike), but by management that has used those hours to come up with some algorithm. Sound familiar? It's not Scrum or Agile. Management neither understands the process of Scrum nor has bought into it.
Having that confusion is not good. Clients believe you are providing something you are not, team members work under false assumptions, and management is not there to provide the support you truly need.
So, it really won't matter what you put down for hours... very likely the process will fall back into a non-agile approach which will be statistically as accurate as just making up hours and reporting them randomly. At the risk of sounding ridiculous, you might as well save your time and just make up hours.
Now, if time is used to see how much you spend doing interviews, that's easy to gauge without a tracking system.
If the time is used for billing, that's a different story. That's not Scrum-related, but a part of business process.
I was in a formal testing class, and the lecturer was trying really hard to convince one of the student to use timesheet to track time, because the entire software engineering/project management theory is based on that time sheet to do linear projection.
The problem is the reality is nonlinear (depends on the level volatility of the project)
Agile process like scrum focus on people not process, but how about people and business.
because we mentioned that tracking time was using for billing customer. the problem with tracking time is it may hurt people. for example, you estimate task and do it 10 day, next time you do the similar task and now with 10 days you cannot do it because of some unpredictable reasons, even your scrum master or PO can understand and share with your the feeling of missing the deadline(not entirely your fault)...BUT how about others behind that layer, top managers, other project managers, other developers...they may read it wrong that you had issue with your performance....so for me tracking time should be fine if we have a way to do it completely behind the developers and we then use that data to analyse the root cause and feedback for the team to learn from it. the tricky part is doing without creating bad feeling for the people which I still cannot find any workplace can do this well except rumor said that Google is the place with their fancy style.

sentimental code [closed]

Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 7 years ago.
Improve this question
I've come across an article that discusses the issue of "code admiration". Basically, the author talks about how developers should be more skeptic about code they write. How we may "admire" our code too much, attach our-self to it, making us more vulnerable to bugs and other mishaps that may be lying in front of us.
How do you feel about this issue? And do you have more tips on how to avoid/be more aware of this issue?
Some years ago, I was working with another on a small "hobby" project, and I realised that we had to re-assess things. We had written lots of code but it wasn't all good code.
We didn't really want to "throw away" all the work we had put in. But I realised something: what mattered most was the amount of work we would need to put in from now on.
We couldn't change the fact that we had already put so much work into the project, so the only way to minimise the total amount of work the project would need, would be to minimise the amount of work we hadn't done yet.
Since that day, I have stopped being attached to my code. If I'm confident that throwing it away and starting from scratch means less work than keeping it and adapting it to my needs, then I'll throw it away.
My high school art teacher used to encourage us to take what we considered to be our best drawings and tear them up; he called this "cleansing the soul". His reasoning was that, as artists, we were driven to create works of art, and any time we produced something that we liked and that gave us satisfaction, our motivation to continue creating would be lessened.
So I followed his advice and tore up my best stuff, and it worked. Instead of spending my time admiring my old work, I created new stuff and continually got better. I've tried to follow the same principle with my code, but it doesn't really work: my computer has a tough plastic shell that is nearly impossible to tear through.
I post a fragment from Jeff Atwood's blog, Sucking Less Every Year, and I agree 100%.
I've often thought that sucking less
every year is how humble programmers
improve. You should be unhappy with
code you wrote a year ago. If you
aren't, that means either A) you
haven't learned anything in a year, B)
your code can't be improved, or C) you
never revisit old code. All of these
are the kiss of death for software
developers.
We sure like to admire our nice code, but it's not always easy to know what to admire. Complicated and elaborate code is sometimes mistaken for admirable code, while elegance and simplicity should rather be what to strive for.
Two quotes come to mind:
"Debugging is twice as hard as writing
the code in the first place.
Therefore, if you write the code as
cleverly as possible, you are, by
definition, not smart enough to debug
it.”
-- Brian Kernighan
and
"Make everything as simple as
possible, but not simpler."
-- Albert Einstein
Jonathan Edwards wrote an impressively beautiful essay on this subject, prompted by the work on the O'Reilly book Beautiful Code. Here's the final paragraph, but the rest of the essay is also worth reading.
Another lesson I have learned is to distrust beauty. It seems that infatuation with a design inevitably leads to heartbreak, as overlooked ugly realities intrude. Love is blind, but computers aren’t. A long term relationship – maintaining a system for years – teaches one to appreciate more domestic virtues, such as straightforwardness and conventionality. Beauty is an idealistic fantasy: what really matters is the quality of the never ending conversation between programmer and code, as each learns from and adapts to the other. Beauty is not a sufficient basis for a happy marriage.
Other versions of this same wisdom exist in other fields. Samuel Johnson, about writing:
Read over your compositions, and wherever you meet with a passage which you think is particularly fine, strike it out.
William Faulkner's version of this was much more succinct: “Kill your darlings.”
My father-in-law works as a film editor, and he studiously avoids the set where the film is being shot. When he does have to visit, he shields his eyes as much as he can. This is because when he decides whether or not to include a scene in the final film, he doesn't want to be influenced by how much effort it took to shoot the scene. What matters is how well the scene works in the final film.
My essay, "My evolution as a programmer" (which I would link to if I weren't a new user), is largely about learning skepticism about the code I'd written: whether it works, whether it's useful, whether it's comprehensible (pair programming was a real wake-up call here). It's hard!
I never admire my code. I admire other peoples code that i "borrow" and try and emulate them or better them and i find that the more i know, especially about coding the more i find i don't to know. The only thing of value wold be for peer programmers to admire my code and borrow it.
I think he has a good point. It's frustrating to work with people that have too much of this, as it really hinders teamwork and getting to the best solution to the problem.
As I can be a bit delusional, I try to put practices in place that will keep me grounded in reality. For code,
unit tests: These keep me more focused on what the code is supposed to do, as opposed to any abstract "beauty".
shared code ownership: There are two camps here: give people more ownership of their code and hope pride takes over, or give them less and let peer pressure come into play. I believe that giving people more ownership can lead to this code admiration. We practice shared code ownership, so I am constantly forced to see someone rewrite my perfect code to make it better (in their mind). I quickly realized admiring it too much was a waste of time and emotionally difficult.
pair programming: working side-by-side with someone will keep you realistic.
other feedback: These are all feedback loops, but there are others. There's no better way to see if something works than by watching someone (try to) use it. Put your work in front of as many people as possible. Have code reviews. Read other people's code. Run static code analysis tools.
I'm with PurplePilot - I don't admire my own code, and as such I'm constantly searching for new, more efficient (hell, easier) ways of doing the same thing. I like the Effective c# book, picked up lots of useful code from there that I admire.
I would have no hesitation about throwing code away and starting again, but not necessarily from scratch, i.e. by writing some code for a specific scenario and then throwing it away, you'll probably have a better grasp of the scenario. In other words, it's a "wicked problem", or you've found another way that doesn't work a la Edison.
It begs a wider question: if code isn't thrown away, or at least revisited, is developing on libraries that are becoming stagnant a good thing?
There is nothing wrong with admiring your code ... this is part of the positive reinforcement process that will motivate you to write more and better code in the future.
However, misplaced or misused admiration can be a problem. If the code is really not good, or has bugs that haven't been exposed by unit or other testing, or needs refactoring/redesign/replacement then this misplaced admiratoin is a problem. And using admiration as an excuse to skip part of the process - such as code reviews, or not having a skeptical attitude towards code - is misuse of admiration.
Like anything else that is good, admiration of code can be misplaced or misused - it doesn't mean that it in itself is bad. That would be like saying "religion is a bad thing, because it causes conflicts and wars between people".
Two words: code review.
Gather two or more fellow developers and invite them to review/criticize/comment on your code. 'twill shed some (admittedly harsh) light on your code.
It's perhaps better to have a healthier perspective - we aren't rocket scientists, and we aren't curing cancer - it's just work.
(Yes, it's reasonable to be proud of an entire building you helped build if you're an architect, but do they really have a lot of their self-esteem wrapped up in an individual blueprint, or a closet on floor 3 they designed by themselves?).

How to educate a development manager about the difficulties of software design? [closed]

Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 5 years ago.
Improve this question
I have had a few development managers who don't seem to understand or appreciate the difficulties of software design and implementation.
Such managers believe that processes and methodologies completely solve the problem and I have a tough time explaining to them that it is not so and that you cannot read a book on the latest process fad and hope to get results by applying them as is.
The latest frustration I have is to convince my manager to
(a) Give me requirements not piece-meal but a larger set as far as possible.
(b) Give my team lead time to think about how to design, thrash out a few alternatives, work out an implementation sketch, to plan out the tasks etc.
The frustrations are compounded because of Agile methodology and the interpretation of it that says not to do up-front design (as against BIG up-front design in Waterfall), product owner can change requirements at any time and so son.
So far I haven't had much success and have to put up with the resulting frustrations.
Can you give me some arguments that can convince such managers?
EDIT-1:
Retrospectives are done, though not always at the end of every sprint, and the problems are brought up. But as I mentioned, my manager doesn't appreciate the need for design lead time and the frustrations with piece-meal requirements.
EDIT-2
I don't have a problem with changing requirements. I understand that it will be so, but imagine this: You want a small feature to begin with and then you keep adding more around it. After a few iterations, the design cannot handle it anymore and a redesign (not refactoring) is required. This could have been solved better with an upfront design in the first place, had the related features been investigated together. Its not BDUF, its the natural way of doing it (what I call software engineering common sense).
My manager doesn't understand why I ask for time to redesign (a few times I just call it refactoring so that it fits the Agile way of doing it, but it really is redesign) and not developing and demoing new features.
Every time requirements are changed (or increased) so should
the estimate to complete and,
the assessment of risk
Start giving updated estimates (even if you have to guess) and lists of risks every time you get an updated or new requirement. This will help your manager make the connection.
Try to do this in a spirit of helpfulness--"for planning purposes"--so that you aren't perceived as obstructive or lacking "can-do attitude." Remember that estimates can (in theory) come down, and risks can be reduced.
Business requirements are going to change no matter where you work. It's not your fault, it's not your boss's fault, it's not anybody's fault. The entire point of taking the requirements on piecemeal is to encourage you to think about the problem at hand, not some other problem that you might or might not need to solve. It's quite liberating once you get into the rhythm of it.
Think of upfront design as premature optimization. You may not need it, and even if you know you need it, you'll know more about your design two weeks from now than you know about it today. It'll help you solve your engineering problem with the best possible knowledge about the state of your code.
That having been said, edg is absolutely right. When you add more requirements, the estimate changes. This isn't the fault of the developers or anyone else; more work means more work no matter how you square it. If your boss doesn't realize that adding requirements will result in a larger estimate for the project you need to explain to him that Agile isn't a magic bullet that allows you to add more features without paying anything for them.
Agile Simple Design doesn't mean don't do ANY design/architecture up front.
It means do the minimal design up front, so that you will not pay a horrible price for reasonable change requests.
Scott Ambler talks about Change Cases - http://www.agilemodeling.com/artifacts/changeCase.htm
James Coplien talks about Agile Architecture - http://www.infoq.com/presentations/Agile-Architecture-Is-Not-Fragile-Architecture-James-Coplien-Kevlin-Henney
http://blog.jaoo.dk/2009/03/04/handling-architecture-in-the-agile-world/
The art/craft in all of this is in how to slice the architecture in a way that allows:
relatively fast convergence on overall architecture/infrastructure - on the order of days per months of estimated development time.
developing "just enough" architecture/infrastructure per each feature/requirement
doing the right balance of preparations for the future compared to focus on the features of today.
Its important that your Product Owner is aware of all of this balancing act as well, and you work collaboratively. He should understand that if you disregard all thinking for the future, each change will be very costly. There is a price to be paid for flexibility.
Its btw very similar to investment in QA and test automation. You pay something now, that will pay off only after X times you test the code. if the code never changes it was a waste of effort. but everyone knows that most code changes...
Buy your manager this book. That's what I did, and it worked great :)
First of all this issue seems quite sensitive, so all I wrote below is just my personal opinion, and not necessarily a wise thing to do.
In my opinion you cannot make software if you do not know what problem it should solve. If requirements come in small parts that are too small to oversee the problem, then I would just fire questions about the parts that seem to be missing. Like: "okay so the software should do X, but does that also mean Y or otherwise maybe Z? Because if it is Y then ... but if it is Z then ..." Of course if the manager is in the middle of extracting the requirements then he cannot answer, but at least he knows that there are still open issues that influence development.
About no lead time for design: design and development are an iterative process that could go hand in hand. It is just how you name the thing. If the manager wants to see some code at the end of the day, okay then I would just use the first half of the day to design and the second half of the day to make some code based on that design. If the manager does not want to see the design, fine with me then I'll just show the code.

Scrum: Resistance is (not) futile [closed]

Closed. This question is opinion-based. It is not currently accepting answers.
Want to improve this question? Update the question so it can be answered with facts and citations by editing this post.
Closed 8 years ago.
Improve this question
I'm the second dev and a recent hire here at a PHP/MySQL shop. I was hired mostly due to my experience in wrangling some sort of process out of a chaotic mess. At least, that's what I did at my last company. ;)
Since I've been here (a few months now), I've brought on board my boss, my product manager and several other key figures (But mostly chickens, if you pardon the Scrum-based stereotyping). I've also helped bring in some visibility to the development cycle of a major product that has been lagging for over a year. People are loving it!
However, my coworker (the only other dev here for now) is not into it. She prefers to close her door and focus on her work and be left alone. Me? I'm into the whole Agile approach of collaboration, cooperation and openness. Without her input, I started the Scrum practices (daily scrums, burndown charts and other things I've found that worked for me and my previous teams (ala H. Kniberg's cool wall chart). During our daily stand up she slinks by and ignores us as if we actually weren't standing right outside her door (we are actually). It's pretty amazing. I've never seen such resistance.
Question... how do I get her onboard? Peer pressure is not working.
Thanks from fellow Scrum-borg,
beaudetious
While Scrum other agile methodologies like it embody a lot of good practices, sometimes giving it a name and making it (as many bloggers have commented on) a "religion" that must be adopted in the workplace is rather offputting to a lot of people, including myself.
It depends on what your options and commitments are, but I know I'd be a lot more keen on accepting ideas because they are good ideas, not because they are a bandwagon. Try implementing/drawing her in to the practices one at a time, by showing her how they can improve her life and workflow as well.
Programmers love cool things that help them get stuff done. They hate being preached at or being asked to board what they see as a bandwagon. Present it as the former rather than the latter. (It goes without saying, make sure it actually IS the former)
Edit: another question
I've never actually worked for a place that used a specific agile methodology, though I'm pretty happy where I'm at now in that we incorporate a lot of agile practices without the hype and the dogma (best of both worlds, IMHO).
But I was just reading about Scrum and, is a system like that even beneficial for a 2 person team? Scrum does add a certain amount of overhead to a project, it seems, and that might outweigh the benefits when you have a very small team where communication and planning is already easy.
Without her input, I started the Scrum practices (daily scrums, burndown charts and other things I've found that worked for me and my previous teams (ala H. Kniberg's cool wall chart). During out daily stand up she slinks by and ignores us as if we actually weren't standing right outside her door (we are actually). It's pretty amazing. I've never seen such resistance.
Question... how do I get her onboard? Peer pressure is not working.
Yikes! Who would ever want to work in such an oppressive environment? If you're lucky, she's sending around her resume and you'll be able to hire someone who is on board with your development process.
Assuming you want to hang on to her, I'd turn down (or off) the rhetoric and work on being a friend and co-worker first. If the project is a year late, she can't be feeling good about herself and it sounds like you aren't afraid to trumpet your success. That can be intimidating.
I know nothing about Scrum, however. I'm just imagining what it would be like to walk around in your co-worker's shoes.
beaudetious, buddy,
I would really suggest you read Steve Yegge's blog called "Good Agile, Bad Agile". It's an oldy but a goody, and I think it's a must read for anyone - like myself about 2 months ago - who gets a little let's say "over-eager" to agile-up their workplace. Agile offers a lot of good practices, but you have to take them all with a grain of salt and adopt what you're lacking and skip out on all the other crud that might be unuseful for a particular situation - e.g. the daily scrum. If your co-worker would just like to code in quiet (read Peopleware for why this is a good thing) and she's being a productive team member quit bugging her with your scrumming a let her work in whatever way she likes most.
People are usually less "hostile" about these practices if you just approach them and simply say "Do you have a sec? Listen, communication is really a problem right now, I feel like I don't know what you're doing and I really don't want to step on your toes again and spend two days writing something you already did like last week, so let's work on this. I'd like to try X, what do you think?". Be compassionate and don't tolerate "bad apples", that's literally how I agiled up my workplace, and many problems have started evaporating. We're by no means an 100% XP or 100% Scrum compliant place, because we just use whatever works and was needed.
Simple. Don't talk about scrum. Don't use scrum on her. Instead take the underlying principles of scrum (e.g. the purpose as opposed to the application) and create different approaches that accommodate her way of working but have subtle tints of scrum.
All humans are different and a lot of programmers dislike scrum. I wouldn't force it upon them as that would just be counter-productive. I'd suggest identifying the problems in the development process (in a non-scrum fashion), see if you can get her to agree that the issues exist, then ask her what she thinks would be a good solution. Her co-operation and input into the process is essential to her co-operation, if she doesn't have buy-in she wont become a citizen.
From there on in you can hopefully create some sort of quasi-hybrid scrum + her approach to the process where you can both agree on the way forward.
I think the key would be to help her understand why you are doing Scrum in the first place. I guess you have your reasons, so why not tell her? You are likely to get resistance towards any change if the people involved don't understand why there is change or what they will benefit from it. If you can explain your reasons for using Scrum, and the following benefits, to her in a way that relates to her everyday work, I think she is more likely to adapt a more positive attitude towards it.
If she sees no value in the Scrum process, or doesn't understand how it relates to her, she probably won't care about it.
I think one of the most important concepts for someone to understand regarding Scrum is the fact that you are working as a group and commit to your project as a group, not as individuals. For many people, this is the hardest thing to grasp, since they are so used to living in "their own World".
I'm not sure Scrum is the central issue here; I'm guessing she feels threatened by the new guy bringing in a lot of new ideas and stirring things up. I've been in that situation before as the new person bringing in a new perspective on things, and sometimes it's just difficult to immediately bring those existing people around to a new way of thinking. It often requires a culture shift which doesn't happen overnight.
Try to get her input and opinion on things as much as possible, and try to show that you respect that she has been on the team longer than you. If after a while she still doesn't participate, then all you can do is mention it to your Manager and let them take it from there.
Continue your efforts to involve the other developer. Remember you are the one who wants to make this change. Ask for help with problems you have. Invite them to the daily stand up meeting. I currently do the planning for the daily stand up and I make sure all the pigs and chickens are invited. If you are the lead on the project it is up to you to address the situation and take a risk. Put yourself out there.